Sukhwinder s virk
Durham NC *****
Home (919) 973 - 3105
OBJECTIVE seeking a position in with full responsibility for company expansion
Industrial Maintence / Technician
EDUCATION: AAS, Industrial Engineering / Management Technology, Durham Technical College Durham, nc 1994.
Diploma. Courses Industrial Electronic Technology, Durham Technical College, Durham, NC 1991.
Special Courses Industrial /commercial Electric wiring Distribution control System, Machine shop, motor control, Electrical / Mechanical Drafting, DC Generator Power Backup system, Test Instruments and PLC.
EXPERIENCE:
6 /2008 – 11 /2015 Aerotek Engineering / IBM /HP
Packaging Equipment Mechanic, Lay off
Work on packaging line to Chang over, Ran pm, trouble shoot ink jet, over Head Conveyor System, trouble shoot and Repair Hydraulics, Pneumatics, Filler Pumps, Gear Boxes, and DC Motors Programmed new Load up new recipe for Robot Lines help other production Line to Chang over to New Batch Adjust conveyor System use Power and Hand tools use Volt meter and OHM Meter and other instrument to check Continuity to components Level and Sensors Trouble Soot and Repair, and Change over other Assign Production line, Maintain inventory and update on SAP System Report to Maintenance Supervisor
6/2005 – 9/2007 IBM /Aero Tek/ Nortel Networks work in test area to install main frame for system Test and Desk top Ran cabling main frame cabinet and other Hardware, Remove cabling and frame after test completed inventory material for shipping assist test engineer and supervisor
3/2005 - 6/2005 Sr Packaging Mechanic, coty USA sanford nc /Aero tek Temp service,
perform trouble shoot and repair on Packaging, bottle filler and other manufacturing equipment such as Barcode, High speed Labeling, and conveyor system, maintain preventive maintenance place order for new parts call certified vendor technical support for Technical factory setting rebuild process pump, motors work in machine shop to make new fixture use Lath, Milling and Spot Welding Report to Packaging manager
5 / 2004 - 7/ 2004 Packaging / Manufacturing Equipment Mechanics, Pepsi Bottling Aero tek temp service
duty was to install trouble shoot and Repair filler,Micro Blend, conveyor system and Packaging Equipment Run Preventative Maintenance, set up and Alignment bottling, case pack equipment for change over to new job as they assign Trouble shoot and repair Electrical system terminating wiring use blueprint, Hydraulic, pneumatic and (PLC ) programming logic control maintain water treatment system and chiller Recover Power shortage from Lightning use MIG – TIG welding, and Power Backup System maintain parts inventory, fill daily Work Report for Manager
9/2002 – 5/2003 Wafer/Photo Machine operator / maintenance, Temp, Cree Research Inc 4600 Silicon Dr 27703 RTP /temparery Assignment
MAJOR duty was to work in clean Room to work with Chemical multiple wafers Process Set up and Run program Instrument Rite Track Machine for resist apply adjust Programe Various Instruments for 1 inch wafer to 4 inch wafer, maintain batch Record with GMP Procedure duty included Chemical aching Process by following clean Room procedure at 12 hours shift change over and restore chemical, followed GMP, SOP,FDA Procedures
1 / 94 - 1 / 2001 SR Field installation Tech / STL, Northern Telecom, RTP / Dallas
Support DMS 100/250 Super Node System / BROADBAND Wireless USA. Installed, Configure, and Test DMS100, DMS250/BROADBAND Wireless Network Equipment. Program Network Node Equipment (NNE) Instuments Followed Engineering Document, and Schematic,Trouble shoot Print Circuit Board Component level and Repair existing mechanical /electrical Equipment. Ran wire crimping terminating wire soldering to connectors wire harness Used hand and power tool Perform System Test Insrument such as TBIRD, BER TEST,KALIN TO TEST RF FREQUENCEY, FADE MARGEN FOR SIGNAL Preventative Maintenance, Safety and Quality Audit, as a STL Manage 10 to 15 contractor with multiple sites, work on entitle, and Retrofit site material inventory for new start up project and Issue RMA upon completion of Project, E-mail Daily Report to the Project Manager.
1 / 91 - 1 / 94 Production Equipment technician, Northern Telecom,
Research Triangle Park NC.
Production Equipment Technician Duties include Maintain Robotics, pick and place Automation system, Conveyer, Pneumatics system Ran Preventative maintenance Set up and Program LTX system Test, align Photo Sensor AC / DC Drive, motor control Genrad, and Fault founder test. Use instrument such as Oscilloscope, Ohmmeter Volt meter to Analyze Analog and Digital circuit board component level. Support system test Engineer To improve Test method to get better reliability from test Equipment, and Method improvement. Maintain Shop Inventory Reprograms Equipment for various job Assignment Report to project manager.
1988 - 1991 Equipment Technician, Litho Printing co, Raleigh NC.
As a production equipment Technician duty was to maintain printing and bindery Equipment,Conyers system, low voltage intercom lighting Replace and maintain AC / DC Drive, fork lift, waist water treatment plant Ran preventative maintenance maintained Pneumatic and Hydraulic System use MIG TIG, and SPOT Welding Maintain inventory in the machine shop Report to engineering manager
SKILL Experienced with PC / UNIX, IBM 3090 Mainframe, Basic Programming, personal computer (DOS based) very strong in ms work, Microsoft Window 2000.
CERTIFIED from Nortel Networks, Basic installation, trouble shooting, Certified in Various Test Instruments system configuration, Hazmat, STL, Inventory, and site safety
REFERENCES: Available upon request.