Post Job Free
Sign in

Structural Engineer

Location:
Makati, NCR, Philippines
Posted:
November 06, 2015

Contact this candidate

Resume:

SALVADOR G. OLEIVAR

CIVIL / STRUCTURAL

PRC Registration No. 0090465

Address : **** ********** **. ***. ****, Manila

Cellphone No. : 091********

e-mail address : ************@*****.***

PRESENT POSITION : PROJECT STRUCTURAL ENGINEER

ACADEMIC ACHIEVEMENT:

Doctor of Civil Engineering (Structural)

De La Salle University

Taft Ave., Manila

1st Term, 2015-2016 (on going)

Master of Engineering (Structural)

Pamantasan ng Lungsod ng Maynila

Intramuros, Manila

March, 2015

Bachelor of Science in Civil Engineering

Technological Institute of the Philippines

Quiapo, Manila

March, 1997

WORK COMPANY EXPERIENCES:

Name and Address of Employer and Length of Service

1.D.M. Consunji, Inc. (7 Years & 8 Months, from Feb 2008 to Present)

2.Naigai Phils. Inc (1 Year & 1 Month, from Jan 2007 to Feb 2008)

PROJECTS HANDLED

1.Present Project : NAIA Expressway Phase 2 Project

Name and Address of the Owner : Vertex Development Tollways Corporation

Pasig City

Name and Address of the Engineer (Consultant) : J.F. Cancio & Associates

Indicate the features of project - (particulars of the project components and any other particular interest connected with the Project)

Construction of Elevated Expressway connecting Villamor Skyway SLEX Viaduct

Contract Amount expressed in US Dollars

(PHP 1=USD 41.408) : USD 238,375,262.00

Position : Project Structural Engineer

Structures for which the employee was responsible : Construction of Elevated

Expressway

Assignment Period : From March 2013 to Present

2.Name of Project : 1 x 135 MW Putting Bato CFB Power Plant

Name and Address of the Owner : Trans-Asia Oil & Energy Development Corporation

Name and Address of the Engineer (Consultant) : Not Applicable

Indicate the features of project (particulars of the

project components and any other particular interest connected with the Project)

Engineering, Procurement and Construction (EPC) for a 135 MW Circulating Fluid Bed (CFB) Coal Fired Power Plant in Phoenix Petro Terminals and Industrial Park, Calaca, Batangas

Contract Amount expressed in US Dollars

(PHP 1=USD 41.408) : USD 104,121,931.00

Position : Project Structural Engineer

Structures for which the employee was responsible :

Engineering, procurement and construction (EPC) for a 135 MW Circulating Fluid Bed (CFB) Coal Fired Power Plant in Phoenix Petro Terminals and Industrial Park, Calaca, Batangas

Assignment Period : from Oct 2012 to March 2013

3.Name of Project : Marco Polo Ortigas Project

Name and Address of the Owner : Xin Tian Ti Development

Corporation

Name and Address of the Engineer (Consultant) : Mohri & P.A. Associates

Indicate the features of project (particulars of the project components and any other particular interest connected with the Project)

Construction of Four (4) levels Basement Area and a Tower with forty (40) floors of office and hotel units

Contract Amount expressed in US Dollars

(PHP 1=USD 41.408) : USD 17,194,000.05

Position : Project Structural Engineer

Structures for which the employee was responsible

Construction of Four (4) levels Basement Area and a Tower with forty (40) floors of office and hotel units

Assignment Period : From Jun 2011 to Oct 2012

4.Name of Project : Tarlac - Pangasinan

- La Union Expressway

Name and Address of the Owner : Private Infra Dev Corp

Tarlac City

Name and Address of the Engineer (Consultant) : North Roadlink Joint Venture

Ltd. Corporation

Indicate the features of project (particulars of the project components and any other particular interest connected with the Project)

Construction of Expressway composed of interchanges, bridges, underpasses, overpasses, drainage and slope protection structures, PCCP and toll facilities (88.60 kms)

Contract Amount expressed in US Dollars

(PHP 1=USD 41.408) : USD 49,555,100.79

Position : Project Structural Engineer

Structures for which the employee was responsible :

Construction of Expresswaycomposed of interchanges, bridges, underpasses, overpasses, drainage and slope protection structures, PCCP and toll facilities (88.60 kms)

Assignment Period : from Jan 2011to Jun 2011

5.Name of Project : South Metro Manila Skyway – Stage 2 Project

Name and Address of the Owner : Citra Metro Manila Tollways

Corporation

Parañaque City

Name and Address of the Engineer (Consultant) : J.F. Cancio & Associates

Indicate the features of project (particulars of the connected with the Project)

Construction of Elevated Expressway thru Skyway Viaduct

Contract Amount expressed in US Dollars

(PHP 1=USD 41.408) : USD 194,375,262

Position : Project Structural Engineer

Structures for which the employee was responsible

Design of Falsework Supports and Site Supervision

Assignment Period : From Mar 201o to Jan 2011

6.Name of Project : LRT North Extension Project

Name and Address of the Owner : DOTC

Parañaque City

Name and Address of the Engineer (Consultant) : Ubay & Associates

Indicate the features of project (particulars of the connected with the Project)

Construction of Elevated LRT Viaduct from Monumento to Roosevelt

Contract Amount expressed in US Dollars

(PHP 1=USD 41.408) : USD 111,904,761

Position : Project Structural Engineer

Structures for which the employee was responsible

Design of Falsework Supports and Site Supervision

Assignment Period : From Feb 2008 to Jan 2010

CHARACTER REFERENCE

Jaime F Cancio J.F.Cancio and Associates

SALVADOR G. OLEIVAR

Name and Signature of Employee



Contact this candidate