Post Job Free

Resume

Sign in

Manager Supervisor

Location:
Grapevine, TX
Posted:
January 18, 2016

Contact this candidate

Resume:

CIRRICULUM VITAE FOR MARK RAYMOND PETROSKY

Full Name:

Mark Raymond Petrosky

Home Address:

**** ******** ***** *****; Grapevine, Texas USA 76051

Telephone Number:

+1-469-***-****

Email Address:

acs5xq@r.postjobfree.com

Date of Birth:

17-Sep-1959

Nationality:

American

Country of Residence:

USA

Home Airport:

DFW

Job Role Desired:

Drilling Supervisor

PROFESSIONAL SUMMARY

Accomplished Superintendent / Supervisor in Drilling, Completion and Workover with 36 years’ experience in the oil & gas industry, both domestic and international. Thorough knowledge and experience in all types of drilling & workover operations, HPHT, multi-lateral and conventional. Accustomed to high concentrations of H2S and lost circulation situations. Successfully performed as Drilling & Completion Superintendent and Wellsite Supervisor for operators in all Texas regions, Mississippi, New Mexico, Saudi Arabia and Kurdistan, Iraq. Focused on implementing best drilling practices, following critical well path design, managing on time, on budget operations and meeting regulatory compliance to reach operators desired goals.

BACKGROUND SUMMARY / SKILLS

TECHNICAL EXPERTISE:

Drilling Manager for Afren MENA in Kurdistan, Iraq.

Drilling Supervisor for Saudi Aramco, Devon Energy and Afren MENA.

Drilling Operations Superintendent for Eagle Oil & Gas.

Completion Supervisor in South Texas for TransTexas Gas.

Expandable Liner Installations in East TX & Saudi Arabia.

Smart Well Completions with 5 laterals extending from motherbore in Saudi Arabia.

Multilateral Drilling and Completions in Saudi Arabia.

Air Drilling in Permian Basin.

HPHT wells in Texas, Louisiana, Mississippi and Saudi Arabia.

Mud cap or ‘dry drilling’ in New Mexico, Texas, Saudi Arabia and Iraq.

Stuck Pipe experience associated with lost circulation problems.

Closed loop operations with solids control implemented in Permian Basin.

Underbalanced Drilling Operations in Permian Basin & Saudi Arabia.

SIMOP operations in Iraq and Saudi Arabia.

Supervised Rigless Completion and Stimulation operations.

Offshore and Land based Supervision in all applications.

WORK EXPERIENCE / HISTORY

SRACO – Dammam, Saudi Arabia Aug 2015 – Nov 2015

Drilling Supervisor

Successfully directed and supervised operations for offshore exploration drilling division. Drilled new wells from spud to completion including high temperature, high-pressure oil and gas, horizontal completions, whipstock settings and orientation, directional drilling. Lost circulation, plug & abandon operations, offshore. Reported directly to Saudi Aramco Drilling Superintendents.

Cardno PPI – Houston, Texas USA Dec 2012 – April 2015

Drilling Operations Manager /Superintendent

Managed operations in Kurdistan, Iraq for Afren MENA. Designed drilling and workover programs in conjunction with engineering department. Managed daily operational activities at well sites. Monitored safe work practices, coordinated equipment and personnel logistics. Responsible for hiring of senior drilling and completion supervisors and engineers. Ensured full compliance with EHSS department. Reported to Corporate Drilling Manager in Houston, TX.

Cardno PPI – Houston, Texas USA June 2012 – Dec 2012

Sr. Drilling & Completions Supervisor

Sr. Drilling and Completions Supervisor in Kurdistan, Iraq for Afren MENA. Drilled and completed wells in the Mus, Adiayah and Kurra Chine formations. Work with high concentrations of H2S, extreme problematic well dynamics and wells with lost circulation. Operated within AFE and time schedules. Drilled successfully in extreme faulted lithology.

Sierra Engineering – TX/NM/OK USA Aug 2010 – June 2012

Drilling / Completion Supervisor

Drilling and Completion Supervisor in South Texas & New Mexico for Devon Energy. Drilled and completed extended reach lateral wells in Bone Springs, Wolfcamp and Avalon Shale formations. Utilized oil and water base mud applications. Followed well procedures and worked with Drilling Superintendent and Drilling Engineers to successfully obtain all well objectives within budgets. Have successfully drilled ahead of drill time curves on multiple wells. Experienced with lost circulation drilling & multiple drilling mud systems. Whipstock settings in several wells.

CUDD Drilling and Measurement – Frisco, Texas USA Mar 2009 – Aug 2010

Corporate Business Development

Organized meetings with operators and promoted drilling and measurement equipment, tools, well planning and design. Monitored day-to-day progress for future and ongoing wells. Planned equipment logistics. Advised on well planning for multilateral wells. Designed directional plans for HPHT wells in Haynesville formation. Followed up with client as required for post job reviews and operational developments.

Eagle Oil and Gas Company – Wichita Falls, Texas USA July 2006 – Feb 2009

Drilling Operations Superintendent

Directed and supervised all drilling and completion operations. Responsible for writing drilling procedures for all wells and monitoring daily progress. Responsible for writing all completion procedures including frac stimulations and insuring all operations were conducted accordingly. Designed vertical and horizontal wellbores to optimize drilling success and controlled costs for HPHT wells. Supervised CT wash/mill outs, Snubbing operations/drill outs. Wrote AFE’s for all drilling, completions and work over operations. Monitored all production through Field Direct and make recommendations for work over projects. Exceptional at HPHT well design, drilling and completion processes. Reported to VP of Engineering and Operations.

AMAREST – Dammam, Kingdom of Saudi Arabia Sept 1999 – July 2006

Drilling Supervisor

Directed and supervised operations for drilling and workover wells. Drilled new wells from spud to completion including high temperature, high-pressure oil and gas, horizontal completions, whipstock settings and orientation, directional drilling, Smart completions, sidetracking, re-entry. Set expandable liners, open hole completions, lost circulation drilling. Reported directly to Saudi Aramco Drilling Workover Superintendents.

Shale Production Systems – Rosenberg, Texas USA Jan 1996 – Sept 1999

Owner / Operator

Directed start up for the business, hired management, established sales staff. Provided Surface Well Testing, Reservoir Analysis, Coil Tubing accessories, Consultant and Manpower Services to clients. Coiled tubing drilling operations for re-completions. Arctic experienced for 8 years as Completion Foreman.

Schlumberger Well Services, LTD - USA/Colombia/Canada Sept 1980 – Jan 1996

Senior Service Specialist

Supervised and successfully performed Production Well Testing, Drill Stem Testing, Tubing Conveyed Perforating, Cased Hole Wire Line, Real-Time Data Transmission, Sub-sea Tree, Production Memory Logging, and Well Site Coordinator and Supervisor for Well Completions. Six years working in Arctic environments. Fifteen years offshore and deep water experienced.

TRAINING

oBasic and Advanced Reservoir Analysis

oWellview / SADK

oH2S

oIWCF – 2017

oHUET

oStuck Pipe Course - IADC

oHorizontal Drilling String Design - SPE

EDUCATION

Needville High School Diploma Graduated 1978

Chadwick University MBA Graduated 1993



Contact this candidate