RESUME OF
LEOPOLDO JAVIER DIMAPILIS JR.
OBJECTIVE: To secure a permanent position in a competitive, stable and reputable company wherein I can share and utilize my acquired knowledge and skills and to be involved and part for the benefit and success of the company.
WORK EXPERIENCED
AUG 15, 2014 to SEPT.19, 2015 PROJECT PIPING ENGINEER
PROJECT; HICAP PROCESS PIPING EXTENSION 2
WEL CONTRACTING CORPORATION
TECHNOPARK, BINAN LAGUNA, PHILIPPINES
- Supervision of piping installation for process cooling water line, compress air line, chilled
water supply and return, cooling water line supply and return and compress dry air line.
- Submittal approval all mat’ls. needed for piping installation.
- Attend construction coordination meeting for status report and concern of all mepfs and
other field including architectural, structural and civil.
- Submitt shop drawing for rerouting of piping installation w/c.does not suit for actual
installation
- Request all materials and equipment needed 3 weeks ahead to avoid delayed and to update
construction schedule
- Ensure that the latest drawing are in latest revision and approval for fabrication
and construction.
- Report to the project manager to any technical problem.
- Make construction schedule for catch up of delayof work including manpower,and
materials loading
- Coordinate to purchaser for all materials requested and all materials approved by the client
NOV. 16, 2013 TO MAY 16,2014 PIPING SUPERVISOR
PROJECT; RMP-2 PROJECT PETRON BATAAN
DAELIM
LIMAY BATAAN
- Conduct checking of all pipe spool delivery at site
- Do punch list of all test package and give to piping supervisor to prioritized each package
- Supervision subcontractor of piping execution in all discipline
- Advised for the most priority line and directly inform all piping discipline.
- Make construction punch list of every test package.
- Verify and check NDT requirement of test package prior to hydrotesting
- Advised piping discipline to add manpower of each area to meet the target schedule.
- Interfaced with engineering and other department to discuss plans or any clarification
for the installation process.
- Monitor all piping works on fabrication shop and fields.
- Conduct regular walkdown, reviewing of the work activities, identifying areas of concern
and any safety hazard require special and attention.
- Assisting construction supervisor in site activities, pipe erection, fit up,welding and
support installation.
NOV. 20, 2012 TO SEPT.20, 2013 PIPING SUPERVISOR
PROJECT; RMP-2 PROJECT PETRON BATAAN
SUNGDO
LIMAY BATAAN
- Coordinate to engineering department to as built drawing for re-routing of pipe
which does not suit in actual site condition.
- Line checking of every test package and request all erection materials balance.
- Inform and fallow up to piping superintendent of all requested materials
- Request for inspection for fit-up,,air blowing and Oriface flange.
- Supervision of piping installatrion of above ground piping
- Plan and schedule 3 weeks ahead all tools,materials and equipment needed.
- Supervision of 4 piping foreman
Oct. 10, 2010 – Oct. 10, 2012 PIPING ENGINEER
PROJECT; HADEED STEEL MAKING
AL RUSHAID CONSTRUCTION COMPANY
JUBAIL SAUDI ARABIA
- Job role as piping engineer
- Supervised and assist superintendent of piping installation and erection.
- Monitor re-routing of pipe which does not suit actual site condition
and to be coordinate to the client
- Request all erection materials at site.
- As built drawing and coordinate for client for approval.
- Ensure that the latest drawing are in latest revision and approval for fabrication
and construction.
- Report to the piping superintendent to any technical problem.
- Punchclearing of qcbackpunch for material balance and other problem.
- First contact of in site construction issue,proper interpretation of piping class
analysis,GA,ISO,P& ID.
- Survey qty of materials and equipment needed in the project.
- Monitor all materials; incoming and outgoing materials from and to other section.
- Prepare inspection request and assist inspector when needed
- Received construction drawing prior to fabricate and ensure that the drawing,specification,
procedure are in correct revision.
- Initiates inspection and make inspection request and conduct regular technical assessment
and site monitoring and see to it that the work are in accordance with schedule, plans and
quality objective of the project.
- View smart plant review for clarification
July, 2009 – Aug., 2010 PIPING ENGINEER
PROJECT; SHARQ 3RD EXPANSION PROJECT
AL RUSHAID CONSTRUCTION COMPANY
AL JUBAIL SAUDI ARABIA
- Job role as piping engineer
- Supervised and assist superintendent of piping installation and erection.
- Monitor re-routing of pipe which does not suit actual site condition
and to be coordinate to the client
- Request all erection materials at site.
- As built drawing and coordinate for client for approval.
- Ensure that the latest drawing are in latest revision and approval for fabrication
and construction.
Apr. 03, 2008 –MAY. 10, 2009 PROJECT SITE ENGINEER
PROJECT; MECHANICAL INSTALLATION OF
FIRST PHILEC, PHIL.
Mecel, Construction & Electrical Inc.
Mayondon, Los banos, Laguna (049-***-****
- Request all materials and equipment needed 3 weeks ahead to avoid delayed and to update
construction schedule
- Ensure that the latest drawing are in latest revision and approval for fabrication
and construction.
- Report to the project manager to any technical problem.
- Make construction schedule for catch up of delay of work including manpower,and
materials loading
- Coordinate to purchaser for all materials requested and all materials approved by the client
Jul. 2007 – Dec. 2007 SERVICE ENGINEER
Advance Newtech
Sta. Rosa Laguna
- Water analysis of h2o contaminant of chilled water, cooling tower and boiler.
- Supervised Chemical treatment and Mechanical cleaning of cooling tower and
water line.
March 04, 2004 –Aug.10,2006 PIPING FIELD ENGINEER
PROJECT; PETRON BATAAN REFINERY-
PETRON FCC REVAMPING PROJECT
EEI CORPORATION
BATAAN
- Line checking
- Monitor and request all erection materials at site.
- As built drawing for re-routing of pipe.
- Update drawing as per latest revision.
- Coordinate for qc department for RFI(fit up and air blowing)
EDUCATIONAL BACKGROUND:
College COLEGIO DE SAN JUAN DE LETRAN
Calamba City
Bachelor of Science in Mechanical Engineer
1998
PERSONAL:
Born on the 17tn day of June 1975 at Calamba City, single, male, stands 5’7”
135 lbs.
SKILLS:
- Computer literate ( MS Word, Excel, Auto Cad 2000)
- Good drafting skills and technical manual and cad.
- Interpersonal,communicate, people management and leader ship skills.
- Knowledge of materials selection substitution in conformity of piping installation.
CHARACTER REFERENCES:
Available upon request.
SEMINAR ATTENDED:
Industrial A/C Motor Control
Meralco Foundation Institute
Pasig, Metro Manila
May 02, 2000 – May 13, 2000