**** ******* *** ** *******, TX *****
***********@*****.***
Jaime H. Cienfuegos
OBJECTIVE
SUMMARY
To obtain a Designer position in Control Systems/Electrical with a strong, forward thinking, progressive company that will allow me to fully utilize my experience, present knowledge, and skills and also to acquire a higher level of expertise.
Over 14 years of experience working as a Control Systems & Electrical Designer/Drafter in the office, as well as Technician in the field. Experience with several 3D modeling computer programs which consist of using Smart Plant Review, PDMS Model Review, PDMS, Microstation V8 XM Edition / Intergraph, Autodesk Navisworks Freedom 2012 and AutoCAD Electrical. Experience on a variety of Projects which include: Chemical Plants, Gas Plants, Oil Refineries, Compressor Stations, Pump Stations, Process Modules, Loading Racks and Storage Tank Facilities. Instrument Location Plan Layout experience working with equipment such as towers, air coolers, exchangers, skids, compressors, pumps, tanks, modular structures and pipe racks. Layout and Design Process Modules and structures to client and industry standards. Experience of Instrument Cable Tray Layout. Experience on Cable Fill Penetration using Roxtec Transit Manager Software.
EXPERIENCE
2015 ConocoPhillips Houston, TX
ConocoPhillips
Eagle Ford Project
September 2014-Present
I&E DESIGNER
Use of computer programs on a daily basis which consist of using AutoCAD 2013.
Updating Central Facilities Sites, base and new facilities for all Eagle Ford Projects.
Create & Issue Work Pack Consisting of Updating Plans, Cable Schedule, Detail Drawings.
Cable Tray Layout for per Client Standards.
Updating Grounding Plans, Area Classification Plans, Grounding Plans Instrument Location Plans, Trenching Plans.
2014 Audubon Engineering Houston, TX
Enterprise
Morgan’s Point-DCS Upgrade Project
July 2014-September 2014
CONTROL SYSTEMS DESIGNER
Use of computer programs on a daily basis which consist of using AutoCAD 2013.
Cable Tray Layout for DCS Upgrade per Client Standards.
Fiber Optic Cable Schedule.
Communication & Control for Fiber Routing.
RIE Layout’s & Power Plan.
Request Drawing Numbers from Client.
Request Equipment Numbers, Request Existing Drawings from Client,
2012-2014 Jacobs Engineering Houston, TX
DuPont
DuPont Altamira, Mexico Line 2 Expansion Project
October 2012-June 2014
CONTROL SYSTEMS DESIGNER
Use of computer programs on a daily basis which consist of using SmartPlant Instrumentation-Intools, PDMS Model Review Aveva,& Microstation V8 XM Edition.
Responsible for Finishing Area, Cooling Tower, Filtration, Settling, Drying, Sizing, Packing, Warehouse, & Wet Treatment Area.
Developing a detailed scope of work details for I&E design packages.
Accountability included prepare and involved for Client Model Reviews in Design Area by assuring all our Instruments were in correct location per P&ID’s, and Instrument Piping Specifications Client Standards developing a detailed scope of work details for I&E design packages. Also meet Upstream/Downstream Requirements for Flow Elements.
Review Instrument Datasheets to be appropriate per P&ID’s size, Instrument Tag, Manufacturer Model No., Line No., Instrument Type, Integral or Remote.
Communicate with our Mumbai counter parts to assure our area was ready for CMR & make necessary preparations.
Involved in 70% & 100% document review with Client which included providing latest P&ID’s, BFI Term Drawings, Rack Loading Drawings, Analog & Digital Schematic Drawings, Location Layouts, Instrument Data Sheets & Interconnections Drawings, Installation Details, & DuPont’s Project Supplement Report (PSR).
Work closely with Engineer to design system Block Diagram which included Cabinet Arrangement Honeywell DCS I/O Experion C300, Network Cabinet Layout.
Responsible for Completion of Finishing/Wet Treatment 70% Bucket List & 100% Bucket List for Instrumentation & review with Client for approval and Issued For Construction (IFC) on documents for my Area.
2012 Belcan Corporation Baytown, TX
Bayer
Bayer Business and Technology Services
June 2012- September 2012
CONTROL SYSTEMS DESIGNER
Responsible for developing a detailed scope of work details for I&E design packages.
Accountable for project implementation which includes field inspection, problem solving, and coordination Provides start-up assistance.
Prepare clear, accurate plans and detailed drawings from rough sketches, according to Project Standards.
Responsible for developing spare parts list for new I&E equipment associated with projects. Microstation / Intergraph.
Creating a Disipline Index Record (DIR) Package that consists of Project No., Construction Scope, Specification Sheets, Installation Details, Standard Details,
Demo Drawings, Reference Drawings, Loop Drawings, and Wiring Diagrams for Junction Boxes, Instrument Location Plans, and P&ID’s Drawings.
2011-2012 CB & I Engineering Houston, TX
Cartagena Refinery
Expansion Project
May 2011-June 2012
I&E DESIGNER
Prepare clear, accurate plans and detailed drawings from rough sketches, according to Project Standards.
Manually skilled in use of all appropriate drafting tools & proficient in use of AutoCAD Electrical.
Electrical/Instrument Location Plan Drawings inserting instruments in proper location according to P&ID’s, PDS,Smart Plant Review Model, SPI Extract, and check locations by using Model Review to pinpoint Transmitters, Valves, Instrument Junction Boxes, and Valve Control Boxes.
Responsible for updating and maintaining Instrument Cable Schedule.
Create Cable Fill Penetration using Roxtec Transit Manager Software.
Responsible for adding UPS Power, Signal for Instruments on Location Plans.
Create Cable Tray Layout & Detail.
Create Cable Fill for Conduit Layout & Detail.
General Arrangement Drawings, Installation and Mounting Detail Drawings, Bill Of Material, and Cable Schedule.
Create Fiber Optic Layout Plan for Substations using existing Equipment layouts, and Cable Tray Drawings.
2008-2010 Fluor Engineering Sugarland, TX
Odoptu NWS FSP - Russia
Exxon Neftgas Limited
April 2008-May 2010
CONTROL SYSTEMS DESIGNER / DRAFTER
Prepare clear, accurate plans and detailed drawings from rough sketches, according to specified dimensions.
Manually skilled in use of all appropriate drafting tools & proficient in use of AutoCAD Electrical.
Instrument Location Plan Drawings inserting instruments in proper location according to P&ID’s, PDMS model, SPI Extract, and check locations by using Model Review to pinpoint Transmitters, Valves, Instrument Junction Boxes, and Valve Control Boxes.
Create Cable Fill Penetration using Roxtec Transit Manager Software.
Create Instrument Cable Tray Layout & Detail.
Worked with Enterprise Integrated Communication System group on General Arrangement Drawings, Installation and Mounting Detail Drawings and Cable Schedule for CCTV systems.
2007-2008 Hagemeyer North America Pasadena, TX
FIRE PROTECTION TECHNICIAN
Annual Inspection, Testing, and Maintenance of Fire Protection Equipment for Exxon Mobil in Baytown, TX for both Refinery & Chemical sites.
Inspection and Maintenance of Fire Alarm Systems
Fabricate Pipe for Various Systems
Analyze Isometric Drawings for Sprinkler Systems which included adequate coverage provided for area.
Develop Plans for Fire Protection Equipment
Visited various jobsites and Communicated with Clients on Issues Regarding Estimates.
Responsible for Installation of New Sprinkler Systems
Coordinated Schedules for Installations with Clients
Demo Old Sprinkler Systems
Troubleshooting and doing repairs as needed on Fire Protection Systems
2003-2007 Webb Murray & Associates Pasadena, TX
FIRE PROTECTION TECHNICIAN
Responsible for Annual Inspections, Testing, and Maintenance of Fire Protection Equipment for Celanese Refinery in Clear Lake, TX.
Responsible for Prompt and Effective Maintenance of Fire Alarm Systems, Deluge Systems, Fire Hydrants, Fire Monitors, and Post Indicator Valves.
Responsible for Annual Inspection Reports for Various Fire Protection Systems.
Inspection and Maintenance of Fire Alarm Systems
Troubleshooting and doing repairs as needed on Fire Protection Systems
1998-2003 Austin Industrials Baytown, TX
ELECTRICAL APPRENTICE
Electrical Project Maintenance: This included performing electrical work for projects that needed to be completed in a timely manner.
Installation of Electrical Panels, Conduit, Installing Cable Tray, Pulling Wire, and Termination.
Installation of Transformers
Installation of Disconnects, Start and Stop Switches for Motors in the Industrial Field.
Demo of Electrical Equipment
EDUCATION
2011 San Jacinto College Pasadena, TX
PDMS Design
PLC Programing Certificate
2004-2010 Lee College Baytown,TX
3-D AutoCAD Electrical 2010
Current State Fire Alarm License
Certificate in Computer-Aided Drafting & Design
Completed Technical Drafting
Basic Computer-Aided Drafting
Intermediate Computer Aided-Drafting
Drafting & Design Courses Auto-CAD 2007
Completed Several Electrical Courses
Modern Residential Wiring
Fundamentals of Electricity AC/DC
National Electrical Code Course 1999
Bilingual (Spanish)
2008 Fluor Control System Design School Sugarland, TX
Basic Electricity- AC/DC
Basic Electricity- Voltage Drop Calc.
Grounding
Conduit and Conduit Fill
Cable Tray and Tray Fill
Area Classification
P&ID Symbology
In tools- Introduction and Overview
Design Deliverables Overview
Design Activities- P&ID’s /Location Plans
Design Activities- Wiring Systems
Design Activities- Installation Details
PDMS Overview Aveva Review Version 6.3
1995 Gladys Porter High School Graduate Brownsville, TX
References Available Upon Request
.