Hanumant D. Madane
Mobile: +91-976*******/+965-******** E-mail: **********@*****.***
B.Sc (Information Technology), M.Tech (System Engineering)
PROFESSIONAL PROFILE
Presently Working with Wipro Infotech as Sr. SI Engineer having total of 4 years 11 months of experience.
Designing end to end infrastructure monitoring solutions using HP BTO suite.
Requirement gathering from the stake holders of the IT infrastructure
Presently working on HP BTO suite, a Network, Server, and application monitoring product by Hewlet-Packard.
Worked on HP Site Scope 11.2x, HP BSM/Omi 9.2x, a server monitoring product by Hewlet-Packard.
Worked on HP Network Node Manager 9.2x and HP OVPI, a Network fault and performance reporting product by Hewlet-Packard.
Worked on HP BPM 9.2x, RUM 9.2x, and Vugen, an application monitoring product by Hewlet-Packard.
Worked on HP SHR 9.40 a reporting tool by Hewlet-Packard.
Worked on IBM Tivoli Network Manager 4.1, a network monitoring product by IBM
Worked on (Vista Foundation 4.3 Architecture), a Network Performance Reporting product by InfoVista.
Worked on Vegayan Sim PLuS, a network fault and performance monitoring product by Vegayan.
Willing to work in a challenging Environment.
An effective communicator with exceptional relationship management skills.
CAREER OBJECTIVE
To work for an organization that gives me ample scope to apply my knowledge and nurture my skills thus helping me to become a successful professional and a valuable asset for the organization.
WORK EXPERIENCE
Working as Sr. SI Engineer in Wipro Infotech
Wipro Infotech Ltd, India Dept- SIMS
1. Project: KNPC (Kuwait)
Project duration: Sep 2015 till now.
Client: Kuwait National Petroleum Company.
The project involves creation of five end-to-end business services using HP tools including HP OMi, HP NNMi, HP BSM(BPM), HP uCMDB, HP SHR. The services monitoring will help KNPC to identify the problematic component and bottleneck in the IT infrastructure of the KNPC and resolve it before it occurs.
Role: Upgrade existing HP tools to the recent versions and modelling of the business services in HP OMi
Responsibilities:
Data gathering from the client for business service related data.
Installation of HP OMi, HP SHR, HP BSM connector.
Event Integration between HP NNMi and Omi using BSM connector.
VuGen script development for synthetic application monitoring of the critical applications of KNPC in BPM.
HP uCMDB integration with Omi for CI’s push into Omi RTSM for creation of the business services.
Modelling of the business services in Omi RTSM which includes CI’s such as servers, Network devices and business transactions from BPM
HP SHR integration with Omi RTSM for a topology data source and event reports.
HP SHR integration with NNMi NPS for reporting of the network devices.
Configuring SHR reports for the Oracle DB, MS SQL DB, Active directory and MS Exchange.
2.Project: Dubai Airport (UAE)
Project duration: June 2015 to Aug 2015
Client: Dubai Airport, Dubai.
The project includes implementation of HP tools including HP OMu, HP SiteScope, HP SHR, HP NNMi, for fault and performance management of IT infrastructure of Dubai Airport.
Role: Installing SiteScope and SHR with high availability. Configuration and integrations including end user training and documentation.
Responsibilities:
Installation of HP SiteScope, HP SHR on a new servers
Integration of HP OMu, HP NNMi, with HP SHR for reporting of servers and network devices.
Configuring SHR reports for the Oracle DB reports, MS SQL DB reports, Active directory reports and MS Exchange reports
Configuring SiteScope for agentless server monitoring and creating alerts based on thresholds.
Configuring critical URL’s (website monitoring) of Dubai Airports into SiteScope
Applying patches on SiteScope and SHR servers.
Admin/End user training to the operations team
3.Project: ADNOC (Abu Dhabi, UAE)
Project duration: July 2015
Client: Abu Dhabi National Oil Company, Abu Dhabi
The project includes implementation of HP SiteScope For monitoring of the servers and databases in the ADNOC’s IT infrastructure
Role: Installing SiteScope, configuration and solution template deployment including end user training, documentation and UAT
Responsibilities:
Installation and configuration of the monitors of HP SiteScope.
Deployment of solution template for Oracle and MS SQL for standard database parameter monitoring.
Configuring SiteScope for agentless server monitoring and creating alerts based on thresholds.
Configuring URL’s of the critical applications in ADNOC for availability monitoring.
Admin/End user training to the operations team and handover
User Acceptance Test and sign-off.
4.Project: Al Tayer Group ( Dubai, UAE)
Project duration: January 2015 to June 2015
Client: Al Tayer Group, Dubai.
The project includes up-gradation of HP tools including HP BSM/Omi, HP SiteScope, HP BPM, HP SHR, HP NNMi, HP OMw and integration of existing OMW, NNMi with new BSM/Omi for event management.
Role: Installing new BSM/Omi, HP SiteScope, HP SHR and integrating with the existing OMw, NNMi,, BPM for event management and reporting. Applying patches on the OMw, NNMi, BPM. Developing custom dashboards in BSM as per customers requirement
Responsibilities:
Installation of HP BSM/Omi, HP SiteScope, HP SHR on a new servers as a part of up-gradation.
Integration of existing HP OMw, HP NNMi, HP BPM with HP BSM/Omi for event management.
Integration of HP BSM, SiteScope, HP NNMi NPS with SHR with HP SHR for reporting.
Creating event notifications in BSM/Omi for critical events received from OMw, NNMi, SiteScope, BPM
Applying patches on HP OMw, HP NNMi
Developing custom dashboards as per customer’s requirement
Admin/End user training to the operations team
5.Project: IBM Asset management suite
Project duration: July 2014- Jan 2014
Client: Tata Communications Limited
IBM Asset management at TCL includes the IBM Tivoli suite of product for asset management of Tata communications LTD. Project includes IBM Smart Cloud Control Desk, IBM ITNM, IBM End point manager, IBM Software Usage Analysis and IBM Tivoli Common Reporting. Project objective is to discover the assets like servers, workstations, network devices of TCL, manage the asset lifecycle using SCCD
Role: Involved in implementation of IBM Tivoli Network Manager 4.1 and integration with IBM SCCD for asset management and handling product documentation and customer training.
Responsibilities:
Conducting Requirement gathering sessions with customer
Designing HLD and LLD for IBM ITNM and IBM TCR
Implementation of IBM ITNM 4.x and TCR 2.1.1 and integration between the ITNM and SCCD and TCR.
Customization for creating new classes for network devices.
New Agent development in Perl for discovering the attributes like serial number, make/model from non-core network devices like tape library, SAN Storage, Printers, etc.
Participate in Daily and weekly status review call with customer and update on the progress.
Preparing Admin document and User Guide documents
Conduct User Acceptance Test
End User training on the implemented tools
Application/server Handover to the operations team
6. Project: Gujarat Commercial tax Department EMS implementation
Project duration: Mar 2014- June 2014.
Client: Gujarat Commercial tax Department
The project includes implementation of HP Operations Manager(Windows), HP SiteScope, HP BPM, HP SHR, HP NNMi, HP SM and integration between these tools for Fault and performance management of the CTD infrastructure.
Role: Involved in designing high level design document and low level design document for HP BTO Suite which includes HP SiteScope, HP NNMi-iSPI QoS, performance for metrics, HP Service Health Reporter, HP Operations Manager Windows.
Responsibilities:
Designing HLD and LLD for HP Operations Manager, HP SiteScope, HP NNMi, HP SHR for infrastructure monitoring.
Implemented HP SiteScope and integration done between SiteScope and HP OM for event management in HP OMW.
Installation and configuration of HP SHR for server performance monitoring using HP operations agent.
7.Project: Dena Bank HP Tools up-gradation
Project duration: Feb 2014- April 2014
Client: Dena Bank
Project includes the HP EMS tools up-gradation where HP OMW, HP NNMi, HP Service Manager, HP Service Health Reporter, HP OVPI are upgraded to the latest versions. Monitoring of Dena Bank infrastructure for fault and performance management using HP NNMi, HP OMW and integrating the same with HP Service manager for auto ticket logging. Report generation using HP OpenView performance insight(OVPI).
Role: Involved in designing HP OVPI low level design document and end to end implementation of HP OVPI till handover to the operations team.
Responsibilities:
Installation and configuration of HP OVPI and integration with HP NNMi for discovering and monitoring the performance of network devices at Dena bank
Installation and configuration of HP Service Health Reporter for server performance monitoring at Dena Bank.
Preparing Admin document and User Guide documents
Conduct End User training and application handover
Taking HP OVPI sign-off from the customer
8.Project: Vodafone Service Assurance Implementation
Project duration: Feb 2014- April 2014
Client: Vodafone India ltd.
InfoVista Implementation in Vodafone India for performance management of Vodafone’s IP network for different types of network device vendors. Vodafone monitors the performance of network links using the InfoVista performance management solution and provides the reports to it’s enterprise customers. Project involves the L1, L2 level support to the InfoVista application and implementing new change requests from Vodafone
Role: Involved in L1 and L2 support to InfoVista application and developing new change requests from customers
Responsibilities:
Development of new reports in InfoVista based on Change requests and customers requirement
Discovery of MPLS/CPE network devices for performance management of various network devices for performance management.
Provisioning the discovered devices into VistaMart for polling at predefined interval.
Managing and supporting InfoVista components
Creating workflow for automation various tasks.
9.Project: DCB Bank POC(Proof of Concept)
Project duration: Sep, 2013 - Oct, 2013
Client: DCB Bank
POC set up of HP BSM suite in DCB bank for demonstrating end to end event management solution for monitoring the DCB bank’s IT environment such as servers, routers, switches, database, applications and leverage the HP BSM/Omi for centralized event management console
Role: Involved in end to implementation of HP BTO Suite including HP SiteScope, HP BSM/Omi, HP NNMi, HP BPM, HP Diagnostics and demonstration of working models of the tools and integrations achieved for fault and performance monitoring of DCB infrastructure.
Responsibilities:
Installation and Integration of HP BSM suite which includes below products:
HP BSM/OMi 9.20
HP SiteScope 11.20
HP NNMi 9.20
HP NNMi iSPI 9.20
HP Diagnostics 9.20
Demonstration of implemented tools for Fault and performance management of servers, network and applications in DCB environment.
10.Project: SADARA, Saudi Arabia(offshore)
Project duration: May 2013 - Sep 2013
Client: SADARA
The project includes implementation of HP BSM/OMi, HP SiteScope, HP BPM, HP NNMi and integration of multiple third party tools with HP BSM/OMi for event management and event correlation. Integration of HP BSM and HP Service manager for trouble ticketing.
Role: Involved in requirement gathering for monitoring of Servers, network, URL and database monitoring at SADARA.
Responsibilities:
Designing HLD and LLD for EMS tools mentioned above for infrastructure monitoring.
Demonstration of working modules of the EMS solution to the customer
Implementation of HP BSM/OMi 9.2x,HP BPM 9.x, HP NNMi 9.2x, HP SiteScope 11.2x and integration between these tools for event management in HP BSM/Omi(Implemented the solution in Wipro COE lab)
Conducting Requirement gathering sessions with customer and Wipro internal team for understanding third party EMS systems for integration with HP BSM/OMi and finalizing the communication interface for integration.
Conducting Requirement gathering sessions for understanding customers network for fault and performance management of network devices through HP NNMi
11.Project: Vodafone Service Assurance Implementation
Project duration: JUNE 2011- May 2013
Client: Vodafone India ltd.
The Project includes implementation of HP BSM with HP SiteScope and HP BPM, Integration with HP TeMIP for alarm enrichment. Automated trouble ticketing with HP SM via HP BSM for SiteScope monitors.
Program management of Vegayan SiMPLuS CPE Management application Implementing Fault management, performance management and configuration management solution for CPE devices of the Vodafone’s customers with the help of SiMPLuS CPE application.
InfoVista Implementation in Vodafone India for performance management of Vodafone’s IP network for different types of network device vendors.
Role: Involved in implementation of service assurance tools from vendor HP, Vegayan, InfoVista.
Responsibilities:
Designing HLD and LLD for EMS tools mentioned above for infrastructure monitoring
Implementation and integration of HP BSM, HP SiteScope, HP BPM
Giving UAT to the customer and support team
Providing training to L1 support team of HP SiteScope and BSM
Post installation support to HP BSM, HP SiteScope, HP BPM
Providing L2 support of HP BSM and HP SiteScope, HP BPM application.
Participating in requirement gathering sessions for SiMPLuS CPE application.
Designing integration with OSM system for automatic discovery of the CPE devices in SiMPLuS, using XML interface between SiMPLuS and OSM application.
Providing L2 support for SiMPLuS CPE application including discovery and troubleshooting of CPE devices in SiMPLuS for monitoring.
Giving UAT for Fault, performance and configuration management modules of SiMPLuS CPE management tool.
Training to L1 support team of SiMPLuS CPE management application.
Training to End user in Vodafone NOC.
Final Sign-off from the customer
Discovery of MPLS/CPE network devices for performance management of various network devices for performance management.
Provisioning the discovered devices into VistaMart for polling at predefined interval.
Managing and supporting InfoVista components
Creating workflow in Vista Cockpit for automating various tasks in InfoVista.
12.Project: LIC E-FEAP EMS Implementation
Project duration: January 2011- May 2011
Client: Life Insurance Corporation
The project includes implementation of HP BAC, HP SiteScope for server monitoring, and HP CAE for Application patch deployment on servers in the environment. HP NNM for network monitoring of LIC and integration of HP BAC and HP NNM with HP Service manager.
Role: Involved in adding new monitors to the HP SiteScope as per customers requirement, troubleshooting issues in implementation.
Responsibilities:
Installation, configuration and integration of HP SiteScope and HP BAC
Configuration of Monitors in SiteScope for monitoring various parameters and creating alert for the monitors in HP BAC
Configuring HP CAE as per requirement and Installation of HP CAE agent on RHEL servers
Training to the end user on HP SiteScope, HP BAC, HP CAE
Training to End user for patch deployment on RHEL server
ACADEMIC CREDENTIALS
BOARD / EXAMINATION
SCHOOL / COLLEGE
CGPA/ PERCENTAGE
YEAR OF PASSING
M.Tech(System Engineering)
Birla Institute of Technology and Science, Pilani
6.19
2014
B.Sc.(IT)
B.N. Bandodkar College of Science, Thane
65.16%
2010
Higher Secondary
(HSC)
Mumbai University
66.67%
2007
WORKSHOP ATTENDED
Wipro Initial Training Program (ITP) – Technical training including: Unix, Oracle, HP OV suite
5 days Advance CCNA training
5 days InfoVista Performance management solution admin training
3 days HP Cloud Service Automation training
5 days HP Server Automation Virtual Training
5 days HP Diagnostics Virtual training
1 day IBM SCCD Installation training
SPECIAL INTEREST AND ACHIEVEMENTS
Received customer appreciation for HP SiteScope/BSM L2 support given in Vodafone India.
Received a customer appreciation from Vodafone India LTD for executing Vegayan and InfoVista application support during MPLS migration activity.
Received feather in my cap by Managers at Vodafone India ltd for outstanding contribution to the InfoVista support project.
Sharing Knowledge within the team.
PERSONAL DETAILS
Date of birth: 24TH January 1989.
Address(India): Sai Maui APT. Room No. 104, Ramchandra Nagar No.3, Vaitiwadi, Thane(west)-400604
Languages Known: English, Hindi and Marathi.
Date:
Place: (Signature)