SRIKANTH AMMANABROLU
***** ******* ***, ****** *****, CA 92843 714-***-**** ************@*****.***
Professional Summary
Three years of both Academic and Practical experience in Civil Engineering and Construction Management with strong engineering knowledge base and work ethic. Able to function well as an independent worker or as a member of a professional engineering and construction team Skills
Project planning
Preparing RFI's and Proposals
Project Schedules
Budgeting
Field Engineering
Land development
Preparing Engineering reports
Construction site management
Drafting AutoCAD 2D
Moderate in Civil 3D
Microsoft Office Suite
Strong communication skills
Client relations
Site layout
Interpreting blueprints
Work History
Assistant Project Engineer, 01/2013 to 12/2013
Ramky Infrastructures Pvt.Ltd
Worked as an assistant for Sr. Engineer, preparing plans, proposals and project coordinator
Field Engineering to ensure that the work is being done correctly to the project design
coordinated and interfaced with all the staff members involved in designing and reporting
Closely involved in reviewing construction needs with appropriate management staff and allocate resources accordingly
Planned schedules for the safety of workers also verifying whether the project stays on schedule
Prepared spreadsheets and maintained weekly updates and reported to manager Intern, 01/2015 to 05/2015
Orange County Water District
Worked on Demolition of existing Burris Pump Station phase 2
Worked on the analysis of scrapper and truck production rate which reduces the cost and duration of the project with limited site access, fluctuating water elevation of Burris Basin, time restriction to perform certain tasks
Assisted Sr. Estimators also Assisted construction manager in management activities Education
Master of Science: Civil Engineering and Construction Management, Graduated Dec 2015 California State University –Fullerton, CA
Bachelor of Science: Civil Engineering, Graduated May 2013 JNTU Hyderabad - INDIA
Academic Projects
Involved in estimating the cost of the construction of a two story residential building - Calculating the total cost of construction. Estimating the total cost of land, plan, design, materials, permits, labors and equipment cost.
Burris Pump Station Phase 2- Owner/Client - Worked on Demolition of existing Burris Pump Station, located in City of Anaheim, County of Orange, California. Worked on the analysis scrapper and truck production rate which reduces the cost and duration of the project.
Design and Analysis of Gutter bridge-Project refers to the bridge that is being laid with a distance of 212kms. The proposed highway is a four lane highway and the bridge is been with respect to the center line of the four lanes.
Designing the five-story office building- with all the design categories foundation, columns, beams, slabs (one-way slab) and shear walls. It also aimed to design maximum parking spaces within the structural scheme everything followed from ACI code.
Construction of a single-family housing complex-managed by United Construction under the supervision of WHR Architects Inc. An agreed upon contract type by both parties will be a lump sum contract which contain the global price instead of bidding individual items. The contract type matches with this type of project. This contract is normally used in the construction industry to reduce design and contract admission costs. WHR Architects Inc. will be making monthly payments based upon the percentage of work completed.