Post Job Free

Resume

Sign in

Drilling Optimisation and Monitoring Specialist

Location:
Petaling Jaya, Selangor, Malaysia
Posted:
April 04, 2016

Contact this candidate

Resume:

Rasyidi Bin Abdul Rahman

d/a Rosnah binti Jumai,

CIMB Bank,

Industrial Lot 10A & 11A,

Jln Bank Bumiputera,

P.O.Box 114

***** ********,

Sabah

MALAYSIA

Phone: +608*-****** (Home), +601*-******* (Mobile)

E-mail: act77c@r.postjobfree.com, act77c@r.postjobfree.com

Personal Data

Date of Birth: 02 September 1972

Place of Birth: Kuala Lumpur, Malaysia

Gender: Male

Nationality: Malaysian

Marital Status: Married

Objective: To work and to contribute my full commitment with an excellent, high reputation and successful company.

Education

1993 - 1997 Universiti Kebangsaan Malaysia, Bangi, Selangor, Malaysia Bachelor of Science with Honors (BSc Hons)

• Major in Earth Science / Geology

Work Experiences

Jul 2006 – Mar 2016

Halliburton Energy Services Sdn. Bhd. Kuala Lumpur, Malaysia Consulting for RTOC / Shell WellVantage and DOMC (Petronas Carigali Sdn Bhd) as Drilling Optimization & Monitoring Specialist

• Provided drilling optimization and monitoring support via real-time data transmission / reception to client’s office.

• Remotely monitor and analyse drilling information at the Real-Time Operation Centre (RTOC).

• Worked with Drilling Engineers in support for actual drilling parameters and performance to the optimization roadmap developed for the RTOC.

• Worked closely with rigs’ key personnel (especially DSV and Drill Supt) regarding any unusual or abnormal event in the operations, and work as a team with the Drilling Engineer and ADT Engineer, prior to resolve unexpected issue/s, to avoid bigger problems in operations and to optimize the drilling operations.

• Partially worked back-to-back as / together with Drilling Performance / Analytic Engineer, and analyse the performance of the drilling and/or tripping operations.

• Proactively taken lead with hole-cleaning recommendation and vibration mitigation, by providing timely intervention and accurate suggestion.

• Involved in Exploration and Development Wells.

• Experienced in many kinds of well profile such as Vertical Well, Deviated Wells, Multi- lateral Well and Horizontal Wells.

• Some of Recent Well Experiences:

Well Name Location Operator

Jagus East-2 Brunei Brunei Shell Petroleum Co.

Auriga West-1 Australia Shell Australia Pty Ltd (SDA) Prelude Field: Prelude P1 to P8

Australia Shell Australia Pty Ltd (SDA)

Ruru-3A New Zealand Shell Todd Oil Services (STOS) Maui-08 & Maui-08A New Zealand Shell Todd Oil Services (STOS)

South Furious: SF-15 Sabah, Malaysia Shell Malaysia (SSPC), Sabah Malikai Field: MLK-120, MLK-107, MLK-104, MLK-116

Sarawak, Malaysia Shell EPA Malaysia (Sarawak)

F14 Field: F14-104, F14-105, F14-107, Sarawak, Malaysia Shell EPA Malaysia (Sarawak)

Fushun Field: Gu202-H1, Gu205-H1, Gu206-H1 Sichuan, China Shell China (SCEPCO)

Changbei Field: CB17-1 Beijing, China Shell China (SCEPCO) Jinqiu Field: QL-2 Beijing, China Shell China (SCEPCO) South Furious: SF-509 Sabah, Malaysia Shell Malaysia (SSPC), Sabah Gumusut/Kakap: GK-P504B

Sabah, Malaysia Shell Malaysia (SSPC), Sabah

Champion Field Brunei Brunei Shell Petroleum Co.

Melor Malaysia Petronas Carigali Sdn. Bhd.

Kumang Malaysia Petronas Carigali Sdn. Bhd.

Tangga Barat Malaysia Petronas Carigali Sdn. Bhd.

2000 - July 2006 International Logging Orogenic Sdn. Bhd. Puchong, Selangor, Malaysia

Wellsite Geologist

• Involved in Exploration and Development Wells.

• Worked at the wellsite (offshore) as client / oil company’s representative, and reported to the Operation Geologist / Petrophysicist in town.

• Experienced in well correlation with the offset wells.

• Describe and evaluate sample from drilled cutting, and to observe oil or/and gas present in the wells, and to do quality control on well logs which are produced by Mudlogging Services, MWD Services and Wireline Logging Services.

• Some of Well Experiences as Wellsite Geologist:

Rig Name Client Country Field Name Duration

Pride Piranha PCSB East Malaysia Kinarut Jan-May 2004

Ensco-52 PCSB Pen. Malaysia Besar, Senjuang July-August 2004

Hakuryu-3 PMU East Malaysia F2-Attic, NC4 Sept-Oct 2004

Hakuryu-3 CSMP Pen. Malaysia Bunga Anggerik-1 Nov-Dec 2004

Trident-20 PCTSB Turkmenistan East Livanov-3A Jan 2005

Trident-17 PCVSB Vietnam Ruby Feb 2005

Roger Mowell TML Pen. Malaysia BRB-16 Apr-May 2005

Harvey Ward CSMP Pen. Malaysia Bunga Kesumba-1 May-June 2005

Harvey Ward PCSB Pen. Malaysia Tuah-1 June-July 2005 1997 - 2000

Geoeast (M) Sdn. Bhd. (Geoservices Ltd.) Kuala Lumpur, Malaysia Mudlogging Engineer / Data Engineer

• Worked at the well site and reported to client / oil company’s representative.

• Describe and evaluate sample from drilled cutting, and to observe oil or/and gas present in the wells. Monitor rig’s operation especially drilling, casing, well control and production testing. Produce Well Logs based on the drilled cutting, and to work with Wellsite Geologist.

Technical Background

• Very experienced with rig drilling operations from drilling optimization aspect where target or objective of a well should be achieved efficiently.

• Very experienced with Halliburton’s Software such as INSITE (used for real-time log), PLANIT (for BHA design and optimization), Drillworks (for pore pressure calculations) and WellPlan (Torque & Drag, Hydraulics for Drilling/Tripping Roadmaps).

• Experienced with the Halliburton’s DSI - Activity Analyzer (Max Activity) Software for Drilling Performance / Analytic work.

• Well versed with log-making software such as Geoplot and Advanced Logging System, as well as the IT skills for communications and data transmissions from rig site to base.

• Experienced with Mudlogging equipments, MWD and Wireline Tools.

• Computer literary: Good in Microsoft Application (Ms Access, Ms Word, Ms Excel), Drilling Logic System Software (Drilling Data Acquisition) and computing setup.

• Monitored and analysed key performance indicators for drilling operations (example: Trip time, Connection time, etc.).

• Ability to work without or with minimal supervision, able to be a leader in a team and able to work efficiently in a teamwork.

Training Attended:

• DS INSITE – Data Analyser / Max Activity Training (Halliburton – Nov 2015)

• WellPlan T&D and Hydraulics Training (Halliburton – August 2015)

• IADC Drilling WellCAP Supervisory Well Control Training (HPTTCo Ltd – June 2014)

• Trouble Free, High Angle, ERD & Complex Well (Merlin ERD – March 2014)

• Stuck Pipe Prevention – Train Wreck Avoidance (PetroSkills – March 2014)

• Drillworks Basic Course (Halliburton – Feb 2009)

• ADT Courses (Halliburton – Feb 2009)

• Pressure Engineering Course (ILO – Feb 2001)

• Advanced Logging System Course (Geoservices – July 1998)



Contact this candidate