ELBERT C. TALAUGON
Angilan Aloguinsan Cebu
Cellphone number; 091********
******.**********@*****.***
Seek an inspiring position of Mechanical Construction & maintenance Supervisor
A competitive worker with an experience in different field of Mechanical construction & maintenance, such as coupling alignment of Boiler Feed Pump, ID Fan, Primary, Secondary Air Fan, installation & alignment of Gas Turbine, installation of Travelling Screen, reconditioning of pumps, piping fabrication & installation, cladding insulation of power plant and promote safety to all subordinate and maintain safe working site condition.
SUMMARY OF QUALIFICATION
Completed Mechanical Engineering Course at the University of Cebu. Batch ‘94
Starts with the lowest position of construction & maintenance, to study & hands-on different Mechanical scope.
Thorough knowledge of piping fabrication and installation.
Uncommon skills in plant maintenance activities.
Strong ability to perform assigned skilled worker to do maintenance tasks properly and efficiently.
Immense skills to operate high torque equipment to meet the required torque value of pipe flange joint and demonstrate the correct usage to different mechanical tools and equipment’s.
In-depth ability to work independently without the presence of the high rank of official
Infrequent ability to understand and follow oral and written instructions.
Has an ability to establish harmonious relationship to the skilled workers, to maintain safety and acquire zero accident in the field of construction and maintenance.
Computer Literate.
Professional Experience
Taganito High Process Acid Latching (THPAL)
ACGI Metaphil Maintenance, Taganito Claver Surigao del Norte
2011 - Present
Mechanical Supervisor;
Present the accomplishment report to the Client every morning meeting
Give daily maintenance assignment to my subordinate and check site working condition.
Evaluate the number of manpower needed for the Task and motivate them to comply safety standard.
Supervised on fabrication of mitered elbow, concentric and eccentric reducer for spare/needed at site installation.
Perform maintenance activities for Generators, Blowers,
Also make a working methods/supervised for replacement of fluidizing nozzle, Agitator Mixing Tank, snub pulley and other major maintenance activities.
Maintenance supervision activities of Agitator, pumps conveyors and other related equipment on the Process.
Conduct lecture on piping fabrication, methods of coupling alignment and scaffolding standard structure.
ERQ Construction: Taguloan Cagayan Misamis Oriental
2007-2011
Mechanical Supervisor;
Responsible for Lay-out, installation of Travelling screen and its pump components.
Installation and alignment of Generator and Gas Turbine (18.5 MW) PSC Villanueva Cagayan.
Erection/installation of turbine hood, condenser, condensate pump and Fan Blowers.
Established the Working point and Lay-out/installation and Alignment of ID Fan.
Lay-out/installation and alignment of Boiler Feed Pump.
Supervised Piping fabrication and installation of newly advance Tag Boat (Hull 16 & 17) at Keepel Cebu Shipyard.
Responsible for the two units 103MW cladding insulation Expansion project at KEPCO Colon Naga Cebu
Fabrication/installation of CS, SS & HDPE Pipeline MESCO Project, THPAL, Taganito Claver Surigao.
ACGI Metaphil: Tipulo Mandaue City Phils.
2004-2007
Mechanical Foreman;
Responsible for fabrication furnace, deflector cone, radial beams, rake arms and other international fabrication project by ACGI Metaphil.
Piping Fabrication/Installation Project in Petron Petrochemical, Limay Bataan
Installation and alignment of Pony drive, Boiler Feed Pump, turbine, conveyors under STI Project, Botong Sugar Mill Valencia Bukidnon.
Cement Management Corp: Makati Metro Manila
1997-2000
Project Engineer;
Responsible for installation and alignment of Ball Mill ( Furtune Cement Corp.) Taysan Batangas.
Evaluate the project status based on the Target construction schedule.
Make detailed schedule on installation of Rotary Kiln.
Installation/reconditioned the Air Separator and Air slide.
Installation /alignment of conveying system, ( fan conveyor & bucket elevator and Air slide)
Fabricate/installation of screw conveyor of ESP, the erection of collecting plate and alignment of ID Fan.
Alltech Construction Inc. Araneta Avenue Metro Manila
1994-1997
Mechanical Helper Mechanical Foreman;
Assist the millwright skilled worker on alignment of rotary equipment in Cement Manufacturing Plant at FR-Cement Teresa Rizal
Expedite materials in preparation for Pre-assembly for Pre-Heater Duct.
Collect daily manpower, accomplishment report.
Mechanical Erection of Down comer Duct, Preheater.
Erection/Fit-up and Alignment of Kiln.
Installation of Clinker Cooler and Fan conveyor.
Installation and alignment of Ball Mill.
Fabrication of square and rectangular to round.
EDUCATIONAL BACKGROUND
Elementary Graduate 1986
Putat Elem. School
High School Graduate 1989
Saint Anthony’s Academy
Tuburan Cebu
College Graduate 1994
University of Cebu
BSME
TRAINING’S AND SEMENARS ATTENTED
Incidents Injury Free (IIF) Supervisory seminar (conducted by THPAL
Integrated Management System (IMS) Occupationary Safety and Health (OSH)
All information stated above is true and correct
Respectfully Yours,
Elbert C. Talaugon
applicant