Post Job Free
Sign in

Engineer Maintenance

Location:
Saudi Arabia
Posted:
February 23, 2016

Contact this candidate

Resume:

[pic]

Roberto Nagal Estira

P* B** L* Parklane Country Homes

Brgy,Santiago, General Trias, Cavite

Mobile: +63-977-*******

Home: +63-46-402****

***********@*****.***

Working Experienced:

Mechanical Site Engineer

Hyundai Engineering & Construction

Singapore

September 19, 2012 - July 26, 2014

PROJECT 1: South Beach Tower - South Beach Road

PROJECT 2: Asia Square Tower 2 Project - Marina View

Job Description:

. Read and Review Mechanical Specifications and Contract prior to formal

Site Assignment.

. Attended Daily Tool Box Meeting and do echo with subcontractors.

. Attended handing over of Food Garden to the Client and Tenant

. Attended Site Coordination meeting with other trades to discuss any

issues observed and resolved together.

. Coordinate with Design Team / CSD Team issues encountered at Site for

shop drawing revisions

. Coordinate with HDEC Constructions for any possible issues encountered

related to Structural Design that can delay the installation of M/E

. Coordinate with Interior Design for their installation to proceed

without delay from M/E

. Directly Reporting to Mechanical Assistant Manager or in absence of

MAM to Dept. Manager for any issues encounter at Site for resolution

. Ensure all ACMV, Fire Protection materials are approved as submitted

(RAM).

. Ensure that all equipment and installations are Tested by a Second

Parties as stipulated with HDEC M/E contracts and recorded for

documentations

. Ensure that all installations are as BCA, FSSD and LTA regulations

. Ensure that all subcontractors at site follows the Hyundai Safety

Rules and Regulation and Singapore Regulations

. Ensure that subcontractors shop drawings at site are approved and the

latest drawing.

. Request to subcontractor for rectifications of all comments provided

by RTO and request for another Site Inspections

. Review and Coordinate shop drawings with Design Team / CSD Team prior

to the installation by subcontractors at site.

. Upon completion of the installation, prepare for a Site Inspection

with Resident Technical Officer (RTO) for approval prior to handing

over.

Senior Electrical Engineer

Kandenko Engineering (Malaysia) Sdn.Bhd.

# 390 2nd Floor P5 Parkcity Commerce Square

97000 Bintulu, Sarawak, Malaysia

Project: Polycrystalline Silicon Manufacturing Plant

Salamaju Industrial Park,Sarawak, Malaysia

July 28, 2012 - September 11, 2012

Job Description:

. Design of Electrical Services

. Preparation of Shop Drawing

. Cost Estimation & Variation Orders (VO's) Documentation

. Quality Assurance (QA) Plan Preparation for Electrical Services

. Site Coordination

Facilities Manager

Ecovert K Qatar

May 26, 2010 - October 03, 2013

First Assignment: Qatar Navigation Tower (Qatargas HQ)

Tower would have 52 storeys and would be completed 2010. The tower would be

based over a plot measuring 13,516 square metres, with a total built-up

area of 116,671 sq. metres and a basement car parking lot of 13, 516

sq.metres. The six-storey car park would accommodate up to 1,700 vehicles.

The Tower would have 62,587 sq metres office space. The building would have

eight elevators to access the tower and four elevators for the car park.

Second Assignment: Pearl /Falcon Tower

Technical Data

Height (estimated) 91.91 m,Floors (above ground)22,Construction start

2002,Construction end 2004,Parking places

125, This residential tower is for single businessmen, Tower B is for

families.

Tower A offers a total of 100 apartments including 46 one-bedroom units (83-

111 sq m), 29 two-bedroom units (116 - 152 sq m), 24 two-bedroom units with

a maid's room (189 sq m) and one penthouse with a maid's room (435 sq m).

Job Description:

. Assess the current condition of electrical, air conditioning, plumbing

and other essential facilities and equipment.

. Maintain accurate records of the condition of the equipment and other

systems in the building.

. Create a schedule of regular evaluation of the facilities.

. Participate in the development of policies and procedures that affect

the use of supplies and facilities.

. Ensure that all the equipment and other facilities are working

properly.

. Create monitoring systems or programs in the institution to detect

problems as early as possible.

. Initiate interventions to solve problems in the facilities.

. Develop a system for cleaning, repair and maintenance of facilities.

. Develop back-up or alternative systems for common problems such as

power shortage.

. Ensure the safety of the building or establishment from fire, flood

and other hazards.

. Initiate an active campaign on safety measures in the building.

. Prepare pertinent records and reports for the safety service division

of the institution.

. Recruiting facilities service staff and training them appropriately to

ensure competent work output.

. Develop staff development programs such as skills enhancement

trainings and sessions.

. Maintaining the efficiency and good working conditions of the

facilities.

. Evaluate the work quality of his staff and other subordinates.

. Coordinate with other offices and units for things that are not within

the scope of the facilities service team.

. Participate in preparing the budget and so that the facilities

maintenance team will get the facilities maintenance team will have

adequate funds for its operation.

. Educate the workers of the establishment on the proper use and care of

its equipment and other facilities.

. Coordinate with the upper management on work issues.

Facilities Manager

Al Omooma Hospital -Al Reggae, Kuwait

January 12, 2008 to March 25, 2010

Job Description:

. Review the Specification of each trade (Structural, Architectural,

Mechanical, Electrical, Plumbing, and Fire Fighting), BOQ, As Built

Drawings, Operation Manual of each Equipment installed, PPM scheduling

submitted by Main Contractor for each equipment, Liability Period

Schedule and certificates in preparation for the Final Acceptance and

Handing Over of the Project..

. Witnessed the Testing and Commissioning of MEP Projects prior to the

Final Certificate issuance to Project Manager.

. Witnessed and performed Final Acceptance thru site survey of the Civil

Works for the external and interior design of the Hospital ( 7th Floor

Storey+ Rooftop) and Staff Accommodation (10 th Floor Storey+

Rooftop).

. Supervised and re- designed the Parking Area including the irrigation

system and Outside perimeter lighting system.

. Re designed the following Special Area as newly requirements of Kuwait

Ministry of Health before issuing us the Certificate of Operation.

They were: Operating Theater, IVF Clinic, NICU, ICU and CSSD.

. Witnessed the Final Testing and Commissioning of Medical Gas Plant and

Medical Equipment.

. Formulates and implement methods, procedures and schedules for

maintenance activities, assign work tasks and make periodic checks to

verify assigned tasks are progressing with maximum efficiency and

productivity.

. Make costs estimates for work as needed/requested.

. Assures efficient and economical utilization of materials, improvement

of methods and elimination of wasteful practices within the

department.

. Arranges to have appropriate department maintenance records prepared

and maintained.

. Tests the performance and operating characteristics of medical

electronic/electro-mechanical equipment of moderate complexity to

ensure compliance with established performance and safety standards.

. Diagnoses problems and performs corrective repair work and/or

calibration as required on medical electronic/electro-mechanical

equipment of moderate complexity.

. Orders parts and supplies as required in the maintenance and

fabrication of medical electronic/electro-mechanical equipment.

. Makes equipment modifications where recommended by manufacturers

and/or appropriate sources.

. Assess the current condition of electrical, air conditioning, plumbing

and their essential facilities and equipment.

. Maintain accurate records of the condition of the equipment and other

systems in the building.

. Create a schedule of regular evaluation of the facilities.

. Participate in the development of policies and procedures that affect

the use of supplies and facilities.

. Ensure that all the equipment and other facilities are working

properly.

. Create monitoring systems or programs in the institution to detect

problems as early as possible.

. Initiate interventions to solve problems in the facilities.

. Develop a system for cleaning, repair and maintenance of facilities.

. Develop back-up or alternative systems for common problems such as

power shortage.

. Ensure the safety of the building or establishment from fire, flood

and other hazards.

. Initiate an active campaign on safety measures in the building.

. Prepare pertinent records and reports for the safety service division

of the institution.

. Recruiting facilities service staff and training them appropriately to

ensure competent work output.

. Develop staff development programs such as skills enhancement

trainings and sessions.

. Maintaining the efficiency and good working conditions of the

facilities.

. Evaluate the work quality of his staff and other subordinates.

. Coordinate with other offices and units for things that are not within

the scope of the facilities service team.

. Participate in preparing the budget and so that the facilities

maintenance team will get the facilities maintenance team will have

adequate funds for its operation.

. Educate the workers of the establishment on the proper use and care of

its equipment and other facilities.

. Coordinate with the upper management on work issues.

Hospital Maintenance Engineer - Safety Officer In-charge

Dr. Abdulrahman Taha Bakhsh Hospital - Makkah

Al Omrah, Makkah, Kingdom of Saudi Arabia

March 12, 2003 - December 31, 2007

Job Description

. Directly reporting to Hospital Director and Hospital Administrator.

. Ensure that Makkah Regional Quality Program (MRQP) standard is being

implemented by all staff.

. Make a Yearly Plan Program for the Hospital Staff with regards to

safety (lecture,training,orientation ).

. Review and revise Safety Manual yearly.

. Ensures that Safety Manual is implemented and properly explain to the

Medical and Non - Medical staff.

. Ensure Safety of the Building, Security, Hazardous Materials and Waste

Disposal, Life and Fire Safety;

. Emergency Preparedness (External and Internal), Utilities, Medical

Equipment as the main task are being followed and implemented by each

department.

. Provide orientation and training to the whole staff Medical, Non

Medical and Nursing

. Conduct environmental survey, regular safety inspection and make

recommendation with corrective actions as per Policy and Procedure

. Act as the coordinator to the Hospital Safety Committee

. Ensure that all Fire Fighting Equipment, Fire Alarm System is in

operational condition as per Policy and Procedure

Maintenance Technician - Electrical Dept.

Makkah Medical Center

Al Ohmrah, Makkah, Kingdom of Saudi Arabia

March 12, 2003 - December 31, 2004

Job Description:

. Engage in operation and maintenance in the Facility which deals with

Medium and Low Voltage Supply

. Do Preventive Maintenance as per schedule plan for the following

equipment and areas e.g. (Incomer Controls,Switchgear Units, High

Voltage Transformer, Uninterrupted Power Supply (UPS),Standby

Generators (785 KW),Automatic Transfer Switch(ATS),Control Panels

(AHU,Pumps, Boilers and Fire Alarm System),Nurses Call Stations, PABX,

Pager System, Lighting,System, Small Appliances, Hospital

Accommodation (Male and Female),Telephone System, and CATV system

Project Management Engineer

Destiny Cable Incorporated

2285 G/F Solid House Building Pasong Tamo Ext. Makati, Philippines

January 12, 1998 - August 15, 2001

Job Description

. Coordinates with System Design Team to provide us blue print plan for

the existing projects that are being in progress and for the New

Projects to be implemented.

. Coordinate with local government for the acquisition of permits in

preparation for the installation of the pole hardware, cable laying

and other related matters.

. Monitor and supervise the activities of the Destiny Cable maintenance

in installing the hardware, cable laying of fiber optics, installing

of tap offs and amplifiers same with sub contractors to ensure that

the project will meet the deadline.

. Ensure that after installing all hardware, laying of cables and fiber

optic, all tap off and amplifiers were being recorded (data

gathering), all signals were clear, good quality before it will

declared and be shown by the subscribers.

. Submit Bill of Materials for the Project installed for the customer

services to assist and evaluate if we were getting revenue.

Test Supervisor (Final Test)

Zilog Electronics Philippines

8640 Dr. A Santos Ave. (Sucat Rd.) Paranaque City, Philippines

May 1997 December 1997

Job Description

. Supervising and motivating all operators under Final Test to achieve

production targets and ship out products with highest quality

standards

. Manage all production related activities and ensure that they are in

compliance with the define policy and procedures in collaboration with

quality department.

. Conduct study of the material, system and process improvement to

increase efficiency.

. Liase with Test Support groups for the definition and automation of

Manufacturing Methods and Procedures

. Coordinates to all department supervisors on test related problems

like, Assembly, Quality assurance Product Engineering and Equipment

Engineering

. Facilitates endorsement of tested goods units to next station through

material handler group.

. Manage and analyze cycle time of Work In Process (WIP) and maximize

tester utilization

. Provide training for the operator, certification, statistical process

control yield analysis as well as cost quality and productivity

improvements

. Ensure that proper observance of company rules and personnel under the

supervision are observing regulation on matters such as attendance and

discipline.

Safety Engineer

Meralco Industrial Engineering Services Corp. (MIESCOR)

5/FRenaissance Tower, Meralco Avenue, Pasig, Philippines

May 1996 - May 1997

Job Description

. Directly reporting to Project Engineer to ensure that all staff are

adhering the Policy and Procedure with regards to safety.

. Provide orientation and training to all staff with regards to safety

procedures.

. Make Schedule Plan to assure that all safety related matter is met on

time

. Coordinate with local government in acquisition of permits as required

for the project to be constructed or built.

. Evaluate Occurrence variance report (OVR) and made recommendation to

Project Engineer for improvement and meet zero accident.

. Make Safety audit and record all equipment, facilities before the

start of project and after the project has been done.

. Seminars Attended:

PLC Programming Simulation - IIEE-WRC November 24, 2006 Jeddah, KSA

Root Cause Analysis - Dr. Bakhsh Hospital - MakkahJune 08, 2006

Makkah, KSA

Electrical and Chemical Safety - Dr. Bakhsh Hospital - Makkah June 4,

2006 Makkah, KSA

MRQP Standard - Dr. Bakhsh Hospital - Makkah June 3, 2006 Makkah, KSA

Implementation of PSCA - Dr. Bakhsh Hospital - Makkah May 25, 2006

Makkah, KSA

Waste Management Plan for Health Care Environment - Dr. Bakhsh

Hospital- MakkahMay 03, 2006 Makkah, KSA

Data Analysis and Utilization - Dr. Bakhsh Hospital - Makkah April 27,

2006 Makkah, KSA

Working in Teams - Dr. Bakhsh Hospital - Makkah March 14, 2006 Makkah,

KSA

HAZMAT Handling and MSDS - Dr. Bakhsh Hospsital - MakkahMarch 2, 2006

Makkah, KSA

Internal Disaster Plan for Health Care Environment - Dr. Bakhsh

Hospital - Makkah February 16, 2006 Makkah, KSA

External Disaster Plan in Preparation for Hajj - Dr Bakshs Hospital -

Makkah December 15, 2005 Makkah, KSA

Fire Alarm System, Illumination Design and Calculation - IIEE-WRC-KSA

March 11, 2005 Jeddah, KSA

Importance of Energy Savings. EIB and Radio Management. Motor Repair

and Maintenance. Latest Technology Voltage Drive and Dialux Lighting

Design and Calculation in a Software Program - IIEE-WRC-KSA October 8,

2004 Jeddah

UPS, Utilizing Communication, IT Remote Management - IIEE-WRC-KSA July

16, 2004 Jeddah, KSA

ABB Drives for Motor Speed and Torque Control, Fundamental of

Generators Operation and Maintenance, Oil Free Electric Driven

Compressors and Variable Speed Drives - IIEE-WRC-KSA December 19, 2003

Jeddah, KSA

Educational Attainment: Bachelor of Science in Electrical

Engineering

University of the East- Manila, Philippines

Year Graduated: May 27, 1995

Other inclination: Microsoft Offices: Windows, Excel,

Power Point and AutoCAD



Contact this candidate