Post Job Free
Sign in

Project Manager Electrical Engineer

Location:
United States
Posted:
April 01, 2016

Contact this candidate

Resume:

Tarek Mohamed

Abu Hamour- Doha- Qatar

*********@****.***

Tel:44174942

Mob: +974-********/+974-********

Education:

B.Sc. in Electrical Power Engineering, Faculty of Engineering Alexandria University, Egypt. 1990 graduate.

Work Experience : 26 Years

Summary

1.Ability to effectively influence and manage diverse cross-functional teams,

2.Comfortable with multi-tasking and balancing numerous projects/deadlines/priorities,

3.Proven experience using agile project management methods

4.Managing the end-to-end delivery of projects.

5.Working with multidisciplinary teams – and ensuring client expectations are managed and met.

6.Ensuring the projects are delivered on time, meet business & technical requirements and are within the agreed budget.

7.Establishing and maintaining effective working relationships, breaking down barriers for the team and both planning at a higher level and getting into the detail to make things happen when needed.

8.Defining project needs and feeding these into the program/portfolio process .

9.Enabling resources to be appropriately allocated.

10.Anticipate, manage and resolve issues and act as the point of contact for the project.

2012- Until Date Electromechanical Engineering Company. (QATAR)

Sr. Projects Manager

Projects Executed:

1.Development of Shooting Ranges for Emiri Guard @ Lehsaynia, Qatar.

2.Development of ABM Military College for Qatar Armed Forces

The scope includes:

Supply, Installation, Testing & commissioning of complete Electrical, Plumbing, and Drainage, Fire Fighting, Fire Alarm, Ventilation & Air conditioning works (Buildings Scope).

Execution of Infrastructure Scope, No. of 9 substations, 6 pumping stations, street lighting, MV/LV power network, Structured Cabling, Telecommunication, and the BMS works (Infrastructure Scope).

• Prepare the project plan, manpower and quantities.

• Develop detailed petty cash budget.

• Prepare shop drawings & material submittals.

• Prepare BOQs and coordinate with logistics for timely supply.

• Develop methods statements and Testing & Commissioning procedures.

• Prepare progress reports and initiate invoicing with accounting team.

• Manage the project’s field staff and subcontractor performance.

• Ensure quality and safety to guarantee compliance with the contract documents.

• Coordinate with other trades (mechanical, civil, architect …)

• Prepare variation orders

• Maintain strong relationship with clients, contractors and subcontractors

• Train the technician and site engineers on all systems

• Conduct the testing and commissioning

Buildings Included

1.9 Entry gates.

2.12 Watch Towers.

3.25m,50m,100m,300m,400m Shooting Ranges.

4.Simulator Building.

5.Grenade Field.

6.Olympic Size Swimming Pool Complex. (Diving, Training& Main Olympic Pools)

7.BMS Building.

8.Olympic & Military Obstacle Course.

9.Physical Training Course.

10.Infrastructure.

Electrical Systems:

LV/MV/HV Distribution Boards/ Capacitor Banks – Transformers Up to 66KVA – High& Low voltage Distribution Networks (Cables/Cable Carrying Systems)- Generators/ATS- Lighting/Lighting Control Systems- External Lighting-Earthing & Lightning Protection Systems- Wiring Accessories- UPS- Public Address-CCTV-Access Control- Audio Visual- SMATV- BMS- Nurse Call System-IP Telephone & Data - Fire Alarm System.

Mechanical Systems:

Plumbing- Drainage-Water Supply- Fire Fighting- HVAC- Irrigation.

2006-2012 DANWAY QATAR (QATAR)

Sr. Project Manager/ BDM

Projects Executed:

1.Peripheral Roads to Barwa City: Procurement, Installation, Testing & Commissioning of 13 Numbers 11KV/ 415v Substations. Including Transformers, HV/MV panels installation & Cable terminations.

2.Al Wakra Hospital Modification Works.

Telecommunication, Power, lighting, BMS, HVAC, Drainage, Plumbing, Fire Protection & Medical gas networks modifications.

3.Execution of works for Pumping Stations at 22nd Feb. Street & Al Amir St., Upgrade and Interchanges (Doha Expressway)

4.Doha North Sewerage Treatment Associated Works, TSE 3 Pumping Stations and Main, CP 682/4.

5.MEICA Installation Works for Pumping Stations, PSLD 01 and PS 35/1/11

6.NDIA 00001/01 North/South Extensions to Ras Abu Abboud Road – Electro Mechanical Works (Drainage Compound)

7.DRC 00116 Rationalization of TSE System at CP 685.

8.GTC71 Electrical Subcontract Works for Salwa Industrial & Bani Hajr Pumping Station

9.GTC 07/122/ED EPIC for the power supply in DUKHAN for PHASE 7 & NWDH housing.

10.GTC 06/264/OED Upgrade of Electrical Facilities at PWI Station No. 6 in Dukhan Fields.

Projects Awarded:

1.Doha north sewerage and associated works TSE3 (Torishima).

2.ERC 1400/D20/C1 execution of remaining works for Doha express way package (1&2).

3.GTC269/2008 New Reservoirs& associated pipelines. (QBC)

4.GT10100800- EPIC for Electrical PCR works at production stations within Dukhan fields. (QP)

Responsibilities:

1.Fully responsible for the effective leadership, operational management, financial and commercial management, risk management, tender evaluation.

2.Projects negotiation and finalization & dispute claims.

3.Business development and initiatives for bringing in new contracts and maintenance of existing business relations.

2004 – 2006 THERMO LLC (DUBAI, UAE)

Project Manager/ MEP Coordinator

Projects Executed:

1.QC Laboratory for ADNOC/Borough – Engineering Works.

2.Abu Dhabi paper Mill & Carpet Factory.

3.Tabreed Cooling Plant MBZC (AD-12).

4.ADNOC Ruwais Hospital.

5.Bridgeway mixed use development.

6.Responsibilities:

7.Verifying contract documents like drawings, specifications, and bills of quantities

8.Planning for electromechanical work and preparation of charts and programs for

9.material submittals, shop drawings etc.

10.Preparation of material submittals, project, labor and material planning.

11.Supervision for procurement, preparation of daily/weekly/monthly progress reports

12.Control the preparation of MEP shop drawings and implement changes in services to suit actual project condition, authorities’ regulation and other services of the project.

13.Control day to day activities of the site installation

14.Monitor labor productivity and installation progress, and modify to meet main program and target

15.Follow up with Authorities viz. ADDC Etisalat, Civil Defense, Water and Drainage Departments during preparation of shop drawings till final handing over of the project

16.Preparation of inspection and test plan, method statement, pre-commissioning/commissioning check lists, testing procedures and test certificates following the guidelines of the Client Engineers, specification requirement integrated with Company’s quality system.

2001 – 2004 SAUDI PAN KINGDOM ENGINEERING AND CONTRACTING CO. (KSA)

Sr. Electrical Engineer

Projects Executed:

1.Al Jouf College of Technology.

2.MEP Installation works at Arar Domestic Airport.

3.9 No's of male & Female Schools in the Northern Region.

Responsibilities:

1.Prepare and review technical Proposals, cost estimation, engineering submittals, project schedules and budgets.

2.Assign various teams to site activities, direct and supervise teams for proper and timely execution of site works

3.Ensure HSE and QA/QC regulations are fully adhered to during site activities.

4.Raise progress reports to CM/PM.

5.In charge of the company projects planning / engineering / execution and maintenance in the northern region.

6.Responsible of technical coordination between draftsmen and engineers.

7.Co-ordinate with project engineers on all activities related to construction and provide assistance on engineering related matters such as design and specification, clarifications and changes, value engineering.

8.Modify engineering calculations related to field requirements and design instructions.

9.Produced the first set of companywide job descriptions with associated organization chart.

1991 – 2001 ALEXANDRIA POWER DISTRIBUTION AUTHORITY (EGYPT)

Maintenance Department Head

Responsibilities:

1.Study and review infrastructure drawings and specifications.

2.Prepare labor, tools and equipment requirement for proper execution of works.

3.Investigate installation problems and recommend solutions.

4.Ensure compliance with safety requirements and standard procedures.

5.Handled metering during substation maintenance intervals and provided technical support.

6.Coordinated a program that reduced maintenance overtime, enhance system reliability during major system disruptions and reduced outage times for one of the major residential areas in Alexandria.

Languages:

1.Arabic: Native language

2.English: V. Good

Skills and Fields of Expertise:

1.Thorough knowledge of Microsoft Word, Excel, Power Point and AutoCAD.

2.Project Management Professional (PMP).

3.Risk Assessment/ Recovery Plan.

4.Project Planning/ Documentation.

5.Quantity Surveying / Monthly invoices.

6.Project Claims.

7.National Electrical Code (NEC)

8.National Fire Protection Association (NFPA)

9.Qatar National Construction Standards (QCS)

10.Occupational Safety and Health Standards (OSHA)

11.KAHRMAA Regulations & Standards.

12.QCDD Fire Safety Standards.

(Grade A) UPDA Certified Electrical Engineer.



Contact this candidate