Rupesh Kumar Tripathi
Mob.No.– 903-***-****,731-***-****
****-****************@*****.***
Objective:
To become an asset to the Organization by providing efficient services and become an integral part of the organization by contributing in its growth through hard work and dedication.
Industrial Profile
Ashoka Buildcon Ltd., Bihar as a Sr. Engineer from Nov-15 to Till Date. In RGGVY Projects.
Monte Carlo Construction Limited, Ahmadabad as an Engineer- from Nov.2012 to June.15. In RAPDRP Projects.
A2Z Group as a Project Engineer from Nov2009 to March2012. In ECM, FSP Projects.
Betul oils & Flores Ltd. Satna (M.P.) as a Trainee engineer from Oct- 2007 to Nov2009 in Solvent Plant Maintenance.
Academic Profile
B.E. (Electrical), june2007, Rajiv Gandhi ProudyogikiVishwavidyalaya, Bhopal, First Division.
Higher Secondary Education (12th standard), March 2003, Board of Secondary Education, Bhopal
Secondary Education (10th standard), March 2001, SaraswatiVidyapeethSatna, Board of Secondary Education, Bhopal.
Projects
Client
Objective
Role & Responsibility
ECM-D12 under ADB Scheme
MPPKVVCL, Satna (M.P.)
Feeder wise AT&C loss reduction
Co ordination with Utility & office working.
GPS Survey of 11kVand LT network of 12 feeders.
Preparation of 11kV feeder maps
Executed the survey job consumer indexing of More than 37000 consumers in City Division.
Feeder wise as well as DTR wise Loss & RPU report preparation.
Replacement of Conductor by AB Cable, shift energy meter in call bell Location.
Handling a ROW problem in Site.
Feeder Separation-I
MPPKVVCL, Rewa (M.P.)
Designing a Separate feeder for AGL & DL Consumers
Erection work,Co ordination with Utility & Contactors.
Monitoring a GPS Survey of 11kV and LT network of 51 feeders.
Monitoring All Erection Activity
R-APDRP Part-B
MPMKVVCL, Bhopal (M.P.)
Reduce feeder loss 9%..
Co ordination with Client.
11kv line,DTR,LT erection work.
AT&C Losses Analysis Feeder wise as well as DTR wise
RGGVY 12th Plan
NBPDCL,
Bettiah,Bihar
Village Electrification Work
Project Planning
Execution Work, Quality Control
Sub-Contractor & Client Billing
Material Management.
Professional Experience
System study of Electrical network on simulation software like Neplan
ECM work along with survey, drawings and BOQ for the EPC project.
Substation Survey & upgrade Network for SCADA work, estimates prepare more than 140 S/stn.
Converting 3ph LT line to Single phase HT Line & 3ph LT to 3ph HT HVDS System.
Work Planning, co-ordination with Client, contractors and consumers.
33 & 11 kV line designs a RMU & Auto Recloser Location.
Having strong correspondence and coordination with client, project team, consultants, production and regulatory agencies for safe and smooth execution of the project deliverables within specified cost, time and quality constraints.
Managing Survey of HT as well as LT Lines in Urban as well as Rural areas.
Handling GPS Survey of Electrical network (11kV Feeder-wise, LT Network) in ECM, Feeder separation projects & Consumer Indexing.
Feeder wise Loss Analysis & Maintain a RMS Report.
Erection Work in ECM & FSP Project.
Additional Qualification
Two Year Computer Literacy & Awareness Program, Madhya Pradesh BHOJ (OPEN) University, Bhopal.
Successfully attended 3 Months Advance Training Program in ELECTRICAL DESIGN AND DETAILED
Computer Technical Literacy
Simulation Software -Cymdisc,Neplan
AutoCAD Engineering Design Software Ver.2007.
Training
During Graduation
Vocational Training in BHILAI STEEL PLANT [C.G.]
Industrial Training in BHEL [M.P.]
Computer Skills
Network Analysis (Simulation) Software-Neplan
GIS Software
Packages-MS-Office.
Personal Profile
Father’s Name: Mr. R.P.Tripathi
Mother’s Name: Mrs. Asha Devi Tripathi
Date of Birth: 26 February 1986
Marital Status: Married
PassPort No.-L5153155
Permanentaddress
Adarshnagar, Ghoordang
Near high school satna (M.P.) 485005