Linda Govea Trevino ***************@*****.***. Fort Worth Texas 76116 . 817-***-**** cell phone.
Professional Summary
Responsible and hardworking warehouse. Assembler who can collaborate with a team and produce quality work on tight deadline. Assembler with 23 years of experience in plastic manufacturing and warehouse. Proficient in blueprints interpretation.
Skills
Expert in mechanical assembly
Strong algebra and general math skills
Small parts assembly
Experience in stacks
Pressure gauges installation
Fusing cutting and measuring tools experience
Quatifed in blueprint interpretation
Knowledge of metal parts and assembles
Stud application experience
Skilled multi -tasker
Extremely quick learner
Interpersonal skills
Assembly line production
Material handling expect
Work History
Pci Industries Inc
10/2013 to 12/2015
Inspected parts assembly parts together check fit and function measures parts and screw gun
Scanner 12/2010 to 09/2013
ATC Logistics and Electronic
13550 Independence Parkway
Scanner Bar codes
Lables boxes
Cell leader 09/1986 to 09/2009
DCM Manufacturing Inc
4409 Haltom Rd
Received and currently processed both written and instructions prints and work orders
Obtained appropriate tooling and fixtures
Inspected and tested component assemble and power tools
Disassembled,reassembled and corrected changover
Repainted and precisely touched up components and assembles
Built containers and pack parts in accordance with detailed packing specifications
Verified part numbers and placed parts in appropriate shipping containers
Maintained count and lift, shift and stocks material and parts
Wired machine and packages
Competently installed foam insulation on tubing and controls
Assembled frames, separators tanks, components to enginesin assigned area per BOM or WO
Aligned motor,air end and coupling using calipers, dial indication and straight edges.
Tested electrical controlsand components on the line.
Executed the entire assembly process by accuracy interpreting set- up sheets, work orders . drawing or blueprint
Planned and paced work effectively in order to meet daily, weekly, project or production goals.
Observed all safety policies and procedures.
Set up and tested monitorsand calculators and recorded test date per engineering and quality specifications
Closely inspected parts to ensure they were clean and free of contaminants
Sealed and wired valves and created and attach nameplates.
Correctly and safety used a variety of hand tools, saws and cutting equipment to carry out job duties.
Education
High school Diploma 1982
Arlington Heights High School 76108 Tx