Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
United States
Posted:
February 19, 2016

Contact this candidate

Resume:

Elibert Manuel

Commissioning Engineer / Permit to work/ Power Plant

Santa Rosa City 4026

actl81@r.postjobfree.com - 63-918-***-**** / 63-49-502**** Address

Ph-1, B-42, L-59 San Lorenzo

Sta.Rosa, Laguna, Philippines

Birth day

Dec 30,1960

WORK EXPERIENCES

1. Commissioning operation, mechanical and rotating equipments for utilities/ power plant and auxiliary system.

2. Experiences on utilities and power plant operation for LNG, Refinery & Distillation and Petro-Chemicals plant.

3.Machine Shop Operation.

4.Start-up for Boiler, Desalination Plant, Air Compressor, Steam Turbine and auxiliary . 5.Work order request using MAXIMO.

6.PTW System, LOTO, Isolation and Gas Testing.

7. Manage design reviews, factory acceptance tests, site acceptance tests, rotating equipment test runs and other testing and acceptance activities as required 8. Equipments preservation .

Willing to relocate: Anywhere

WORK EXPERIENCE

Shift In-Charge / PTW Coordinator

KEPCO,KPS Philippines,South Luzon Thermal Energy Corp.2 x 135 MW Power Plant,Philippines - Batangas City - June 2014 to Present

Responsible for operation coal fired power plant.

Panel Engineer

JG Summit Naphtha Cracker Plant, Philippines - Batangas City - November 2013 to May 2014 Responsibilities

Monitor and controlling of Boiler, Turbine, Steam Letdown, Fuel Gas, and Utilities ISBL of Naphtha Cracker Plant commissioning and operation.

Pre-Commissioning Supervisor

TCCI / Japan Gas Corp., Taganito HPAL Project - Surigao del Norte, Philippines - December 2012 to April 2013

Pre-commission and commission of

1. H2S plant

2. Nitrogen plant

3. Acid plant

4. Process plant

Commissioning Supervisor - Mechanical / Operation

3 x 48 MW CFBC Ambatovy Power Plant - Madagascar - December 2009 to December 2011 1. Supervise inspection of tie- ins for all subsystem for the project work before commissioning activity. 2. Monitor inspection of reinstatement related to instrument and mechanical system to check for final OK status.

3. Supervise and monitor all activities for the leak tests for the system before the start up of the plant. 4. Ensure that all safety precautions are in place for all lines for beings in a state of readiness for any future system work for example pad locking and spading etc. 5. Supervise and check on the running status by a initiating a dry run on all mechanical equipments boiler, Steam Turbine generators,boiler feed pump steam/motor driven, condensate pump, cooling water pump, air compressor etc. for service tests for 72 hour ensuring proper and safe functioning. 6. Testing of all logics and instruments and also ensure that the minimal optimum requirements for smooth functioning of instruments are in place.

7. Ensure the smooth and trouble free running of equipments as per the vendor data sheet specifications. 8. Facilitate the OTP (Operating Test Procedures) run as been specified Commissioning Engineer / PTW Coordinator

KBR -Yemen LNG Utilities and Off Site Area Project - Yemen - March 2009 to July 2009 1. Responsible for the operation of the Control Panel 2. Pre-commissioning, Commissioning and Operations of the Utility Systems 3. Work with the Test and Loop Check Teams and follow and adjust Project. 4. Work in loop testing-, pre-commissioning-, commissioning- and start-up works related to oil & gas plants.

PTW Performing Authority

1. All work that is carried out by personnel under my control, is covered by a valid work permit, when required, and that this one is displayed at the work place, 2. The work permit from the Area Authority prior to the commencement of any work, 3. Limitations and restrictions of the work permit in order that the work may be carried out safely. 4. All personnel involved in carrying out the permitted work adhere to all safe working practices and are fully familiar with the limitations and restrictions of the work permit and the hazards involved in the work. Using the JSA made prior to work commencing and conduct before every shift, as described into the project procedure JSA.

5. All precautions specified on the work permit are taken, 6. The work permit is revalidated as necessary

7. Area Authority is made aware of any changes in work conditions or work content, 8. Work described on the work permit is completed or left in a safe condition if not completed,

9. Area Authority when a work permit is not required, Commissioning / Operator - Power Plant

Covanta Phil. Operating Inc. 500MW Coal fired power plant - Philippines - July 1998 to March 2009 Covanta Philippines Operating Inc. / Bechtel Overseas Corp Project Thermal Power Plant 500 MW

Performs control room operational duties associated with all aspects of plant operations. The associated duties pertain to starting, stopping and adjusting controlling equipment systems. The equipment will include control panels, push buttons, PLCs DCS, switches, etc; systems will include air, steam, water, oil, chemical, hydraulic lime ash, boilers, turbines, electrical, etc. Operates and controls control fired boiler/turbine generator and associated equipment. Adhere to shift operational activities in accordance with the company's organizational policies and applicable laws. Responsible for operational logs entries and pass down of communication to other shifts. Ensures safety and environmental procedures are adhered to. Supporting company's long view plant start up/commissioning and operations readiness of one 500mw coal fired power block, including but not limited to fuel systems, ash handling, scrubber system, steam turbine generator, auxiliary equipment and other environmental controls

1. Responsible for preparation of work order request using MAXIMO. 2. Responsible for preparation of PTW System.

3. Responsible for LOTO, Isolation and Gas Testing. 4. Responsible for Monitoring of Operations, Maintenance Activities, Spare Parts Inventory, Equipments Modification on assign System Equipment Ownership. Utilities Commissioning Supervisor

Primo OLEO Chemical Inc. Refinery & Distillation Plant - Philippines - January 1997 to June 1998 Philippines

1. Responsible for Commissioning of Utilities Equipments such as

- Steam Boiler

- Water Treatment

- Cooling Water

- Air Compressor and Dyer Plant

- Demiralization & Softener Water Plant

- Waste Water Treatment

2. Re-Design, evaluate and recommend auxiliaries, components needs at utilities equipments 3. Responsible for preparation of Standard Operating Procedures and submitted to ISO 9002 4. Conduct actual technical training for newly hired Utilities Field Engineers. Utilities & Power Plant Supervisor

Filipinas Synthetic Fiber Corp, Petro Chemical Plant - Philippines - July 1986 to October 1996 Philippines

1. Responsible for rehabilitation of utilities equipments and each auxiliary. 2. Evaluate and study of utilities equipments to improve its performance on Energy Conservation Projects.

3. Directly responsible for continuous operation of Utilities and Power Plant equipments in maintaining safety, efficient in economical way,

- Diesel Engines

- Steam Boiler

- Distillation Plant

- Water Treatment

- Cooling Water Plant

- Air Compressor and Dyer Plant

- Nitrogen Plant- Chilled Water

- Demineralization & Softener Water Plant

Machinist

Filipinas Synthetic Fiber Corp, Petro Chemical Plant - Philippines - June 1980 to July 1986 1. Sets up and operates groupings of metal fabricating machines such as drill presses, lathes, milling machines, working from complex blueprints, sketches. 2. Obtains project and reviews complex blueprints, work orders, parts lists, change notices and verbal instructions to determine dimensions and tolerances of piece to be machined, sequence of operations, tools, materials, and machines required. 3. Plans, layout, sets up and operates one groupings of metal fabricating machines such as: lathes, milling machines, drill presses and grinders.

4. Makes shop calculations using handbook formulas. 5. Performs measurements using micrometers, dial indicators, calipers, gauges and other precision measuring instruments.

6. Uses basic hand tools, precision measuring devices, holding fixtures and vises. EDUCATION

B.S. Me in Mechanical Engineering

University of Perpetual Help

1983 to 1986

Mechanical Technology

Technological University of the Philippines

1977 to 1980

SKILLS

power plant,turbine, boiler, desalination, equipment preservation, water treatment, control room,.PTW, Machinist

AWARDS

COMMENDATION - Filipinas Synthetic Fiber Corp

March 1995

Effort in maintaining continuous operation of

Utilities Equipment when there was no operator

For several Instances from Jan to March, 1995

Year 2000 Best Employee Award - Covanta Philippines Operating Inc December 2000

Year 2000 Best Employee Award

CERTIFICATIONS

Power Plant Inspection Level 1

Sinclair Knight Merz

Covanta Philippines Operating Inc, Bechtel Overseas Corp Thermal Power Plant 500MW Quezon, Philippines

ADDITIONAL INFORMATION

Address

Ph-1,B-42,L_59 San Lorenzo

Sta.Rosa,Laguna, Philippines

Birthday

Dec.30,1960



Contact this candidate