James Stalling
Functional Summary:
Machine tool and panel Electrician expertise in automation industry; PLC and controls wiring with working knowledge of latter logic and servo drives
Experience with Allen Bradley Relays, limit switches mode configurations.
Led a contractor team of 15 electricians.
Employment:
TEC Technical Group Inc., Comau Novi, Novi MI 6/2014 – 1/2016
Electrician (Currently on Call List)
Wired Panels.
Advance Staffing Inc. - Methods Machine Tool, Wixom MI 1/2012 – 5/2014
Electrician
Wired Panels.
Advance Staffing Livonia, MI 1/2009 – 1/2012
Electrician (Various Assignments)
Built CNC parts for auto industries
Calibrated parts using calipers and micrometers and other measuring devices. Worked on CNC machines setting limit switches. Position proximity switches. HMI interfaces. Pipe bending. Set schedules for Servos. Among other Machine Tool Building task, Panel/Field Wiring. Worked with Siemens, ABB, Fanuc, Kawasaki and Natchi interface robot panels
Assignments include: Comau Auto, SAIC, Comau - Novi Industries, Nagel Precision, Evana, HGS, Wahler Automotive, KJL, American Controls, Lucent, Techmatic, System Controls, Entela, Phasor Electric, Motion Controls, Zantron, JL Becker, Creative Automation and Motorama
Hydro Logic, Warren MI 6/2008 - 1/2009
Electrician
Wired PLC panels, positioned and wired proximity switches, debugged and troubleshoot, wired HMIs, wired I/O racks. Worked with Siemens, ABB, Fanuc, Kawasaki and Natchi interface robot panels. Pipe bending, panel layout, also read blueprints. Worked on distribution panels, 480v, 220v, 110v. Wired circuit breakers weld timers and fuse busses. Worked with Allen Bradley Relays, limit switches mode configurations.
3/2008 - 5/2008 - Seeking Employment
Techmatic Inc., Wixom MI 3/2006 - 2/2008
Electrician
Worked with Triad valves, set perimeters for open and close variations wired, debugged and troubleshoot valves for various applications, also went on location and installed valves for customers. Work according to blueprints.
Quantum Controls 3/2004 - 3/2006
Lead Field Service Technician
Installed PLC panels and ran Ethernet communication control systems.
Led a contractor team of 15 electricians.
Wired panels and integrated, PLC proximity switches and controls.
Stegner East, Madison, Heights, MI 1999 – 2004
Electrician
Wired panels and integrated, PLC proximity switches and controls.
Commerce Controls, Farmington MI 1997 – 1999
Electrician
Wired panels and integrated, PLC proximity switches and controls.
Novi Industries, Novi MI (Pico) 1994 – 1997
Panel Wireman
Wired panels and performed quality control activities.
Medar Inc. Farmington, MI 1992 – 1994
Electrical Helper
Built, wired and tested weld timers for automated weld lines.
Education:
Cooley High School, Detroit MI; 9/25/1982 thru 6/12/1986
Henry Ford Community College, Dearborn MI; 9/5/1994 thru 6/25/1996
DeVry University, Southfield MI, presently pursuing
Electrical Engineering
Languages:
English, German