Post Job Free
Sign in

Engineer Management

Location:
Algeria
Posted:
December 13, 2015

Contact this candidate

Resume:

resume CV

BARCHI ABDELWAHEB

email : ******.**********@*****.***

Date of birth 23jan 1959

Married 03 childrens

ADDRESS : ** */***** ******** ****** OULD BRAHAM CITY 19000 SETIF ALGERIA

TEL FIXE +213********

MOBILE +213*********

Bachelor degree - Drilling engineer diploma since 1984

High school sonatrach/IAP Algerian petroleum institute (1978 -1984)

HSE attestation Canada institute: management for drilling

Cost control diploma : BUDGET EVALUATION MANAGEMENT

Certificate of completion ( Hydril annular BOP . service & maintenance )

Valide IWCF certificate ( surface bop stack .supervisor level 4 ) may 2016

Languages

English /Speaking writing -French / Speaking .writing - Arabic / Speaking .writing

KNOWLEGDE in informatique excel word powerpoint

Experiences

+25 years in drilling activity ( onshore )Algerian desert area ; oil&gas exploration & development activity .

Achieved drilling land rig management (+15 rigs ).

well site drilling operations and rigs management at different level and for different rigs power. some experiences in drilling supervision and completion Both oil and gas well development and exploration activity.

Experiences also in drilling water well :/ exploration well project purpose ( lifting compressor method ).

From 1000hp to 2000hp power DESERT LAND rigs/

AC – DC electric SCR system and AC- AC drive system in VFD last tech electric drive system such as remote raise up/down mast. Drilling landrigs performances and mitigations such as drilling equipments deficiencies, fall;boreholes drilling behaviors: find drilling activity well site issues solutions.

Lieu :ENAFOR (ALGERIAN DRILLING CONTRACTOR /FILLIALE SONATRACH GROUPE

Drilling vertical and short radius deviation wells ( horizontal well ) : /workover reentry well /moving RIG UP RIG DOWN :inspection civil work and rig acces ……WELL pad / familiarise RIGMOVER _ rig mast transportation fast & safety

/coring / top drive /FISHING tool instrumentation : backoff procedure /DRILLING JAR /well control /casing _liner running/ETC

Last job occupied :: independent Drilling consultant at ENAFOR/SH -2014

RIG SUPERINTENDENT at COMPANY ENAFOR ( Algerian drilling contractor)

Year from 2008 2012

FIELD Rig superintendent / PROJECT ACTIVITY IN DRILLING DEVELLOPEMENT WELL

ENAFOR with OPERATOR SINOPEC DRILLING CAMPAIGN :

40 WELLs compaign realise IN ZARZAITINE FIELD IN AMENAS

From 2006…….2007

FIELD RIG superintendent / PROJECT DRILLING EXPLORATION ACTIVITY WELL

ENAFOR with OPERATOR ROSNEFT SCLUMBERGER IPM

03 EXPLORATIONS GAS WELL 3650 M DEPTH in OHANET FIELD in amenas region

From 2003 2006

FIELD RIG superintendent / PROJECT DRILLING REINTRY SHORT RADIUS WELL

EL GASSI FIELD / HASSI MESSAOUD REGION witth operator AMERADA HESS

25 REINTRY WELLs 3700m DEPTH WITH +500m HORISONTAL DRAIN

From 2002…..1999

Assistant rig senior superintendent: ONSHORE BASE / SONATRACH CLIENT

workover – OIL and gas drilling activity – water well 15 drilling unit )

Implement and coordinate activity between different rig as well as :

drilling issues ( stucking –circulate loss -fishing activity –etc ) rig moving – rig maintenances – supervision water well for exploration drilling well purpose.

LESS NPT – budget evaluation,cost control, etc

Rig management at ENAFOR .BASE YARD

REVAMPING REFURBISH

COMMISSIONING old rigs from workover activity to drilling activity – rigs audits

DERRICK SUBSTRUCTURE REPAIR AND CONTROL WELDING

RE UPDATE MUD PUMP – DRAWWORKS - MUD TANKS - top drive ETC

TRANSFORMATION OLD POWER SYSTEM ex DC DC TO SCR SYSTEM or mechanic to electric etc

Commissioning and acquisitions new rigs and intern rigs audits .

From 1998…….1992

Tour pusher / tool pusher in HASSI MESSAOUD FIELD different rigs .

WORK OVER activity in hassi messaoud field;and water well managing

From 1991 1987

Different activity as initiation in many posts in different drilling rig unit :

Roustabout __ roughneck _ derrickman -_ assistant driller _ driller

training engineer

1986….1984 Military service

Well site area operation desert landrig ability and drilling management .

Implement drilling activity less NPT _ drilling activity problem solving ( stucking –avoid flushing cementing job - loss circulation _ fishing etc )

Optimize rig move ( FAST AND SAFETY)

I like challenge and dynamic job position .

Ability for displacement and coordinate rig to rig ;good liaison and convinces to operators,for solving any problems occurs in rigs are my main satisfactions .

ANTICIPATE ALL TROUBLSHOOTING CAN OCCURE ON RIG .

Optimize drilling cost by controlling all suplly drilling equipements on rig site and good appropriate using .

Good communication( leadership ) with crew . operator client, subcontractors.

Land Drilling rig component expert .



Contact this candidate