SHAILENDRA SANKHLA

+919********* (M) **********.*******@*****.*** mailto:********@*****.**.**

** ***** ** ********** ** project management/construction management

Adept in executing and spearheading construction projects involving process development, Engineering & material expediting.

Experienced in projects with a flair for adopting modern construction methodologies in compliance to quality standards.

Deft in swiftly ramping up projects with competent skills and ensuring on time deliverables.

EMPLOYMENT PROFILE

Since June 2015- till date : TATA power / CGPL 5 x 800 MW thermal power project

The Key Deliverables

Responsible for Maintenance planning of general, routine & preventive maintenance of mechanical equipment of Cooling water system; ECP and Compressors.

Responsible for planning of spares & ensuring availability of all critical spares in area of work with appropriate record keeping of usage & replenishment.

Responsible for maintaining high quality & safety standard at work site.

Responsible for collecting data and analyzing occurrences using historised data of various parameters.

Coordinating & networking with contractors & vendors.

Since Feb 2014- June 2015 : PT Citra kusuma Perdana, Construction project for KAltim Prima Coal Mine east Kalimantan Indonesia. (On deputation from tata power)

The Key Deliverables as Construction consultant

Organize Project review meetings with Contractors and Consultants and Prepare minutes for the same

Co-ordination of project activities maintaining highest degree of Safety & Quality Standards. Analysis High risk activities and implementing risk management plan.

Review and expediating Engineering of various packages of BOP (HVAC, LP Valves, Fire protection system) and co-ordination with consultant and end client (KPC).

Design review and approval of P&ID, Plant layout. Supply BBU, Quality plans, MDCC issuance and Invoice certification.

Quantity certification and project budget analysis along with project manager during ordering stage of various packages.

Preparation and evaluating RFQ, vendor selection with Procurement team.

Ensuring adherence to target milestones.

Develop recover plan to meet the deadline in case of any slippage from the original schedule

Expediting delivery of materials and Help procurement with specification / alternative suggested with respect contry specific requirements.

Packages handled:-

Structure of STG, control building and Bunker structure

Engineering review and integration of vendor engineering with BTG area civil engineering to ensure on time deliverables like civil foundation of equipments and readiness of control room.

Co ordination with all department with respect to work front and chart out a detail liquidation plan to ensure deployment of resources at right place.

Turbine & Auxiliaries:

Execution of erection activities of Turbine and Generator right from the civil construction stage till completion of erection of all equipment in unit #1

Execution of TG auxiliaries including Deaerator, Heaters, Ejectors GSC, Overhead oil tank, and lube oil system of Turbine.

Surface Condenser & Piping:

Erection of first condenser after TG deck casting using dragging method and executed this heaviest equipment erection task safely.

Detail Engineering co-ordination with consultant to make alternative in next two units for change in TG deck staging design and allow the contractor to erect condenser well before the TG deck casting. This saves 100 Man days and crushed the forecast schedule for building completion by 6 months.

Engineering co-ordination in execution of fabrication of HP piping works at site for unit # 1.

Central Control room

Detail planning and engineering co-ordinations from Consultant / Client and vendors (Contractors) to meet project construction plan.

Taking proactive actions in civil procurement items and effective resource mobilization to complete Central control room / Switchgear room readiness and meet project milestone.

July’ 2008- Jan 2014 : Coastal Gujarat Power limited, 4000 MW UMPP Mundra

The Key Deliverables

Co-ordination of project activities maintaining highest degree of Safety & Quality Standards

Co-ordination with Engineering and Construction department for resolution of general issues at site.

Ensuring adherence to target milestones.

Organize and holding Kick-off meetings with Contractors and Consultants.

Hold regular progress meeting with contractors and prepare minutes for the same.

Develop recover plan with help of Planning dept. to meet the deadline in case of any slippage from the original schedule

Expediting delivery of materials and deployment manpower

Packages handled:-

Structure of TG & control building:

Planning of material procurement and expediting for Fabrication and Erection of TG structure

Co-ordination with associated departments & to hold proactive discussion to ensure work front availability and smooth functioning of site.

Project planning: - Boiler and TG and Condenser packages

Finalization of boiler hydro test scheme & its interference with other packages.

Review of construction schedule of the contractors and monitoring site activities.

Review of contractors work plan for ensuring week/ month milestone achievement.

Noteworthy Contributions

Process improvement for condenser dragging over debris filter pit.

Actively involved in Knowledge management of boiler construction sequence.

Study of interference packages linked with boiler hydro test.

Co-ordination & follow up with civil construction for timely work front availability for auxiliary’s erections.

PREVIOUS EMPLOYMENT PROFILE

August’2005 to July’ 2008: Larsen & Toubro Limited, Vadodara.

Site Engineer

Responsibilities:

IOCL PNCP 238MW CPP Project

Expediting & Inspection of 2 Nos. of De aerator from BHEL for IOCL PNCP- Captive power project.

Inspection of structure fabrication of Heat recovery steam generator for IOCL PNCP project.

Erection of 5 Nos. of Horizontal Heat recovery steam generators

KGPL 445MW IPP Project

Erection of 2 Nos. of Vertical Heat recovery steam generators & it’s auxiliaries

Erection of Power Cycle piping.

Preparing the procedures & finalizing the schemes for steam generator Hydro test & pre-commissioning activity.

Preparation & certification of As-Built drawings for hassle-free closure of KGPL project.

ACADEMIC CREDENTIALS

Education Levels

Institution/

Board

Year of Completion

Diploma in Mechanical Engineering

Board of Technical Education Rajasthan, Jodhpur with 75.6%

2005

ASNT Level II

Certified course in QA/QC(NDT training) level II

2009

B. Tech in Mechanical Engineering

Institution of mechanical engineers Mumbai.

2013 -Correspondence

ACHIEVEMENTS

Rewarded with NMR award for outstanding performance in 2007-2008 at L&T

Award received for Cycle Time reduction in DCS Power On during Award Nite-2012 at CGPL

A certified STOP Observer (by DuPont)

TRAINING

Global management on Mobile crane safety by Global knowledge conferences.

Valves in Power industries in AUDCO India limited.

Simulator training of 830 MW supercritical units.

PERSONAL DOSSIER

Date of Birth : 16th September 1984

Permanent address : 12/115, Mandir wali gali, Hathi-bhata, Ajmer.

The above details are true to the best of my knowledge & belief.

Shailendra Sankhla



Contact this candidate