LEAD ENGINEER
Amol Shriram Patil.
Flat No.*, PL5, B-8, Email :*******@*****.***
Sector 1,Khanda Colony, :**********@*****.*** New Panvel. Mobile :097********
Maharashtra. :093********
PROFESSIONAL SUMMARY
Education: BE (Civil)
Total Experience: 10 + Years
Software worked: Tekla structure(8 Yrs), SDS2(1 Yr), Auto Cad, Staad Pro, MS office, C Language, Micro station.
Experience:
Company
Year
Last Designation
Citec Engineering India Pvt. Ltd. Mumbai.
Jan 2012 to till date.
Lead Engineer.
Prothious Engineering Services, Nashik
April 2010 - Dec 2011.
Project Co-ordinator.
Creative Engineering Global Services, Mumbai
Jan 2007 - Mar 2010.
Sr. Project Engineer/ Checker.
Techflow Engineering India Pvt. Ltd, Mumbai.
Jan 2006 - Dec 2006.
X- Steel Modeler/ Project Engineer.
Prothious Engineering services, Nashik.
Jan 2005-Dec 2005
Jr. Steel Detailer.
Achievements:
FEED engineering experience for Oil & Gas project in UAE.
RCC & steel structure for oil and gas project.
In the oil and gas field for Borouge and Takreer did the FEED engineering project.
Involved in the Quotation and Estimating Man-hours (Excluding Costing) for the upcoming projects.
Responsible for execution of projects individually that includes study, project planning and resource allocation.
Independently handling the industrial, commercial, Engine power, Oil & gas projects.
Problem analyzing and solutions in Fabrication yard/site, Project take of meeting.
Well versed with AISC, ASD, LRFD, AWS, and OSHA Codes, BS Code.
Experience of handling a team of 9 to 10 detailers.
Projects:
Project : ZAPSIB-2 Ethylene Cracker Plant. Linde AG
Role: Chief Design engineer.
Start Date: 01/June/2015
Team Size: 8
End Date:
Periods in Months:
Located at Tobolak, Russian Federation. End client SIBUR.
Linde AG, Engineering Division in Munich/Germany has prepared FEED Engineering for Zapsib-2 project located in Tobolsk, Russian Federation. scope includes Detail Engineering activities for Civil & Steel structural design.
RCC structure includes Pile, Pile cap, super structure, Fire protection slab and equipment support arrangement of detail engineering.
Responsibilities/Contributions:
Coordination with design team. Preparation of Pile, Pile cap, super structure, Fire protection slab and equipment support arrangement drawing and modeling.
Technologies Used: Tekla Structuere 20.0, Auto Cad, MS office., staad pro. Tekla concrete.
Project : Aalborg Engineering. (Siemens Delimara Malta)
Role: Lead engineer.
Start Date: 01/February/2015
Team Size: 4
End Date: 30/April/2015
Periods in Months: 2
Aalborg Engineering is supplying customer with vertical heat recovery boiler, type Steam Gen8 with common feed water tank, pumps and pre heater located on one separate steel structure.
The boiler HRSG’s will be located side by side at Delimara Malta.
Scope of work is Boiler structure support arrangement, platform, emergency exit route, Chimney structure.
Responsibilities/Contributions:
Based on inputs of pipe loads provide the supporting arrangement. Responsible for all fabrication & erection drawing. Co- ordinate with other discipline.
Technologies Used: Tekla Structuere 20.0, Auto Cad, MS office.
Oil and Gas Projects –
Project : FRONT END ENGINEERING AND DESIGN STUDY FOR Mix C4s Export facility. (Borouge and Takreer), Abu Dhabi.
Role: Lead engineer.
Start Date: 01/November/2014
Team Size: 2
End Date: 31/Jan /2015
Periods in Months: 3
Mix C4 from ethylene plants can be exported. For exporting mix-C4s storage and export facilities need to be created. This would require installing storage sphere, anti-oxidant dosing skid, export pipeline and ship loading facility at Borouge Jetty.
Responsibilities/Contributions:
Review of existing information / facilities, site visits and data collection. Preparation of enquiry documents, supervision of geo-technical soil investigation. Carry out modelling/simulation and optimization studies.
Finalization of Plot plan, U/G drawing, Paving, foundation plans etc.
Technologies Used: Tekla Structuere 19.0, Auto Cad, MS office.
Project : Front End Engineering and Design(FEED) for PE3 revamp Project at Ruwais Borouge plant, Abu Dhabi.
Role: Lead engineer.
Start Date: 01/April/2014
Team Size: 3
End Date: 31/October/2014
Periods in Months: 7
The purpose of PE3 REVAMP, capacity to increase is to take care of excess ethylene that will be available after Borouge 3 comes online and to increase Polyolefin unit capacity.
Scope of civil, structural and Architectural work for PE3 REVAMP system includes-
New compressor Shelter and paving modifications.
New Palletizing Building and road modification.
Existing silo building modification for conveyors.
Conveyor Bridge.
Pipe rack structure.
Responsibilities/Contributions:
Colleting all existing data from client and as per requirement preparing enlarge detail drawing.
Site supervision for Geotechnical soil investigation(Bore Hole)
Co- ordinate with clients and site contractors.
For the client review, had prepared presentation.
Checked all the feasibility for the new and modified structure and suggest solutions.
Prepared all the documents for EPC contractors.
3d model for all the scope.
Finalization of Plot plan, U/G drawing, Paving, foundation plans etc.
Adequacy and feasibility check for Existing structure due to new equipment/piping loads.
Technologies Used: Tekla Structuere 19.0, Auto Cad, MS office, Navis.
Project : PETROSERV (QALCO)
Role: Lead engineer.
Start Date: 01/October/2013
Team Size: 2
End Date: 31/November/2013
Periods in Months: 2
The QALCO(Qatar Lubricants Company Ltd.) lubricants blending plant is the first of its kind in the State of Qatar, and is owned by Qatar Industrial Services Establishment (QIS).
Structure associated piping and steel structure. steel structure contains walkway, ladder & stairs, walkway is around the tanks and to access the tanks Ladders are provided. This structure is executed in Qatar. Weight - 16toones.
Responsibilities/Contributions:
Preparing the reports which contains fabrication information for members & Checking the shop drawing. Telephonic communication with client as per requirement.
Technologies Used: Tekla Structuere 19.0, Auto Cad, MS office, Microstation.
Project : VIRY FAYAT GROUP
Role: Lead engineer.
Start Date: 01/July/2013
Team Size: 15
End Date: Till Date
Periods in Months: 4
Canopy Structure includes miscellaneous members called as Blades, Parclose & Feuillures in Finish language/environment. Drawings for miscellaneous members are in table format. Parclose & Feuillures are the miscellaneous members which are use for fixing the glass sheet which covers entire roof area(Canopy). This structure is located in Finland.
Responsibilities/Contributions:
Preparing the reports which contains fabrication information for members & Checking the shop drawing. . Telephonic communication with client as per requirement.
Technologies Used: Tekla Structuere 18.0, Auto Cad, MS office.
Project : Alstom- Narva
Role: Sr. Design Engineer/ Project Coordinator.
Start Date: 01/March/2012
Team Size: 30
End Date: 31/June/2013
Periods in Months: 16
This is 2x300 MW power generation plant executed in Narva, Estonia. Primary fuel is oil shale. Size of plant is 89x60x71M.Total steel weight 7500 tone and 70000 drawings. Hours consumed for finalizing shop drawing are 75000Hrs. Input are only the .dgn files (600 files for piping, architectural, structural layout ), with reference of .dgn files and for all support arrangements we had done raw model. Then divide these structure in the different calculation group, import in stadd to check member size, then fix the the member sizes in tekla model and achieving the connections.
Responsibilities/Contributions:
Preparing the raw model and support arrangement with the help load points. Achieving connection & generate drawings. Raising the technical quires to client. Tracking all the data/mails/issues. Schedule the activities & required resources to complete task with in time. Telephonic communication with client as per requirement
Technologies Used: Tekla Structuere 17.0, MS office.
Project : Wartsila
Role: Project Coordinator / Checker.
Start Date: 1/January/2012
Team Size: 5
End Date: 31/ February/ 2012
Periods in Months: 2
Project Description:
Name of project is Quisqueya -2 and location is Dominican Republic.
This is 215kw power generating plant from Heavy Fuel oil. This structure includes different structures like Engine Hall, Stack, Utility Block, Radiator, work shop ware house and different types of shelters.
Responsibilities/Contributions:
Preparing the Model, achieving connection & generate drawings and raising the technical quires to client. Tracking all the data/mails/issues.
Technologies Used: Tekla Structuere17.0.
Project : Central Taxas Iron Work
Role: Project Coordinator / Checker.
Start Date: 1/January/2011
Team Size: 30
End Date: 31/ December/ 2011
Periods in Months: 12
Project Description:
This is industrial building which is of about 15000 tone. Inputs are design drawings & connections.
Responsibilities/Contributions:
Preparing the Model, achieving connection & generate drawings and raising the technical quires to client. Tracking all the data/mails/issues.
Technologies Used: Tekla Structuere17.0.
Project : Metasa
Role : Modeler & checker.
Start Date: 1/August/2010
Team Size : 8
End Date : 31/December/2010
Periods in Months: 4
Project Description:
These are refinery structure of Oil & Gas, Petrochemical, Steel, Mining, Infrastructure.
Some of structure are like extension of platform in oil well. for this type of structure we have to marked number of welds & no paint area for every elements which are connected on site. These structures are in Brazil.
Responsibilities/Contributions:
Preparing the Model, achieving connection & generate drawings and raising the technical quires to client. Tracking all the data/mails/issues. To help team members to solve incidents/defects, achieving good quality of drawing, deployment on right time. Monitored the project as technical lead.
Technologies Used: Tekla structure17.0.
Project : Brafer Brazilian companies
Role Modeler & checker.
Start Date: 1/April/2010
Team Size : 8
End Date : 31/July/2010
Periods in Months: 4
Project Description:
This is industrial shed building. This building contains Tie rods for roof structure, Trusses.
The structures is for Logistics building, comprised of vertical and horizontal trusses in Brazil.
Responsibilities/Contributions:
Preparing the Model, achieving connection & generate drawings and raising the technical quires to client. Tracking all the data/mails/issues.
Technologies Used: Tekla structure17.0.
Project : Aker Solutions
Role : Modeler & checker.
Start Date: 1/Nov/2006
Team Size: 6
End Date: 3/Dec/2007
Periods in Months: 12
Project Description:
Project name is TMT2 Drill Ship (Oil & gas) & weight is 900Tone.
This is drilling Rig Structure which is used for digging out the oil. Structure contains Checkered plate, ladder and handrails.
Responsibilities/Contributions:
Model is prepared with the help of Zen cad tool. achieving connection & generate drawings and raising the technical quires to client. Tracking all the data/mails/issues.
Technologies Used: Tekla structure17.0.
Project : Lynchburg Steel & Specialty Co
Role Modeler & checker.
Start Date: 1/Nov/2006
Team Size: 6
End Date: 3/Dec/2007
Periods in Months: 12
Project Description:
Industrial & commercial projects in Virginia.(U.S.)
Responsibilities/Contributions
Preparing the Model, achieving connection & generate drawings and raising the technical quires to client. Tracking all the data/mails/issues.
Technologies Used: Tekla structure12.0, Auto Cad.
Project : Cives steel company
Role : Modeler & checker.
Start Date: 1/Nov/2006
Team Size: 6
End Date: 3/Dec/2007
Periods in Months: 12
Project Description:
Commercial project Like hospital & school building in Lafayette, USA.
Responsibilities/Contributions:
Preparing the Model, achieving connection & generate drawings and raising the technical quires to client. Tracking all the data/mails/issues.
Technologies Used: Tekla structure12.0, Auto Cad.
Project : OPUS II Canada
Role : Modeler & checker.
Start Date: 1/September/2006
Team Size: 6
End Date: 31/Dec/2006
Periods in Months: 6
Project Description:
This is commercial building which includes canopy structure also and is of 1100 Tonnage
Responsibilities/Contributions:
Preparing the Model, achieving connection & generate drawings and raising the technical quires to client. Tracking all the data/mails/issues.
Technologies Used: Tekla structure 10.0.
Project : Cleveland Bridge & Engineering Middle East (Pvt) Ltd.
Role : Modeler & checker.
Start Date: 1/May/2006
Team Size: 8
End Date: 31/August/2006
Periods in Months: 10
Project Description: Hanger for Emirates(Airport) steel weight 2650 Tonnage. This structure contains huge truss. Main truss were detailed in 3 parts with actual pre cambering method. Due to huge size, details & numbering of connecting parts each truss assembly were required to be detail in 5-6 A1 size drawing. Air port Structure & located in Dubai.
Responsibilities/Contributions: Preparing the Model, achieving connection & generate drawings and raising the technical quires to client. Tracking all the data/mails/issues.
Technologies Used: Tekla structure10.0.
Project Burj Dubai Lake Hotel (Phase-I)
Role : Project Engineer.
Start Date: 1/January/2006
Team Size: 6
End Date: 31/April/2006
Periods in Months: 6
Project Description:
This is multi storey commercial building and is of 725 tons steel structure located in BURJ DUBAI(UAE).
Responsibilities/Contributions:
Preparing the Model, achieving connection & generate drawings and raising the technical quires to client. Tracking all the data/mails/issues.
Technologies Used: Tekla structure 10.0, Auto Cad.
Project : Central Taxas Iron Work
Role: Detailer
Start Date: 1/January/2005
Team Size: 30
End Date: 31/December/2005
Periods in Months: 11
Project Description:
This structure is research centre building and weight of steel structure is 12000 Tons.
Responsibilities/Contributions:
Detailing the Single part drawing, assembly Drawing, General arrangement drawing.
Technologies Used: SDS/2 Design Data.
Personal Information:
DOB : 14/09/1979
Marital Status : Married
Language : English, Hindi, Marathi
Passport No: G7282056
Date: Signature: Amol S. Patil.