Dear Professional Associate,
Please consider my resume in your search for a Senior Engineer / Project Manager.
Active DOD Secret Clearance.
With thirty years of electrical and electronics engineering background from Lockheed Martin, General Electric, Johnson & Johnson and Motorola, I have the experience required to excel in any design or management position. I have electrical, electronics, building, land development, real estate, and business ownership skills. I have a Master’s degree and a Professional Engineering License in Florida and Texas. I obtained my Unlimited Electrical Contractors License in Florida (2007); this assures that I know the NEC, NFPA, UL and various other codes. I have circuit design (analog and digital) picoamps and microvolts to kiloamps and kilovolts. Embedded programming in C (video display) and assembly using Intel 8086, Microchip PIC, Motorola (68HC11), Atmel (Digital Altimeter, power supply and LED’s) for DME Corporation and recently TI DSP TMS320F2812 (Brushless DC motor Control). Test and manufacturing experience ranging from medical equipment (patient monitoring systems) to aerospace systems and communication equipment (radio and cable television). Recent new product design experience includes design of digital cameras, R&D on radio/cell phone user interfaces, video (flat panel display interfacing) and switching power supply design to meet UL601-1. Extensive instrumentation and equipment experience, including: data acquisition, PLC’s (Gould and Honeywell), and design/modification of robotic and Laser process and test equipment.
I have power experience with Industrial / Commercial and Residential wiring and systems. While working for GE I was in charge of the entire manufacturing plant. Including switchgear, transformers, transfer switches, large UPS systems.
I also have construction experience and business skills: Professional Engineer Since 1993 with no incidences on my record, Passed General Contractor Exam and designed, pulled all permits and finished my 7,300 sq ft home in August 2003, sold it in Sept 2005. I also owned, managed and maintained a rental property with 6 units from Oct 1986 to Feb 2001.
I have also built a townhouse in 2007.
Real Estate Sales License, State of Florida, July 2013. I am continuously learning new material in different areas to broaden my knowledge and make more informed business decisions. The study material for the license covers many legal, financial, marketing and business strategies not only for real properties but businesses as well.
I enjoy technically challenging work and I am accustomed to a fast paced environment where deadlines are imperative and handling multiple jobs simultaneously is the norm. Supervisory skills and negotiating with both management and outside contractors demonstrate my communication skills.
Thank you for your time and consideration.
Sincerely,
Raymond C. Vivian Jr.
Raymond C. Vivian Jr., PE
3909 Murphy Ct.
Arlington, TX 76016
Cell. Ph. 954-***-****
Raymond C. Vivian
3909 Murphy Ct
Arlington, TX 76016
Cell 954-***-****
**************@*****.***
SUMMARY OF EXPERIENCE:
Licensed professional engineer with over thirty years experience in all phases of electronics, including design, management, manufacturing, computer programming, repair and troubleshooting.
Management Experience (Business Owner for 10+ yrs) Real time embedded software design
Circuit Design: Analog (DC-RF) and Digital Aerospace and medical electronics design
Consumer Electronics: Cell Phones, Digital Cameras Business: General Contractor, Apartment rentals
Unlimited Certified Electrical Contractor Prototype R&D design
EMPLOYMENT
Staff Electrical Engineer: March 2011 – Present: Lockheed Martin MFC, Grand Prairie, TX.
August 2014- Present; Electrical Engineer supporting Patriot Missile System (PAC3)
System failure analysis requiring analog, digital, FPGA, and processor knowledge for formal Failure Review Board presentation to the Government customer.
Investigation of a problem with production failures of the launcher motor control unit. I identified the problem as noise generated by a switching circuit coupling into the control circuits. I designed and implemented a solution saving the production schedule millions of dollars in losses.
Investigated card cage wiring harness installation issues. Designed and implemented a solution and was given an award.
Led the design team of an electrical system for a portable remote missile repair facility. This is a system utilizing a generator to power HVAC systems, electronics systems and all required lighting and safety systems. The group is utilizing my wide range of skills from my previous years of facilities experience in addition to manufacturing and electronics troubleshooting / repair skills.
March 2013 – August 2014; Electrical Engineer supporting Guided Multiple Launch Rocket System (GMLRS)
Designed a test interface box for a new ISD (Int. Safety Device). This was used to pass the formal LIT/SIT testing.
Working with guidance group to resolve problems on Honeywell guidance boards in Level 3 electrical tests.
Small triple output switching power design (approx 40W) for a guidance set.
March 2011 – March 2013; Join a startup business group designing and installing power management (microgrid) systems.
Use multiple sources (generator, solar, energy storage system) in an islanded and grid tied microgrid system.
Designed and installed a Schneider Vijeo ciTech SCADA into our microgrid development laboratory. Attended class from Schneider for the SCADA software.
Write statements of work (SOW) to purchase items and hire subcontractors for the Fort Bliss microgrid ESTCP MEDES project. Controls design and implementation.
Specified and purchased materials to complete job and manage construction activities.
Performed all drawing changes and municipality communications.
Use EDSA to perform fault calculations, arc flash and breaker coordination.
Studying dynamics and control of power systems for use in microgrids.
Proposal and design (electrical, switching and algorithms (microgrid black start and shutdown, margin control, peak shaving, energy storage control) of Spiders (Fort Carson, CO microgrid). Recent patent submission as primary designer.
Electrical Engineer (Part time as needed) Jan 1998 – March 2011; American Building Engineers (ABE), Fort Lauderdale, Fl.
ABEProfessional Engineer/ General Contracting firm that bids, designs plans and builds commercial, Industrial and residential construction.
Electrical engineer for all building designs including all panel layouts, NEC load calculations, Florida Power fault calculations, lighting designs.
Value engineering for all designs to save money and meet all codes.
President: October 2008 – March 2011; Apex Contractors Inc, Self Employed: Owner of General and Electrical Contracting Business.
Professional engineer on all projects, sign and seal drawings to obtain permits.
Bid projects, Commercial, Industrial and Residential
Write, review and negotiate contracts for projects.
Specified and purchased all materials to complete job and managed all construction activities.
Performed all drawing changes and municipality communications.
Completed electrical contract from American Building Engineers to convert 10,000 sq ft of warehouse to office space.
Senior Electrical Engineer: October 2007 – September 2008; Pool People Commercial, Pompano Beach, Fl. Design electrical plans for commercial structures and water parks.
Company designs and builds large water parks with multiple slides, wave pools, etc.
Complete electrical plans including service entrance and municipality communications.
Specified switchgear, transformers, wire sizes and panels to complete 1MW job with multiple buildings and inspect installations.
Design amusement park functions with Programmable Logic Controllers.
President: Jan 2007 - October 2007; Apex Contractors Inc, Self Employed: Designed and obtained permits for townhouse project.
I was the architect and professional engineer, signed and sealed all drawings.
Pulled all permits. To do this required dealing with multiple management and regulatory issues.
Specified and purchased all materials to complete job and managed all construction activities.
Performed all drawing changes and municipality communications.
Electrician: did all wiring, high voltage, low voltage (cable, phone, LAN) and exterior yard and garden lighting.
Completed townhouse with two units. Sold one unit before mortgage industry collapsed.
Senior Electrical Engineer: March 2005 – Jan 2007; Heartware Corporation, Miramar, Fl. Position in a research group developing a controller for an artificial heart.
Embedded design using a Texas Instruments TMS320F2812 DSP to drive a brushless DC motor. Software written in C using TI Code Composer Studio. Controlled 2 BLDC motors, used in the pump, running at 35,000 rpm.
Operating system DSP/BIOS and original. Designed PC board using Altium.
RF communications to control motor speed; provide alarms and patient information.
Electrical Engineer: April 2002 - February 2005; DME Corporation, Ft Lauderdale, Fl. Position in a product design group developing new products, manufacturing support for existing products (Airport runway lighting systems, emergency radio beacons, digital indicator systems).
Reengineered a runway strobe lighting system to solve a major reliability problem due to back EMF during switching.
Designed a replacement MALSR system for their aging system using Atmel uP ATMEGA128.
Designed and put into manufacturing a Digital Altimeter System used by air traffic controllers for altimeter corrections. Atmel uP ATMEGA16 used SPI, IIC and multiple RS232 buses for communication. Software written in C using Imagecraft compiler and AVR Studio for emulation.
Designed a new LED based Exit sign with photosensor
767 Reading Light design: switching power supply to drive Lumiled high power 5 Watt LED’s.
Designed a new LED based taxiway light that uses the existing current control loop on the airfield.
General Contractor/ Engineer: February 2002 - August 2003; Designed and obtained permits for my 7300 sq. ft. home.
I was the architect and professional engineer, signed and sealed all drawings.
Pulled all permits. To do this required dealing with multiple management and regulatory issues.
Specified and purchased all materials to complete job and managed all construction activities.
Performed all drawing changes and municipality communications.
Electrician: did all wiring, high voltage, low voltage (cable, phone, LAN) and exterior yard and garden lighting.
Completed home August 2003 while working full time split shifts (prearranged agreement) for DME Corporation above.
Sold home Sept 2005 as planned.
Staff Engineer: April 2001 - February 2002; Concord Camera, Hollywood, Fl. Engineering position in a product design group developing digital cameras.
Switching power supply design for CCD based camera using OrCad board design tool.
Part of a team that used Visual Basic Software to transmit images wirelessly from a digital camera using Bluetooth.
Electronics Engineer: January 1998 - April 2001; Motorola, Ft Lauderdale, Fl. Position in a R&D group designing new products to be manufactured in 0-2yrs.
Four patent submissions within 24 months: 2 Patents granted for Piezo Switch Design. Protel 99 PC Board design. Mathworks design tool.
Design of a prototype cellular radio utilizing alternative user interfaces. Motorola 68HC11 assembly language programming. Complete circuit design through programming and prototype build. Mentor graphics schematic design. FPGA design, IAR Workbench. Programming IIC, SPI, UART, PWM.
Fuel Cell Development: Designed a control system for a prototype miniature hydrogen fuel cell to power a cell phone. Presented prototype with team to former CEO Bob Galvin, father of current CEO Chris Galvin.
Presented a working prototype of fingerprint scanning technology and alternative user interfaces at Motorola’s internal technology review to Chris Galvin and senior technical staff.
Blackbelt training, completed all classes but did not complete all projects before layoff. JMP software- solves statistical models and problems using this tool.
Contract Electronics Engineer: July 1996 - December 1997; Johnson & Johnson Medical, (Contracting through System One), Tampa Fl. Original equipment manufacturer of medical electronics (patient monitoring systems).
Switching power supply design to drive the interface ports. From circuit design and board layout to manufacturing feasibility through testing, documentation and integration. Power supply design meets UL601-1.
Embedded design (Video): C programming for VGA flat panel display controller (Chips & Technologies 65535).
Resolved vendor problems: flat panel color display, primary switching power supply and switch quality control.
Wrote software comments for PIC16C74, written in assembly language.
Senior Electronics Engineer: February - July 1996; Scandia Technologies, Inc., Clearwater, FL.
Original equipment manufacturer/integrator of a broad range of automated industrial machines.
Electrical design of thirty station automated rocker arm assembly machine; specified and developed all instrumentation on machine including: gauging, pressure, vacuum, and flow (Dimensions of machine 40’L X 10’H X 10’w). Implemented interface to programmable logic controller.
Redesign pick and place machine utilizing 8051 microcontroller, test fixture design, software (Basic and C).
Rewrote PLC program for milling machine.
Job History from July 1984 – January 1996 is various positions within General Electric which than became Lockheed Martin. This is continuous employment with one employer. I have broken this period of time into individual jobs to show my experience with each position. This was DOD secret clearance from 1984 -1986 and DOE Q clearance from 1986 – 1996 in a DOE plant run by GE than Lockheed Martin.
Senior Instrumentation Engineer: April 1991 - January 1996; Martin Marietta (formerly GE), Largo, FL
Supervise equipment service group (seven senior technicians), providing troubleshooting, repair and maintenance to nuclear weapons component manufacturing and test equipment (over one-half of the 700,000 sq. ft. facility).
Provide hardware support to all 1200 IBM compatible personal computers in the facility.
Redesign, modify or replace process and test equipment.
Provide technical support and consultation for entire electrical system in the plant, including 13KV switchgear, (4) 200KVa UPS systems, transfer switches and 400-700KVa Generators.
Manage entire group of 25 personnel during managers’ absence.
Advanced Equipment Engineer: May 1989 - April 1991; General Electric Neutron Devices, Largo, FL
Designed and programmed specialized electronic process and test equipment, utilizing PC and PLC controllers.
Drafted supporting documentation: schematics, mechanical drawings, operating procedures, software documentation and calibration procedures utilizing Spice, Autocad, Lotus 1-2-3, Works.
Designed product testers: optoelectronics, clock/resonator (30 Mhz range) and high voltage capacitors.
Advanced Instrumentation Engineer: March 1986 - May 1989; General Electric Neutron Devices, Largo, FL
Designed, modified and performed calibration for new process equipment. Drafted calibration procedures.
Procured new test and control equipment, when necessary, to perform these calibrations.
Analyzed equipment performance data and established calibration/service intervals and replacement schedules.
Quality Assurance Engineer: July 1984 - March 1986; General Electric Ordnance Systems, Pittsfield, MA.
Redesigned existing test and inspection clean room facility for new Trident II nuclear submarine electro-optical equipment. Designed and implemented Production Test and Inspection Plan for this new equipment.
Analyzed performance and quality data from test equipment/production hardware to initiate design changes.
In a one year period, I had written and implemented three cost improvements, saving the company $66,000.
Electronics Engineer: June 1983 - June 1984; Brad Cable Electronics, Schenectady, NY.
Designed, built and tested digital circuit boards (microprocessor based descramblers for cable television converters).
Troubleshot and repaired test equipment including oscilloscopes, sweep and signal generators.
Troubleshot and repaired cable television converters mostly Oak and Jerrold including VCO, mixers, power supplies and digital descamblers.
EDUCATION AND TRAINING:
MSEE, May 1988, University of Massachusetts, GPA 3.1/4.0, while employed full time.
BSEE, June 1984, Union College, GPA 3.0/4.0.
Regents Diploma, June 1979, Mont Pleasant High School, GPA 3.1/4.0.
Computer programming languages: Assembly, Basic, C, C++, Fortran, Pascal, Visual Basic (Beginner).
ACCOMPLISHMENTS:
Professional Engineer (PE) license, State of Florida, April, 1993; State of Texas August, 2012.
Electrical Contractor license, State of Florida, 2007.
Passed Florida State General Contractor’s Exam, October 2002.
Real Estate License, State of Florida, July 2013.
National Council of Examiners for Engineering and Surveying (NCEES) record. Contains verified employment, education