Post Job Free
Sign in

Maintenance And Production

Location:
UP, India
Posted:
January 29, 2016

Contact this candidate

Resume:

RESUME

Career Objective

I look forward to a dynamic career in an organization, which creates a benchmark in best practice & quality in the industry to which it belongs. The career should afford me an Opportunity to refine my capabilities and tap my versatility to the hilt, which proves to be Beneficial in the growth of the organization as a whole.

Personal Profile

A go-getter, result oriented person.

An effective communicator.

Confident and persuasive team-builder, able to motivate and communicate to achieve business performance.

Dependable and reliable in supporting and enabling team effort to produce genuine and sustainable development.

Professional Experience

Period

Company Name

Designation

Profile

Oct-14 to Sept-15

Hindustan Unilever Limited, Silvassa (HUL)

GAT

Trained in Production, Maintenance and Quality department

Oct 15 to Dec 15

Hindustan Unilever Limited, Silvassa (HUL)

On Production Project

On OEE (Overall Equipment efficiency) improvement Project of Powder Plant- Surf Excel / RIN

Hindustan Unilever limited is one of the world's leading providers of F.M.C.G. goods

Work Profile During GAT- Stint @ HUL Silvassa

Training on fully automatic manufacturing unit.

Production planning.

Planning of Preventive Maintenance and maintenance compliance.

Handling shift individually, in production department.

Analysis of breakdown by WHY-WHY Tool,W1H tool & 4M tool

Knowledge of OEE, TPM, SHE and optimizing these in production process.

Knowledge about PSM mixer, BOON mixer, Sigma Mixer, Vibro Seive Bucket elevator, Screw Conveyors, VFDs, Pneumatic Valves, Hassia Machine & Hydraulic Systems.

Work Profile During Project – Stint @ HUL-Silvassa

Training on fully automatic manufacturing unit.

Using why why analysis for increases batches in shift (60 batch to 82 batch)

Using why why analysis for increases packing production in shift by modification in packing system

Modification of conveyor to decrease breakdown and increase production

Using why why analysis Minimize the Planned Maintenance time

Education Background

Degree

Year of Passing

Board/University

Percentage

B.E.

(Electrical & electronics. Engg.)

2014

Anna University Chennai

57.8

12th

2009

UP board

74.89

10th

2007

UP board

72

Contribution in Production

Improving batch production by implement 14” mesh in Base Powder V/s

Improving packing production by improvement in Hassia Pouch Conveyor

Reduce the time response by the motivated to worker

Create competition in all shift by making record in one shift and again break it by another shift

Make highest production in batch and packing at the time when production requirement was high

Contribution in TPM

TPM (Total Productive maintenance) way of working.

Improving Circle by doing circle activities.

Maintaining JH and 5s of area

Planning and implementation of quality and OEE action plan

Contribution in Safety

Contribution in S.H.E. Pillar

Participated in hand in machine campaign.

Participated in organizing of safety week celebration.

Took part in mock drill conducted inside the plant for emergency preparedness.

Weekly reporting of leading indicators like hazards, S.B.O., Near miss.

Maintaining compliance of P.T.W. system for various project activities.

Computer Literacy

Operating systems like Windows 7, MS Office, MS Excel, MS PowerPoint Presentation etc.

Interests: Internet, Travelling and Outdoor Sports.

Hobbies: Playing Cricket,

Declaration

I hereby declare that the above information is true to the best of my known.

Date: Name

Place: Krishna Kant Singh



Contact this candidate