AADITHYA PREM KUMAR KURRAMBOYINA
**** ******* ******, ***#***, Arlington, TX, 76010 Phone # 682-***-****, Email: ********.************@*****.*** SUMMARY: -
• M.E. from UT Arlington, Texas with graduation project on Comparison of inspection methods in pressure pipes and gravity pipes.
• 2 years of professional experience as an engineer. Extensive technical knowledge and experience in construction field and pipelines.
• E.I.T certification (FE CIVIL ENGINEERING).
• Graduate Aptitude Test in Engineering (GATE) in civil engineering got an rank of 3027 (01/2013,India)
• Field experience and sound educational background within the construction engineering and management disciplines.
• Dedicated, persevering worker committed to improving company’s productivity and profitability goals. EDUCATION: -
Masters in Civil Engineering, Jan’14-Dec’15, The University of Texas at Arlington GPA: 3.3/4.00 Bachelors in Civil Engineering, Aug’08-Apr’12, Jawaharlal Nehru Technological University, India GPA: 3.5/4.00 PROFESSIONAL EXPERIENCE: -
Graduate Research Assistant at Civil Engineering, The University of Texas at Arlington, Texas September 2014-May 2015 Research-Project: Pipeline Inspection Project
Objective: Inspecting pipelines to collect data regarding structural stability and visible failures in pipelines.
• Study includes CCTV inspection along with sonar technology.
• Failures along the pipe which are above water line is detected by CCTV inspection.
• Structural stability and failures under water lines are detected by sonar technology instrument.
• Suitable Trenchless Renewal Method (TRM) or Trenchless Construction Method (TCM) is recommended, based on analyzed data obtained after inspection.
• Finally, Cured-in-place pipe renewal method is recommended. Research-Project: NU FLOW AMERICA, INC. Sanitary pipeline inspection Objective: Inspection is conducted at Fox Ave, Lewisville, TX
• Appointed for collecting failure data in pipelines.
• Different types of problems must be noted by looking through the inspected videos.
• Problems are classified like: Longitudinal cracks, circumferential cracks, presence of debris, roots of trees penetrating through pipe, infiltration, exfiltration and other structural problems.
• Problems are noted in excel file indicating were problem is exactly located in the pipe.
• Finally, data is used to concluding which trenchless method is suitable for controlling failure. Research-Project: Sanitary Pipeline and vent pipeline inspection at platinum royal, Texas Objective: Inspecting pipelines by using cable mounted Closed Circuit Television method.
• Making notes of problems in pipelines.
• Familiarizing with NSF international special engineered specification 13004 Rehabilitation for small diameter pipelines.
• ICC-ES LC1011-2010, Listing Criteria for Rehabilitation of Existing Building Drains and Building Sewers by the Inversion and Curing of Resin-impregnated Tube ASTM F1743-2008, Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled- in-Place of Cured-in-Place Thermosetting Resin Pipe (CIPP)
• Preparing report on failures of pipelines.
• Analyzing and recommending method of construction or renewal method. Engineer May 2012-September 2013
Company: Sri vigneshwara construction, India
Project: High raised residential buildings
Role: Planning Engineer
• Worked on Scheduling a project, Work breakdown structure/Relationship/constrains, Resource allocations
• Worked on Tracking project process, cost estimations, Resource levelling.
• Worked on Reports, Earned value analysis, customization, Multiple projects.
• Participated in preparing AUTO CADD for 2D drawings
• Provided data in respect of variation orders and site instructions.
• Involved in record drawings, technical reports, site diary.
• Involved in production of precision technical plans, drawings and models
• Liaised with the project planning engineer regarding construction programs.
• Assisted in terms of quantity, man power, surveying and budget of equipment. Engineering Trainee August 2011-April 2012
Company: Sri vigneshwara construction, India
• Familiarized with concrete block testing.
• Familiarized with concrete block testing.
• Compaction of embankment with rollers and familiarized with density of soil.
• Introduced to manual cost estimation.
TECHNICAL SKILLS:
Civil Softwares: AutoCAD, STAAD Pro 2006, Primavera P6, Sage Timberline, Micro CYCLONE, SpectraPave8 PRO, Revit Operating Systems: Windows 2000, XP, Vista, Windows 7, Windows 8. Software Tools: Microsoft Office 2010 (Word, Excel, PowerPoint, Project) Language: C
RELATED COURSEWORK:
1.Construction methods-Field Operations.
2.Infrastructure and planning.
3.Pipelines and trenchless technology.
4.Foundation Analysis and Design.
7.Construction Planning and Scheduling.
10.Construction cost estimation.
5.Geosynthetics.
8.Advanced steel design.
11.Construction
productivity.
6.Advanced operational research.
9.Construction contracts, specifications
and administration.
TEAM PROJECTS:
Graduate Level
• Foundation design for simple cycle energy center at maverick county, University of Texas at Arlington, Texas.
• Prepared and proposed the Cost Estimation for the ten stories building situated at 5500 Columbia pike Arlington, VA for metal works, using Timberline software and RS Means.
• Proposed and submitted a construction schedule for the ten stories building situated at 5500 Columbia pike Arlington, VA using Primavera P6.
• Analyzing construction contract and specifications dispute between Larsen E. Whipsnade, Fancy Pants, LLC and Henry Drumond, LP, with Max Price, LP.
• Formulating linear programming problem in advanced operational research using lingo software.
•
Clearing/Grubbing of the proposed land to construct a business park at, Heritage parkway, Mansfield, TX.
• Study on infrastructure and planning of AT&T (cowboy’s stadium) stadium.
• Analyzing and recommending trenchless technology method for given section (DM0101 to FM005) at, Western avenue, Fort Worth, TX.
• Pavement design with and without geotextile layers along with cost analysis.
• Analyzing impact and importance of productivity on a construction project using Micro CYCLONE. Undergraduate Level
• Minor project: Collection of traffic volumes based on using tally charts, velocity & time and data of origin and destination of each vehicle.
• Major project: Analyzing minor project data and proposing major district road. CONFERENCES
• Green building conference, SRM University, India.
• Basic drilling fluid workshop by Frank canon, Baroid Industrial Drilling products, University of Texas at Arlington, TX.
• Ground freezing by Bernd Braun, University of Texas at Arlington, TX. REFERENCES:-
• Dr. Mohammad Najafi, P.E., F. ASCE; Director, construction Management Program, UT Arlington, 817-***-****, ******@***.***