JUSTIN CHUKWUEMEKE OLISA
** ********,***, **** *****, Nigeria
Tel: 080********,080********
E-mail: *********@****.***
CAREER SUMARRY
Performance driven professional with over 7 years hands –on engineering experience. Grounded in maintenance management systems, experienced in the use of SAP PM for maintenance planning, MAXIMO 7.5 for maintenance planning, Microsoft project for Maintenance scheduling, RCA reality charting using Apollo methodology, maintenance of hydraulic systems, pneumatic systems, pumps, fluid couplings, lubrication and industrial safety. I also have good understanding of mechanical drawings, a strong analytical skill, sound interpersonal and organizational skill, good IT skill (Microsoft excel and PowerPoint) and presentation skill
SKILLS & COMPETENCE
An organized individual with the ability to take challenges and responsibilities
SAP PM
Maximo 7.5
MS Project
High attitude to learn.
Facilitate RCA session using APOLLO methodology
Enjoys working in a busy and swift paced environment.
Ability to work innovatively under pressure and to deliver result under tight deadlines.
Has the ability to work on my own initiative as well as being an excellent team player and possesses excellent communication skills.
EDUCATION
Nnamdi Azikiwe University Awka, Anambra State 2001/2006
B. Eng (Second Class Division) Mechanical / Production Engineering
Western Boys High School 1993/1998
(Senior School leaving Certificate)
WORKING EXPERIENCE
Lafarge Africa PLC
Mechanical Planner 2014/Till date
Job Description
Planning and scheduling of work orders using maximo
Planning/scheduling of plant shutdown(SD) maintenance using maximo and ms project
Develop job plans(execution job plans and safety plan)
Monitoring engineering budget
Prepare departmental accrual documents
Ensuring compliance with health and safety legislation
Negotiating with vendors
Develop contracts/job scope on subcontracted jobs
Drafting of engineering estimate for contracted jobs
Organize site visit for contractors/vendors
Sourcing for spare part and service providers
Provide technical documentation on plant assets
Facilitate RCA session on plant assets using APOLLO methodology
Provide inputs on asset risk management plan
Applies value analysis to repair/replace, repair/design and make/buy decisions
NIGERIA BOTTLING COMPANY, ILORIN PLANT 2012/2014
Job description
Maintenance planner-
SAP PM-Business Process Specialist
Planning and scheduling preventive maintenance
Monitoring and controlling engineering budget
maintaining statistical and financial records
ensuring compliance with health and safety legislation
Allocating work to a team of technicians and craftsmen
Tracking/ Reviewing of Pre and Post maintenance report
Create Work Order for agreed notifications
Perform RCA on machine breakdown
Generate reports from business warehouse
OPEX budget management
Prepare departmental accrual documents
Monitor fuel usage for both generators and boiler to determine the efficiency of equipment.
FTN COCOA PROCESSORS PLC, IBADAN 2010/2012
Job description
Mechanical engineer-
Collect data and information for preventive maintenance and condition monitoring.
Drafted a new preventive maintenance plan.
Coordinated the implementation on the preventive maintenance plan.
Troubleshooting faults and performing root cause analysis of faults
Maintenance of hydraulic and pneumatic machines
Allocating work to a team of technicians and craftsmen
Coordinate with production department as per maintenance scheduling.
Proactively identifying areas of obstruction/breakdowns and take steps to rectify the equipments through application of trouble shooting tools.
Installation & commissioning of newly acquired machines Hydraulic press machine, continuous roasting machine, winnowing machine
Design of steam line, hot water line and chilled water line to the new factory.
Production coordinator-
Coordinate the activities of the production team for the shift
Making sure that production targets are met.
Drawing up production schedules
making sure that products are produced on time and are of good quality
working out the human and material resources needed;
Turbo dynamics Nigerian limited (Packaging) 2008/ 2010
Job description
Project supervisor-
Making sure that the contractor maintain standard and keep to design specification.
Acting as an interface between the company and the contractor.
Involved in the design of the factory utility area, were the factory boiler room is located, generators and storage tanks for diesel and black oil.
Preparing production hall floor in readiness for machine installation.
Maintenance Engineer-
Maintenance team leader-
Plan the routine preventive maintenance of equipments and machinery.(paperboard corrugator, flexo scorer slotter printing machine,3 ton boiler,500 KVA cummis engine generator, stitching machines)
Supervise and make sure that the maintenance procedures are adhered to
Troubleshooting faults and performing root cause analysis of faults
N.Y.S.C (NATIOAL YOUTH SERVICE CORP)
(God Grace Grammar School, Igbokoda, Ondo State) 2007/2008
Job description
Teaching the senior secondary class 1 -3 Mathematics.
Teaching the senior secondary class 1 – 3 Physics.
Conducting morning assembly.
Mattkings Technical and Fabrication Co. 2004\2005
(6 months Industrial attachment)
Job description
Fabrication and construction of tanks(Storage and mobile tanks).
Supervision of fabrication works.
Machine operations (drilling and welding machines)
TRAINNING
SAP –Plant Maintenance
Maximo 7.5
MS Project
Spare parts standardization
Leadership Training
HSE (Hazard and risk management, fire safety)
Root Cause Analysis (RCA)-APOLLO methodology
Failure Mode and Effect Analysis (FMEA)
PERSONAL DATA
Sex Male
Marital Status Married
Date of Birth 11TH December, 1980
Place of Birth Jos, Plateau State
Nationality Nigerian
State of Origin Delta State
Local Govt. Area Ndokwa West
HOBBIES
Reading and researching.
Listening to music.
Playing football and chess.
Meeting people and making friends.
REFEREE: On request.