TRAVIS TODD
Superintendent
Batson and cook( **** present)
Benning Construction (2011-2013)
Two 6000 SQ FT retail spaces in Evans GA.
Dental school addition to savannah state tech. Remodel and new addition total price about 5mil.
25000 SQ FT new library in Cumming GA. Conc. Retaining wall and structural steel brick veneer total price 7mil.
Juneau construction(2007-2010)
Gainesville college renovation and new addition
15000sf remodel of existing bldg and 25000 sf of new addition student center and new kitchen, total price 15mil
Go fish aquarium
7mill dollar demonstration ponds and aquariums in perry ga.various underground piping and filter systems along with three fishing ponds.
Gilbane Construction Company (2006-2007)
West Forsyth High School
This project is a 2-story high school with 291,000 square ft with 12 science labs and various consumer science labs. The total project value with ball fields is approximately 50 MM. Scheduled completion is May 2007.
R J Griffin Construction Company (2001-2006)
The Viridian, Nashville, TN 2006-2006 Superintendent
This project consisted of 315 new Residential Units totaling 330,000 sq ft. The structure is 31 stories with 10 levels of parking below with 222,000 square feet of parking deck. Total project value of $50MM. Scheduled Completion late August 2006
ATLANTIC STATION TWELVE, Atlanta, GA 2003-2005 Superintendent
A $62mm project added more than 404 new Residential Units totaling 500,000 sq ft. with 101 Hotel units totaling 100,00sq ft to the Atlantic Station Community. The structure is 30 stories with 3 levels of parking below with 235,000 square. On top of the garage is featured a Grand ballroom and a pool. . Total project value of $60MM.(This job received the largest early completion bonus in the history of R J Griffin.
White Columns Country Club (2002-2003)
This job consisted of approximately 50,000 sq ft. at a cost of approximately 2 MM.It includes a men’s locker room and garage for golf carts.
The Metropolis 933 Peachtree Street (2001-2002) Field Engineer
This building had a 6 story parking deck poured in place of about 300,000 sq ft. with two 15 story condo towers on top with approximately 375.000 sq ft. each. Total cost 60 MM.
Brasfield & Gorrie (1996-2001) Field Engineer
Peachtree United Methodist Church (1999-2001)
This was a 30,000 sq ft. addition with limestone exterior and a 1 MM Organ. The total cost was 25 MM.
North Park parking deck and office tower (1997-1999)
This job consisted of a 9 story parking deck poured in place with 500,000 sq ft. and a 18 story office tower poured in place with 450,000 sq ft. this job topped out in 18 months at a cost of 60 MM.
Dekalb General Hospital (1996-1997)
This job, a 10 story office building poured in place with 250,000 sq ft and 4000 linear feet of curb and gutter. The total cost was 30 MM.
Beers Construction (1994-1996) Field Engineer
Georgia State Parking deck (1995-1996)
This 9 story precast parking deck with approximately 650,000 sq ft. with poured foundations and anchor bolts with a finished nursery at street level that consisted of 30.000 sq ft. Total cost 20 MM.
UPS building (1993-1994)
This job had four buildings with two 4 story office towers approximately 300,000 sq ft. each and two parking decks 200,000 sq ft. all were poured in place with precast skin. Total cost 75 MM.
Cell # 478-***-****
Home Phone # 706-***-****
***********@*****.*** Personal email address.
Education: High School
College: GA. State 2 Years
OSHA 10 and 30
CPR
Shoring and scaffolding and Trenching
Georgia soil and water level 1A
Leed Green Associate