Dear Sir,

Sub : Application for the post “Instrument Engineer”

Ref :

It is my pleasure to introduce myself that I am Diploma Engineer in Electrical and Instrumentation from Karnataka board examination Bangalore – India, having an experience of + 19 Years (Onshore & Offshore).

Through this letter, I would like to highlight and elaborate on my personal qualities, educational details and job experiences. I am currently looking for a challenging position in the field of Engineering for Oil & Gas Industries to enhance my career.

I am a motivated and self managed person with effective time management skills to deliver the assigned tasks within stipulated timeframes and quality guidelines. I believe in taking initiative and being proactive for my team. I am a person always willing to learn, flexible and always successful in working with a team.

I am herewith sending my resume for the post “Instrument Engineer” in your esteemed organization.

I hope, I have exemplified and justified myself as the right candidate for the mentioned post and looking forward a favorable reply from you.

Thanking you

Yours truly

Mohammad Salahuddin Khan

INDIA

Mobile No. +919*********

Resume

Mohammad Salahuddin khan

Mobile No. +919*********

Email: act7r1@r.postjobfree.com

PERSONAL DETAIL

Nationality : Indian

Date of Birth : 05-10-1976

Experience : 19 Years (Onshore, Shutdown & offshore) Marital Status : Married

Present Location : India

EXECUTIVE SUMMARY

Basically, I am an Electrical and Instrumentation Engineer from Karnataka with +19 years of experience in Petrochemical, Oil, Gas Refineries, Well head Platform modules & Skids in fabrication yard. I have very good knowledge and hands on experience in Engineering, Installation, Inspection, Erection and commissioning of Process control Instrument including DCS, PLC,RTU, SCADA, ECS, FACP and IPCS.

Qualification: Diploma Engineering in Electrical and Instrumentation

Computer Skills : MS Office, MS Project.

Training : DCS - Emerson Rosemount DeltaV.

SCADA - Wonderware Intuche.

PLC - Allen Bradley, Siemens.

Survival At Sea, Basic Fire Fighting, Safety At Rigs/Platform, Elementry First Aid held from Marine United Acadamy Navi Mumbai, India.

PTW Permit receiver from Qatar Gas, PTW Permit receiver from KNPC Kuwait.

Safety Induction/H2S Training for new contruction work in runing plant completed from QG, Shell, KNPC,GASCO, TAKREER, Al Hosn Gas, SPGC, L&T and RIL.

PROFICIENCY:

I have worked with DCS Honeywell Exprion PKS, TDC 3000, Yokogawa CENTUM VP, Centum CS 3000, Emerson Rosemount DeltaV, Foxboro I/A System, PLC Allen-Bradley, Yakogawa Pro safe – RS safety, Siemens, Try conics, Honeywell FSC and Bentley Nevada 3500.

Familiar with OPERCOM methodology and doing witness for SAT/SIT, Monitoring Pre- comm., Commissioning and Start up activity, I am responsible for verify loop folder attached documents and witness loop test, Functional Check activity.

Proficient in Rotating Equipment Bentley Nevada 3500 Vibration control system, Boiler management and control system, Compressor control system Surge, anti surge control System, Lube oil control system, Pump control System, Fractionators/Distillation Column control system, Separator control System, RTU System ESD/FSD System, PACKSCAN MOV control system, Metering System, Tele-communication systems, Security system (CCTV, Access point), Safety Fire & Gas Alarm system.

Proficient for Instrument installation, Calibration, Testing and Troubleshooting of all types field measuring and control devices as PT, FT, LT, TT, Switches (Flow, Level, Pressure) indicator, Thermocouple, RTD Valve (PCV, FCV, ESDV, PSV,PG. I/P convertor, Perform troubleshoot, all types of process control instrument and logic.

Perform calibration and maintenance of all safety fire and gas equipment such as gas monitor H2S/HC monitor, smoke detector and heat detector, various types of rotating equipment Monitoring and Control System, like Vibration probe Axial, Radial and keyphare(Bentley Nevada).

Familiar standards for electrical power and control systems ( NFPA 70 NEC, NEMA,IEC, BS, API) and many company standards such as KNPC,SPGC,SHELL, QG, KNPC, HMEL, methods (ISO 9001:2008).

EMPLOYMENT DETAILS-EXPERIENCE SUMMARY [20MAY-1997-TILL DATE]

Employments :

1. Employee : Intertek Global Ltd. UAE (UK based Company).

Duration : from 18th June 2012 to 30th June 2015

Project : Inter refineries pipeline Main Project (IRP-II). TAKREER/ADNOC ABU DHABI

Designation : Instrument Pre-Comm. & Commissioning Engineer TPI/PMC

Duration : From 05th Feb 2014 to 30th June 2015

PROJECT HANDLE

Inter Refineries pipeline & Terminal Storage tank project (Ruwais, Madinat Zayed and Musaffa).

Project : Shah Gas Development package 1 (Al Hosn Gas) IN ABU DHABI

Designation : Instrument Commissioning Inspector/Engineer TPI/PMC (client representative)

Duration : From 05th Sep. 2013 to 4th Feb. 2014.

PROJECT HANDLE

Well head/Gas Gathering and Over Head Transmission line Project Al Hons Gas Shah Field.

Project : NGL - 4 GASCO Ruwais.

Designation : E&I Inspector Construction, commissioning & shutdown- TPI/PMC

Duration : From 18th June 2012 to 4th sep. 2013

PROJECT HANDLE:

Train/Storage Tanks 4th NGL project GASCO Ruwais.

My main activities in this three projects include doing Engineering,Construction, Inspection, Commissioning, Coordination with EPC contractor Engineer/Supervisors/Inspector/Vender, attending System walk down for RFP, RPC, Make sure punch lists are generated, categorized and cleared. Review MC Dossier, loop folder and other documents, witness for loop check, functional test, Monitoring Construction, Commissioning and supporting to start up activity.

PROJECT HANDLE:

Ruwais to Musaffah Pipe line project TAKREER, Train/Storage Tanks 4th NGL project GASCO Ruwais.

JOB RESPONSIBILITIES:

Responsible for reviewing construction drawings such as Instrument location drawing, P&I diagrams, hook-up, connection, typical installation details, Termination details, Cable schedule, Cable trench layout drawing, Airline details, Earthing detail, Main Cable Layout, loop diagram, logic diagram, narrative, Cause & effect diagram etc. Responsible for the review of vendor drawings and data sheets.

Review the construction sequence/logic, work plan/procedure, pre-task planning and method statement to ensure comprenhensive feasibility and safety.

Identification and review of Client Engineering standards, other International standards and statutory requirment required for the project and to ensure the design is carrired out in accordance with project requirments.

Review all Instrument NCR/SOR and review all Instrument punch list items.

Preparing Side Observation report for all kinds Instrument activities at site.

I am responsible to contractors’ RFI and TQS maintain timely in order to progress work.

Testing and Calibration and maintenance of all types field measuring and control devices as PT, FT, LT, TT, I/P Converter, Gauges, Switches (Flow, Level, Pressure &Temperature), Controller, indicator, Thermocouple, RTD Valve (PCV, FCV, ESDV, PSV}.

Various types of rotating equipment Monitoring and Control System, like Vibration, Temperature, Displacement and Speed (Bentley Nevada).

Loop checking, Logic testing for emergency shutdown system, maintenance of transmitter, Limit Flow, level, pressure, temperature, switches, control valves Fisher, Masonilan type) and controller alignment and calibration of both Electronic and pneumatic.

Calibration and functionality checking for all trip settings

Functionality checks for the fire and gas system,

Functionality checking for all interlocking systems,

ESD systems on checked as per cause & Effect Dwgs.

Monitoring Pre Com & commissioning activities at site. Maintained daily records of progress report, and reported to the Commissioning manager.

I force to contractor the proper application of PTWs, LOTO and other supporting certificate during all site walk down, testing and commissioning activities.

Monitoring Construction & commissioning activities at site. Prepare daily & weekly progress report reported to lead engineer.

Liaison with contractor, home office Engineering and client representatives.

Monitoring the site HSE activities.

2. Company : QATAR SHELL PEARL GTL LTD.

Project : JK Pearl GTL Project, Raslaffan Qatar.

Employee : KBR International (Supply from Sepam Middle East Qatar}

Designation : Instrument Supervisor-PMC

Duration : From 6th June. 2009 to 30 Sep. 2011.

My main activities include doing Engineering, Construction & Commissioning, Interacting with vendors, System walk down of RFC, RFSU, Witness for SAT/SIT activity, Punch clearing, witness of loop test, dry function test, wait function test Supervise Construction, commissioning and Star up activity.

PROJECT HANDLED

Liquid Processing Unit, Effluent Treatment (RO and Ultra Filtration) Plant.

JOB RESPONSIBILITIES:

Responsible for reviewing construction drawings such as instrument location drawing, P&I diagrams, hook-up, connection, typical installation details, loop diagram, logic diagram, narrative, Cause & effect diagram etc. Responsible for the review of vendor drawings and data sheets.

Review and approval of EPC contractors Instrument list, cable schedule and document for the execution in coordination with asset owner.

Identification and review of Client Engineering standards, other International standards and statutory requirment required for the project and to ensure the design is carrired out in accordance with project requirments.

Acting as a client Engineer during construction and commission phase as part of PMC interface and supervision team. Provide company representation in monitering and coordinating the site activities of EPC contractor and its sub- contractors and ensure construction work carried out in accordanace with Shell Pearl GTL rules, regulaions, standerds and permit to work procedures.

Instrument installation in according with construction drawing and project specification, specified international code and standard.

Supervision and witness of all instrument installations, calibration, Loop test, functional test of sequence.

Monitor Pre-Commissioning and Commissioning activities and ensure their right delivery in accordance to the agreed standards

Calibration and functionality checking for all trip settings

Functionality checks for the fire and gas system,

Functionality checking the control loops, the controller action.

Checking all the ESD loops & sequence logic by simulating the process.

ESD systems on checked as per cause & Effect Dwgs.

Prepare NCR(None-compliance report) and TAA(Technical asurance alart report)

Monitoring the site HSE activities.

3. Company Name : Chiyoda and Technip Joint Venture EPC Company

Project : QCS Gas Development Phases 3&4 Projects,

Raslaffan QATAR.

Employee : CTJV (Supply from Sepam Middle East Qatar}

Designation : Instrument Supervisor

Duration : From 12th Aug 2008 to 5th June 2009.

My main activities include, doing Engineering, Construction, Commissioning and interacting with vendors, preparing MC Dossier, drawings/documents.

PROJECT HANDLED

Inlet gas facilities, Effluent Treatment Plant.

JOB RESPONSIBILITIES:

Review of the basic engineering requirement including conceptual/feasibility report, scope of work etc.

Identification and review of Client Engineering standards, other International standards and statutory requirment required for the project and to ensure the design is carrired out in accordance with project requirments.

Performing instrument equipment installation, construction and commissioning in according with construction drawing and project specification, specified international code.

Supervision and Inspection of all Instrument installations, calibration, Loop test, functional test of sequence and Commissioning activity.

Preparation of QCF test reports according with ITP for various activities, loop folder preparation for daily loop checking.

Checking all the ESD loops & sequence logic by simulating the process.

ESD systems on checked as per cause & Effect Dwgs.

Prepared Punch list and according to Punch List all pending work will be finish.

Establishing field inspection and testing procedures and monitor the quality control activities on construction site in line with the establishment quality control program.

Supervising of Construction, Commissioning Activities at site. Maintained daily records of progress report, and reported to team Lead Engineer.

Monitoring the site HSE activities.

4. Company Name : GS Engineering & Construction EPC Company

Project : South Pars Gas Development Phases 9-10 Projects,

Assaluyeh, IRAN.

Designation : Instrument Supervisor (commissioning & maintenance)

Duration : From 20th June 2008 to 28th March 2009.

My main activities include, doing Engineering, Pre –Commissioning, Commissioning and maintenance, interacting with vendors, preparing drawings / documents.

PROJECT HANDLED

Inlet gas facilities, Effluent Treatment plant, Knockout Drum

JOB RESPONSIBILITIES:

Reviewing all diagrams and document related to commissioning and maintenance.

Identification and review of Client Engineering standards, other International standards and statutory requirment required for the project and to ensure the design is carrired out in accordance with project requirments.

Testing, Calibration and making records.

All type transmitters installation, Calibration and calibration of safety valves, control valves, shut down valves, deluge valves, ON/OFF valves, Cable laying & testing, glanding, termination, pressure testing of impulse line, Air line installation & testing and making records.

Loop checking functional check and making records.

All instrument loops connected with DCS & PLC checked as per TSLD (Trouble shooting loop Dwg) including alarm, Trip set point & control valve action with actual simulating from field to system.

For checking the control loops, the controller action, responses are checked.

Checking all the ESD loops & sequence logic by simulating the process.

ESD systems on checked as per cause & Effect Dwgs.

Supervising pre-com and commissioning activity at site.

Maintained daily records of progress report and reported to the Commissioning manager.

Executed commissioning and maintenance activities.

Co-ordination between subcontractor, vendors and client for execution of project.

Identification and review of safty, maintanace and environmental requirements.

Maintenance activities and responsibilities

Day to day maintenance activities

Preventive maintenance jobs / Break down jobs / Shut down Jobs

Implementing modifications in Instrumentation as per requirements

5. Company Name: Integral Services Company W.L.L. Engineering & Construction Division

Kuwait.

Designation : Instrument Supervisor (const., commissioning and shutdown)

Duration : From 3rd January 2006 to 26th March 2008. .

PROJECT HANDLED:

Implementation of Hazop Study project (EPC) of M/S. KNPC

Implementation of Hazop Study project is KNPC in FCC, HCR and ARD UNITS at MAA Refinery.

JOB RESPONSIBILITIES:

Preparation of engineering documents like Instrument index list, Input / Output list, Instruments Specification sheets, Cable Laying and Termination.

Receipt / Inspection / Storage of Instruments

Installation & Calibration of all Field instruments.

Making cable schedule, interconnection diagrams, JB schedule, instrument index etc. Loop checking functional check and making records.

Installation, Modification, Testing, Loop checking, Trouble shooting,

Continuity check and Signal check.

For checking the control loops, the controller action, responses are checked.

Checking all the ESD loops & sequence logic by simulating the process.

ESD systems on checked as per cause & Effect Dwgs.

Testing and Calibration and maintenance of all types field measuring and control devices as PT, FT, LT, TT, I/P Converter, Gauges, Switches (Flow, Level, Pressure &Temperature), Controller, indicator, Recorder, Thermocouple, RTD Valve (PCV, FCV, ESD, PSV, I/P convertor.

Loop checking, Logic testing for emergency shutdown system, maintenance of transmitter proximity, Flow, level, pressure, temperature, switches, control valves Fisher, Masonilan type) and controller alignment and calibration of both Electronic and pneumatic.

Instrumentation Cabling, Meggering, Glanding, Termination, Heat shrinking, Tubing, Testing.

Implementing modifications in Instrumentation as per requirements

Preparation of manpower / equipment mobilization plans, allocation of materials, consumables and other resources.

Trouble shooting, diagnosis and rectification of faults.

Vendor development, Technical discussions with vendors and doing follow-ups.

Trouble shooting of Instruments, Doing Loop checking and carrying out periodic maintenances.

Preventive maintenance jobs / Break down jobs / Shut down Jobs.

6. Company Name : ALVI Tech Services project executed by Larsen & Toubro Ltd. (EPC)

Oil & Gas and Special Project Division

Mumbai, India.

Designation : Instrument Cons. & Commissioning Supervisor

Duration : From 13th April 2001 to 10th Dec. 2005.

PROJECT HANDLED ( Fabrication yard and Offshore field)

9Well Offshore Platform Project (EPC) of M/s. ONGC

9 Well Platform Project is ONGC’s Well Head Platforms ZB, RS11,RS1, RS2, RS3, RS4, RS5,RS7, RS8, at Mumbai High South field located about 160 km from west cost of India.

JOB RESPONSIBILITIES:

●Responsible for reviewing such as instrument location drawing, P&I diagrams, hook-up, connection, loop diagram, logic diagram, narrative, Cause & effect diagram etc. Responsible for the review of vendor drawings and data sheets.

●Supervision of Testing & Calibration of instruments

●Erection of panels and all types instruments

●Supervise Construction, Pre commissioning and commissioning activities

●Doing Erection, Installations as per drawings and standards.

●All the instrument loops connected with DCS & PLC checked as per TSLD (Trouble shouting loop Dwg) including alarm, Trip set point & control valve action with actual simulating from field to system.

●Checking all the ESD loops & sequence logic by simulating the process.

●ESD systems on checked as per cause & Effect Dwgs.

●Co-ordination between vendors and client for execution of project.

●Monitoring the site HSE activities.

7. Company Name : Syscon Engineers Pvt. Ltd

Delhi, India.

Designation : Instrument Supervisor

Duration : From 20th May 1997 to 10th Jan. 2001.

PROJECT HANDLED:

REVAMP Project in MEG1, MEG2 RILAINCE HAZIRA Gujarat-India.

JOB RESPONSIBILITIES:

Testing and Calibration and maintenance of all types field measuring and control devices as PT, FT, LT, TT, I/P Converter, Gauges, Switches (Flow, Level, Pressure &Temperature), Controller, indicator, Recorder, Thermocouple, RTD Valve (PCV, FCV, ESDV, PSV,PG I/P convertor.

Perform troubleshoot, repair, calibrate and test various types of process control instrument and rely logic.

Perform regular calibration and maintenance of all safety fire and gas equipment such as gas monitor, H2S monitor, smoke detector and heat detector.

Various types of rotating equipment Monitoring and Control System, like Vibration, Temperature, Displacement and Speed (Bentley Nevada).

Loop checking, Logic testing for emergency shutdown system, maintenance of transmitter, proximity, Limit Flow, level, pressure, temperature, switches, control valves Fisher, Masonilan type) and controller alignment and calibration of both Electronic and pneumatic.

Loop checking. Pre-commissioning Commissioning is well Conversant with

P&ID, Instrument Hook up drawing, Loop drawing, Isometrics and Logic drawing

Loop checking, Dry function test and commissioning activities

Instrumentation Cabling, Meggering, Glanding, Termination, Heat shrinking, Tubing, Testing.

Installation, Modification, Testing, Loop checking, Trouble shooting,

Continuity check and Signal check.

I can also responsible for pre- Commissioning and Commissioning, sequenced checking, cable Glanding, Tray works, Tubing and Impulse line, Electrical & Instrument cable laying & Termination.

Worked In Simulations of All Trip Systems (Inter Locks of Compressor, Pumps, and Heaters Etc.)

Day to day maintenance activities

Preventive maintenance jobs / Break down jobs / Shut down Jobs

Monitoring the site HSE activities.

Personal Information

Language Known: English, Hindi, Urdu, Arabic.

Nationality: Indian

Name: Deepak Stephen

Project: IRP-II Main Project TAKREER/ADNOC

Position: Plant manager FOD Madinat Zayed

Contact Number: +971*********

Email: act7r1@r.postjobfree.com

Name: Anurag Mulhotra

Project: JK Pearl GTL Project Ras lafan Qatar

Position: Project manager (PMC)

Contact Number: +656*******

Email: act7r1@r.postjobfree.com

Md. Salahuddin khan