Amir Maherkia, B.Eng., PMP
Project Coordinator/ Project Manager Assistant / Junior Project Manager
Toronto, ON L3R5C1
*********@*****.*** - 001**********
Project Engineer/Coordinator with over 8 years' experience in Infra-Structure capital projects(Power Plants,Pipelines and Waste Water Treatment Plants). Have led, supervised, coordinated and controlled project team to ensure engineering, procurement and construction purposes.
Performed Scope and WBS Development, Defined Activities and dependencies as well as forecasting of Man Power, resources and costs to load to the master plan to identify critical path and prepare baseline. Applied best-in-class PM practices including CPM, Cost Control (EVM) and delay analysis to tracked progress and changes versus baseline, monitored related risks and impacts that resulted in cost and schedule overrun. Willing to relocate: Anywhere
WORK EXPERIENCE
Renovation Technician
Tidan Hospitality & Real Estate Group - Montréal, QC - April 2015 to June 2015 Accomplishments
Project finished on time.
Skills Used
Ability to prioritize jobs, working in group
Reference: Naja El Khoury,Executive Assistant General Manager 50 boul. Rene-Levesque Ouest, Montreal,QC
Tel:514-***-**** ext.:2245
Email: *********@******************.***
Project Manager/Project Coordinator
Technozist Co. Water and Waste Treatment Main Contractor - Tehrān - August 2010 to July 2014 Responsibilities
• Participated in preparing SOW, Contract Deliverable and Hard/Soft Milestones
• Defined Product, Cost and Work breakdown structures (PBS, CBS, and WBS)
• Analyzed the impact of change orders on project schedule and budget and perform cost/benefit analysis
• Settled down invoicing issue and claims/disputes with client, subcontractors and suppliers
• Coordinated RFIs, RFQs, and RFPs and perform build/buy analysis
• Experienced coordination among Engineering, Procurement and Construction (EPC) Projects :
Tehran Waste Water Pipe Line by Microtunneling & Pipe Jacking ( Dia : 1200 mm) Kish Island's Supplementary Sewage treatment Package, 10000 m3/day Sewage Treatment Packages for Labor Camps, South Pars, Phase 12, 2400 m3/day Rasht Sewage Pump Station, 4500 m3/day
Site Engineer
ILAM Petrochemical Complex, Power & Steam Generation Plant, Farab Co. - ILAM, IRAN - March 2009 to August 2010
Responsibilities
• Supervised and inspected of installation of equipment such as: GTG, By Pass Stack, Tanks, Pumps, UG/ AG Piping
• Provided technical support and supervision to construction staff and coordinate with other disciplines like Process, Safety, Civil, Structure.
• Planned and scheduled daily work activities at site.
• Checked technical documents P&IDs, PFDs, Isometric Drawing, layouts and relevant specification,
• Addressed technical problems and offered solutions.
• Coordinated and supervised sub-contractors activities.
• Prepared technical disposition of non-conformance reports (NCRs). Site Engineer
NEMAD- AB-SAHAND Co. Water Pipeline Projects - Tabrīz - May 2006 to February 2009 Responsibilities
• Supervised and coordinated Surveyors.
• As-Built drawings Preparation.
• Implemented of construction requirements.
• Internal Quality control.
• Prepared invoices.
Junior engineer
Jarvand Co. Aghajary Gas Injection Station - Aghajary, IRAN - April 2005 to April 2006 Responsibilities
• Prepared material takeoff lists (MTO) for piping
• Prepared project mechanical equipment lists
• Coordinated sub-contractor activities
EDUCATION
BSc in Mechanical Engineering
Tabriz Azad University - Tabrīz
2001 to 2005
SKILLS
Project Management, Contract Management, Claim Management, Procurement, Six Sigma, Change Management, Energy, Water and Waste water, Micro tunneling CERTIFICATIONS
PMP, Project management Professional
Project Management Institute, PMI
ADDITIONAL INFORMATION
Computer Literacy :
Ms Project
Ms Office (PowerPoint, Word, Excel, Outlook)
PDMS ( design, draft, isodraft ), AutoCAD