Curriculum vitae
Personal information’s
Name
ZAMFIR MIRCEA CATALIN
Address
Tg-Jiu, Gorj County, România.
Phone
********@*****.***
Nationality
Romanian
Date of birth
30.07.1980
Sex
Male
Civil status
married
Summary
Dedicated project management professional with over 11 years’ experience in monitoring and implementing multimillion energy related projects. Recognized for superior management acumen – poised in high pressure, fast-paced environment. Utilizes project management principles to independently plan and implement high-level technical solutions. Powerful verbal and written communicator with the wisdom to open relationships while maintaining confidentiality. Certified PMP Project Management Professional.
-Created project status and monitoring system to track and monitor progress and timeliness for more than 10 multimillion euro energy projects streamlining the flow of information.
-Reduced document generation and turn-around time by 75% by designing templates that automated high document production.
-Significantly reduced the numbers of Nonconformities by taking preventive actions during construction/installation phase of the projects.
-Successfully achieved reduction of contracts prices by carefully analyzing and interpretation of contractual clauses.
-Distinguished from others by tenacity to become an expert in the project management and creating a synergetic relationship with executives to increase achievements that impact organizational growth.
Professional experience
Period
April 2013 - present
Function
Energy Projects PMP, Development,Quality& Risk Management Engineer
Energy Investments Projects Monitoring and Implementation Office
Development and Strategy Division
S. Complexul Energetic Oltenia
Activity
Managed complex research, energy and desulphurization plants projects from revising Technical Documentation and elaborating Tender Documentation, following the tendering process for new Energy Investments Projects to Contract Administration and reception of works.
Key Achievements:
-Prepared and presented monthly reports regarding works progress, status and solutions for on time implementing of the projects.
-Improved the time response of management decisions by implementing dedicated reporting templates regarding projects status.
-Assured the interfaces between Project Coordinator and Beneficiaries for Underground Coal Gasification Project under EU-RFCS funding scheme.
-Reduced the negative impact over the areas affected by company activities by developing programs of support together with public authorities and civil entities.
-Developed the Risk Register and identified the Strategies and Development Division's associated risks, implemented measures to reduce the impact over the Investments Projects.
Period
March 2010 – July 2013
Function
Area Sales Manager
Syonic Software Solutions Timisoara
Activity
Acted as company representative and presented the company products to potential clients, installed, trained and assure after sales technical support for the clients.
Key Achievements:
-Successfully grew the market share of the company in the area from less than 1% to over 20% in the first year and over 35% by the end of activity by developing the sales strategy.
-Increased the security and efficiency in the medical services by providing a secure informational solution.
Period
May 2007 - April 2013
Function
Project Management Engineer, FIDIC Engineer, Electrical and I&C Engineer
Desulphurization Project Management Office
S.C. Complexul Energetic Oltenia S.A. Rovinari Power Plant
Activity
Assured the implementation of the desulphurization plants projects providing technical assistance regarding the problems related to carrying out of the works and which could affect the expenses or development of the projects.
Acted as FIDIC Engineer from reviewing and approving Technical Design Documentation for the mechanical, electrical and ICA (Instrumentation, Control and Automation) equipment, participating at Factory Acceptance Tests, issued Non Conformities, following the works in the projects and assisting at Commissioning to ensuring the successful testing and functioning of the sub-projects on completion and during the Defects Notification Period.
Key Achievements:
-Successfully decreased of time period from designing to put in operation of the works, resulting a speed up of the construction / installation works and a positive impact over the Time Schedule and Budget of the Project by re engineering the workflow for the design reviewing process.
-Decreasing with more than 70% of the number of Non-conformity due to preventive actions taken during construction/installation phase of the project.
-Reduced the numbers of failures of the installed equipments by 30% due to improvement in processes, documentation and products.
-Positively influenced the projects budget and achieved more than 10% reduction of contract prices due to strict analyze and interpretation of contractual clauses, both commercial and technical.
Period
November 2004 - May 2007
Function
Elactrical Engineer
Electro technical Office
S.C COMPLEXUL ENERGETIC ROVINARI S.A
Rovinari Power Plant
Activity
Performed and elaborated the planning of maintenance activities (Maintenance Plan) for electrical motors with power from 7 MW to 1KW,, electrical stations and substations both 6kV and 0,4kV, coordinated and monitored the achievement of technical revisions scheduled with contractors and / or their technicians .
Actively participated, collaborated and drawn up specific procedures or work instructions in business efficiency and improved the company's energy consumption.
Key Achievements:
- equipment’s (electronic) file - description of the equipment, design and functional characteristics, operational characteristics, replaced parts, vibrations monitoring, consumption, following the works for accidental stoppage of equipments, keeping the tracks of the spear parts for electrical motors and stations/substations, reparation periods and function hours of the equipments, maintaining dates, type of maintenance.
Schooling and forming
Period
2006-2009
Name and title of institution
Titu Maiorescu University – Bucharest
Science and Technology of Information Faculty
Period
2007- 2008
Name and title of institution
University of Craiova
Faculty of Economics and Business Administration
Post university studies Project Management
Period
2004-2006
Name and title of institution
University Constantin Brâncuşi – Tirgu Jiu
Master studies : Quality Assurance Management
Period
1999-2004
Name and title of institution
University of Craiova
Faculty of Electro mechanics
Period
1995-1999
Name and title of institution
High School Ecaterina Teodoroiu Tg-Jiu
IT Specialization
Personal skills and competences
Mother tongue(s)
Romanian
Other language(s)
Self - assessment
Comprehension
Speech
Writing
European level
Listening abilities
Reading abilities
Interaction
Expression
Language
C2
A2
English
French
C2
A2
English
French
C2
English
C2
English
C2
English
Courses,attested
Language Attested English,Pedagogy Course, European Integration Courses, Inventions Courses, AutoCAD Courses, Courses Attested International Contracting Procedures “FIDIC”, Courses Primavera- Project Management Software, Courses Attested Pollutant Emissions
Name and title of institution
University of Craiova Faculty of Electro mechanics, SC Perfect Service SA
Social skills and competences
Team player
Capacity of adapting to multicultural environments obtained from working with international Contractors
Good communicative capacity, obtained from working with different Contractors
Organizational skills and competences
Leadership
Organizatory spirit
Experience in Project Management
Technical skills and competences
Good knowledge of the process of Maintenance,Quality Control and Project Management, Environment Protection and Waste Management achieved during over seven years of project management team member.
Good knowledge of engineering, procurement, construction and commissioning of installations achieved during complete EPC of several installations including but not limiting to full refurbishment of a coal fired 330 MW Unit and Flue Gas Desulphurization Plants for 330 MW units.
Computer skills and competences
Competent user
Windows, AutoCAD, Microsoft Office Suite,Microsoft Internet Explorer, Microsoft Project Manager,,Primavera, Web Design
Electrical Installation Designer - Attested by National Energy Regulatory Authority
Recommendations :
"Very good Engineer,very good knowledges about Power Plants,very good prepared personel regarding documentation verification,very good working cooperation with Suppliers and Contractors. Very good understanding of processes,erection,commissioning and tests,during WFGD progress." CAMELIA POENARU, DOCUMENT CONTROLLER, ECS ROMANIA, was a consultant or contractor to Mircea at Complexul Energetic Oltenia
"Mircea was able to handle and to manage thousands of issues during construction, start up and commissioning at Rovinari's WFGD plant. His experience is now complete and I am convinced that no secret is remaning to his knowlege for this kind of job" Mario Moiana, quality control manager, Alstom Power Italia, worked directly with Mircea at Rovinari Power plant
"Mircea is an excellent fellow worker runing from start to end of a task to complete in very short time all the requirements. Combat and trustful person with good skills and experince in both activity fields, electric and mechanical. Good conversation support in English as well in French and in native Romanian language. Beeing part of Project Management Unit he got the experience of carry out the Project Manager tasks, how to follow and control Time Schedules for equipments deliveries and installations and to manage the works quality evaluation process. Also as Consultantancy Contract responsible for Wet Flue Gases Desulphurization Project he deals with all contractual requirements to be covered day by day along the entire period. Is good to have Mircea in your team or to colaborate with him for following or carry out the works." Petru Sorin ILCA, Project Administrator, Vattenfall Power Consultant / Welcome Business Research, worked with Mircea at Rovinari Power plant
"Mircea is a professional with a complete preparation, both theroretical, because of his electrical Engineering studies and background and practical (hands-on). In fact his field / job site experience and knowledge confer to him characteristics which represent unique assets for any company." Sebastian Buca, Project Quality Mgr.; Change Mgr. PowerMax - Environmental Control Systems, Alstom Power Italy, worked with Mircea at Rovinari Power plant