Post Job Free
Sign in

Power Plant Engineer

Location:
India
Posted:
February 18, 2016

Contact this candidate

Resume:

TO

The Manager (H.R.D)

SUB: Application for post of Mechanical engineer For Suitable Post

Dear Sir,

I the undersigned is a Mechanical engineer working With Jhajjar power Limited 2 x 660 MW, Jhajjar, Haryana as an Assistant Manager Mechanical. I am having 6 years and 2 months of experience in Project Planning, Execution, Erection and commissioning, Operation & Maintenance, of Thermal power plant . I want to apply for the above mention post.

Herewith I am enclosing my detail CV for your kind consideration and necessary action .

Hoping for further communication.

Thanking you,

Yours faithfully

Kumar Gaurav

-

CURRICULAM VITAE

KUMAR GAURAV

Mobile: +919*********

E-Mail: **************@*****.***

In quest of assignments in Project Planning, Execution Erection & Commissioning,Operation and Maintenance of Thermal Power station or in EPC sector with an organization of high repute .

PROFESSIONAL SNAPSHOT

An astute professional with 6 years and 2 months of valuable experience in Erection & Commissioning, Operations & Maintenance of Mechanical system in Thermal Power Plants.

Skilled at managing maintenance, erection & commissioning activities involving resource planning, in-process inspection and co-ordination with internal / external departments.

Capable of setting priorities, developing a work schedule, monitoring progress towards goals, and tracking details / data / information / activities.

An effective communicator with excellent skills in building relationships; possess strong analytical, problem solving and organizational abilities.

EDUCATIONAL SCAN

Exam

Institute

Board

Year of Passing

Percentage

B.E.

(MECHANICAL)

K.D.K. College Of Engineering, Nagpur

R.T.M.Nagpur University

S-2009

75.33%

XIIth

DAV Kapildev, Ranchi

CBSE

March-2005

73.50%

Xth

DAV,Barkakana

CBSE

March-2003

86.80 %

TRAININGS ATTENDED

1. Institution : National Power Thermal Institute, Nagpur

Title : Induction Training About Thermal Power Plant

Duration : 8 Weeks

Description : Training Course Was Related To Power Plant Process Familiarization.

Title : Simulator Training.

Duration : 2 Weeks

Description : Training was given for Operation of 210 MW Power Plant

2. A NOSA Certified safety auditor .

OCCUPATIONAL SCAN

June 14 – Till Now: Jhajjar Power Limited 2 X 660 MW Thermal Power Plant, Jhajjar, Haryana as an Assistant Manager Mechanical

Jhajjar Power Limited is wholly owned subsidiary of HYPERLINK "https://www.clpgroup.com/Pages/default.aspx" \t "_blank" CLP Holdings, is a leading investor-operator in the Asia Pacific energy sector. CLP entered the Indian market in 2002 with the acquisition of Paguthan CCPP (formerly known as Gujarat Paguthan Energy Corporation), a 655 MW gas-fired power station in Bharuch, Gujarat. Over the last decade of doing business in India, CLP India has built a responsible, technologically advanced and diversified portfolio of close to 3,000 MW.

KEY DELIVERABLES

As an Assistant Manager at Jhajjar Power Limited 2 X 660 MW Thermal Power Plant, Jhajjar

Maintaining 90% equipment availability and 100% system availability all the time by continues monitoring on Preventive, Predictive & Conditioning Monitoring.

Maintain all the spare inventory for Belt conveyors, Wagon tipplers, Stacker Reclaimers, Crushers, Roller Screen, Plough feeders, ILMS, Dust Extraction System, Dust Suppression System, Yard Sprinklers and related auxiliaries. .

Developing new vendors for the spare and performing inspection jobs of hydraulics, belts and related spare parts and Technical Evaluations of contracts and bidding documents.

Planning and executing modification job related to system for increasing reliability and efficiency.

Analysis of root cause of failure analysis of Equipment’s, Process system & suggesting Corrective and Preventive Actions for the same with implementation of 5-S, quality and safety aspect at workstation

Asset Management: Risk Profiling, CAPEX Planning, CAPEX Optimization, OPEX Optimization

Preparing the documentation related to NOSA and ISO 14001 implementation and also carrying out the job on field for fulfilling the raised defects.

Contractor Billing/Vendor developments/ MIS report Preparation.

Channelizing the smooth functioning of CHP by carrying out all the documentation related work in SAP Software.

ACHIVEMENTS

Successfully Carried out the modification job in Wagon Tippler for unloading of the Buldge wagon.

Successfully carried out the modification job in Roller screen to control the bunker feeding Coal Size.

JUNE 2011 – 17 June 2014 : Ideal Energy Project Limited, Bela, Nagpur

Engineer

Ideal Energy Projects Limited 2 X 270 MW thermal power plant is a client company of IRB GROUP Mumbai . This organization has Main Plant set up of M/S BHEL make and Balance of Plant set of Kolkata based M/S McNally Bharat Engineering Limited.

JUNE 2011 – TILL DATE : ENGINEER

As Engineer in Ideal energy Projects Limited 2 * 270 MW Thermal Power Plant.

KEY DELIVERABLES

Implementation of 5-S at the CHP, AHP and compressed air system area .

Coordinating with MBE as well as inter departmental operation & maintenance teams.

Providing 90 % equipment availability and 100% system availability all the time by continues monitoring on Preventive, Predictive & Conditioning Monitoring.

Spare inventory maintenance.

Done the day to day problem troubleshooting.

Resource planning for reduction of downtime.

Maintenance of Pumps, Gear boxes, Compressors, Belts, Grinders, Crushers, Vibrating screens and other mechanical equipments .

Contractor Billing/Vendor developments/ MIS report Preparation.

In Project stage

Erection and Commissioning of Coal Handling system (800 TPH M/s MBE make, conveyor length 1 km), Dust Extraction System at Bunker and Dense Fog Dust Suppression System all through the Conveyor.

Erection and Commissioning of Reciprocating Compressor (2 Instrument Air and 2 Service Air for Main Plant, 3 for Ash Conveying system, 2 for Mill reject, 2 for BOP instrument air and 2 Screw Compressor for DFDS system), Vertical Pumps and Centrifugal Pumps .

Erection and Commissioning of Bottom Ash handling system,Fly Ash Handling system, Ash Water, Slurry Disposal, Recovery Water system and Clarifoculator System for Ash Handling Plant.

Erection and Commissioning of HVAC System Comprising of Centralized AC System 120 TR X 2 Units,Refrigerant cooled Package AC System 22 TR X 3 units (M/S BHEL MAKE) and Water Cooled Package AC System 16 TR X5 Units ( M/S MBE MAKE) and Centralized Air Washer Ventilation System for Main Plant and Coal Handling Plant .

Reduction in downtime by effective industrial maintenance practice.

MAJOR ACHIEVEMENTS:

Providing 100 % system & 95% Equipments availability.

Successfully commissioned - Ash handling System, Coal handling system, Compressed Air System and BOP HVAC system within the scheduled time frame for 2*270 MW.

Build the team of Mechanical Maintenance and motivate them to acquire knowledge and complete the target within given time.

Started Knowledge Sharing activities to maintenance group to minimize errors in Operation & Maintenance.

DEC 2010 – JUNE 2011: THE INDURE PRIVATE LIMITED AT GMR EMCO 2X300 MW THERMAL POWER PLANT, WARORA, CHANDRAPUR, MAHARASHTRA

ENGINEER

DEC 2010 – JUNE 2011: ENGINEER

INDURE is a reputed manufactures and suppliers of complete range of reliable Ash Handling Equipments & Developers of Reliable Ash Handling Systems in India and abroad since 1970.

KEY DELIVERABLES

As Engineer in GMR EMCO 2 * 300 MW Thermal Power Station .

Preparing the QAP, FQP, Method statements, reports and collecting the data, drawings, regarding the site execution works.

Preparing the work orders of the contractors and plan the proper mobilization of the contractors at the Site.

Preparation of Planning Schedules for the fabrication and erection.

Attending the meetings with the GMR Officials regarding site works.

Preparing the list of drawings released and drawings for approval .

JAN 10 – DEC 10 : ENERGO ENGINEERING PROJECTS LIMITED AT NEYVELI LIGNITE 2X125 MW THERMAL POWER PLANT,BARSINGHSAR, BIKANER RAJASTHAN

ENGINEER

GROWTH CHART

JANUARY 2010- MAY 2010 : GRADUATE ENGINEER TRAINEE

JUNE 2010 - DEC 2010 : ENGINEER

ENERGO is a reputed ISO 9001:2008 multidisciplinary Engineering, Procurement & Construction (EPC) Company involved in Engineering & supply of systems & equipments for power plants. (Bulk Material Handling, Ash Handling, Valves & Boiler Performance Testing, Coal Handling Plant).

KEY DELIVERABLES

As a GET and Engineer at Neyveli, Barsinghsar 2 * 125 MW Thermal Power Station .

Erection and commissioning of Coal Handling system (800 TPH, conveyor length 1.5 km), Dust Extraction System at crusher House and Dust Suppression System at Crusher House and all along the Conveyor ).

Erection of Lump Breaker (Jaypee Make) & Alignments of Double Roller Crusher, Apron feeder and Chain Scrapper (L&T Make) .

Preparation of protocols, documents related to the jobs.

Leading the team of Junior Engineer, Operators and technicians for proper running of the system.

Carrying out the preventive maintenance as per schedule.

Ensuring the quality and safety aspect at workstation.

Maintenance / Troubleshooting

Implementation of predictive & preventive maintenance schedules for various equipments to increase machine up time & equipment reliability.

Implementing maintenance schedules and carrying out periodic checks to ensure performance of various equipments and maintaining requisite documents for the same.

Identifying areas of bottlenecks / breakdowns and taking steps to rectify the equipments through application of troubleshooting tools like root cause analysis.

PERSONAL DOSSIER

Date of Birth : 17th August 1987.

Current address : C - 12/3 JPL Colony, Jhajjar Power Limited, Jhajjar - 124142, Haryana

Permanent Address : S/O Dayanand Singh, Behind Universal Vision Cable Network, Gurudwara Colony, N.T.S Barkakana, Distt. : - Ramgarh, Jharkhand -829103

Phone No. : +919*********. +919*********

Gender : Male

Material Status : Married

Nationality : Indian

PROFESSIONAL REFERENCES

MR. Vivek Masade (DGM - Mechanical) Mobile No. 089********

NOTICE PERIOD FOR JOINING : 3 MONTHS BUT NEGOTIABLE

I consider myself familiar with engineering aspects and confident of work in a team with my ability. I hereby declare that the information furnished above is true to the best of my knowledge.

I am submitting above biodata for your kind consideration and necessary action .Looking forward for your reply.

DATE : KUMAR GAURAV

PLACE :



Contact this candidate