Post Job Free

Resume

Sign in

Civil

Location:
New Delhi, DL, 110001, India
Posted:
February 15, 2016

Contact this candidate

Resume:

RESUME

NAME :- RAMNARAYAN NAGLE

Fathers Name :- KISHORILAL NAGLE

Date of Birth :- 05/06/1976

Permanent Address:- At. Post – Sillewara, Ward No. 2,Qtr No LCH-284, Chandni Chowk, WCL Colony, Sillewara. Tah. Saoner, Dist: Nagpur Pin 441109 (MH)

Contact No. :- Mob. 959-***-****, 770-***-****

Gender :- Male

Nationality :- Indian

Religion :- Hindu

Marital Status :- Married

Language Known :- Hindi, Marathi & English

Educational Qualification:

Exam passed

Year of passing

Board/university

Percentage

S.S.C

1992-1993

Bhopal

59.00%

H.S.S.C

1994-1995

Bhopal

48.78%

Diploma in Business Management

1996 -1997

All India Counseling for Management Studies

58.73%

Technical Qualification: 1) Computer course & Hardware and Networking Server 2008

2) Tally, MS Office

Working Experience:

September 2004 to June 2011:- Working as site supervisor at B.C. BIYANI Project Pvt. Ltd at Koradi Site in Nagpur, Civil construction work for earthwork Ash band, road calvert TT reserve wires project.

July 2011 to January 2012:- Working as project supervisore at KCC GM (JV) (A well known infrastructure company handling various projects of Reliance Infrastructure at its Thermal Power Project located at Butibori MIDC, Nagpur)

Assignment Awarded:- Construction of Ash pound construction of stacker reclaimer and coal stacker platform, construction of drain water reservoir, construction of pipe neack foundation emergency coal stacker. Responsiable for site management and execuation of project, procurement of required materials at site. Maintaining material, cement and steel consumption report. Maintaining the quality of work at site. Completing all paper work and billing work and documentation; RCC work specification supervision of site with wide responsibilities and interaction with the architect and contractors. I have done with the work consumption more than 40,000 cum concrete in ash pond within time period also in stacker reclaimer the steel work more than 500 tons and 4000 cum concrete work has been completed under my supervisory.

February 2012 to November 2012 :- A growing TMC Contractors Private Ltd. company handling different kind of construction project in Warora Civil construction work for L&T substations work like Drain, Cable Trains, footing & coloumns. A well known infrastructure company handling various projects of Reliance Infrastructure at its Thermal Power Project located at Butibori MIDC, Nagpur. Construction of CHP water tank & Pump house, CHP coal handling plant within the time period. The steel work more than 20 tonnes and 1000 cubic meter concrete has been completed under my supervisory

December 2012 to June 2013- A growing Swami construction company handling different kind of construction project in Nagpur and residing Rural areas. Worked from supervisor

Exclusive experience construction and supervision of structural and road work, Handling client and preparing material requirements and other site level activities, reporting to the project manager. Reconciliation of material and comparison with client billings. Construction and supervision of Bituminous work like BBM WBM.

July 2013 to Till Date :- A growing R.K.Engineering company handling different kind of construction project in Nagpur and residing Rural areas. Worked from supervisor

Exclusive experience construction and supervision of structural and RCC. road work,Flats scheme ( Nisarg residency )& Substation 440kv 132kv 33kv 11kv (Cable trench building work transformer foundation and other foundation CT PT LA ISOLATER GANTRY BREAKAR ect.)

Take a daily work schedule from the site engineer and with the sub contarctors/ direct laboour employed shall get the work done. Ensure that all workers working in his area follows safe work practices. Get the levels/line/layouts/ball marks etc. checked by the site engineer and the QA/QC engineer and works is done to the quality standards.

Well versed with all the drawings for the work being take up in his area shall discuss with the site engineer/ immediate superior an obtain the complete details of the drawings, details and specification to the followed for the work. Ensure good housekeeping in his area and minimum weight maintain proper dsicipiline and punctuality at site. And best co ordinate with sub contractors for achieving production targets.

I hereby affirm that the information, furnished above is true and correct by my best of knowledge.

Place:-

Date:-

(Ramnarayan Nagle)



Contact this candidate