Name: Oliver Dayo Roque
Age: ** yrs.old
Birth date: May 11,1983
Address: Sta Clara Batangas City
Job Title: Pipe Fitter
Mobile No:+639*********/+639*********
email address: *************@*****.***
Over five years of valuable accomplishments and worthwhile experiences in almost all fields of pipe fitting
Engaged and successfully completed large-scale construction of oil, gas and water pipelines, and refineries, petrochemical and power projects.
Education and Training
CERTIFICATE OF TRAINING
Piping Insulation (162 hrs.)
BAGMET SKILLS TRAINING CENTER INC.
Libjo,Batangas City
Acredited by TESDA
November 10,2014 to December 3,2014
NATIONAL CERTIFICATE LEVEL II – SCAFFOLD ERECTION
Technical Education
Certificate No.140***********
Issued’on October 30,2014
NATIONAL CERTIFICATE LEVEL II – PIPE FITTING
Technical Education
Certificate No.140***********
Issued’on July 26, 2014
TECHNICAL WELDING
Batangas State University
Graduated December 13,2002
HIGH SCHOOL
Alternative Learning System Acreditation & Equivalency(ALS A&E)
Graduated October 26,2008
ELEMENTARY Sta Clara Elementary School Graduated June 8,1991 to March 30,1996
Resiratory Protection ProgramTraining & Fit Testing Certificate
conducted and sponsored by CB&I Clough JV,held on 24 April 2014,Hides,Papua New Guinea
Confine Space Attendant & Entrant Training
conducted and sponsored by CB&I Eastern Anstalt on 10 January 2010,Abu Dhabi UAE
Pipe Fitter – Atlantic,Gulf & Pacific Company of Manila Inc. February 2, 2015 up to present
Duties and responsibilities of position includes:
Fit-up of carbon & stainless steel, Assign in pipe rack area.Installation of any sizes of spool starting the low elevation to high elevation
Fabricate of pipe support preparation and grinding of heavy wall pipe,cutting works using oxygen/acetylene.
Ensure that all works are undertaken in compliance with the project requirements
Show high regard for personal safety and safety of workmates, ensure work area is free of hazards and participate in daily housekeeping.
When working at heights wear a body harness with lanyard secured to an approved anchorage point at all times whilst working outside of an approved work platform.
Where competent, assist other trades (scaffolders,riggers, pipefitters, welders etc.) in completion of their work.
Assignment have Included:
Scope includes the EPC work for the liquefied natural gas plant and associated piping and module for
Ichthys Project in Darwin,Australia
Pipe Fitter – CB&I CLOUGH JV PTE LTD.(EXXON MOBIL HGCP) June 18, 2012 to May 10, 2014
Duties and responsibilities of position includes:
Fit-up of carbon & stainless steel, Assign in pipe rack area.Installation of any sizes of spool starting the low elevation to high elevation
Fabricate of pipe support preparation and grinding of heavy wall pipe,cutting works using oxygen/acetylene.
Ensure that all works are undertaken in compliance with the project requirements
Show high regard for personal safety and safety of workmates, ensure work area is free of hazards and participate in daily housekeeping.
When working at heights wear a body harness with lanyard secured to an approved anchorage point at all times whilst working outside of an approved work platform.
Where competent, assist other trades (scaffolders,riggers, pipefitters, welders etc.) in completion of their work.
Assignment have Included:
Scope includes the EPC work for the gas conditioning plant, nearby wellheads and associated piping and infrastructure for Esso Highlands in the Southern Highlands of PapuaNew Guinea
Pipe Fitter – (PSN) PRODCUTION SERVICES NETWORK,PHILS.CORP.
February 28, 2012 to May 27,2012
Duties and responsibilities of position includes:
Demolition of old pipeline of high pressure pipe,Installation of drain line of boiler area.
Show high regard for personal safety and safety of workmates, ensure work area is free of hazards and participate in daily housekeeping.
When working at heights wear a body harness with lanyard secured to an approved anchorage point at all times whilst working outside of an approved work platform.
Participate in the preparation of Job Safety Analysis (JSA’S)
Assignment have Included:
Shutdown of old pipeline in auto diesel oil and vessels located inside in Shell Refinery,Tabangao Batangas,Philippines
Pipe Fitter – CB&I Eastern Anstalt
November 21,2010 to March 10,2011
Duties and responsibilities of position includes:
Receive the work and implement them promptly and safety and following all applicable standards.
Prepare for the work by collecting all the necessary hand and power tools,manual,drawing and other work aids.
Interpret scale drawings of components being fabricated, clarify requirements wherever necessary.
Identify and correct any deviations from the scale drawings of work at hand, and seek clarification whenever necessary
Assignment have Included:
Construction of two double wall prophane storage tanks,three naptha storage tanks and piping works in Gasco Project Ruwais,Abu Dhabi UAE
Pipe Fitter – CB&I Eastern Anstalt/Borouge 2 Project
April 3,2010 to June 4,2010
Duties and responsibilities of position includes:
Line checking and punch listing
Perform and implement the work safety and conscientiously,receive and verify materials for fabrication and installation
Interpret scale drawings of components being fabricated, clarify requirements wherever necessary.
Identify and correct any deviations from the scale drawings of work at hand, clarification whenever necessary
Assignment have Included:
Piping works in expansion line and elevated area nearby live plant inside the borouge 2 in Ruwais,Abu Dhabi UAE
Pipe Fitter – CB&I Eastern Anstalt/Borouge 2 Project
March 8,2009 to September 15,2009
Duties and responsibilities of position includes:
Procure all necessary tools and equipment necessary for fabrication and installation
Receive all the materials necessary for the work and accordance with the manufacturer specification. .
Perform fit-up of spools,fittings and relative work
Assignment have Included:
Piping works in expansion line and elevated area nearby live plant inside the borouge 2 in Ruwais,Abu Dhabi UAE
Pipe Fitter – Consolidated Contractors Company
January 4,2007 to September 14,2007
Duties and responsibilities of position includes:
Erection and installation of stainless and carbon steel,preparation of purging materials
Cutting of existing line with hot permit,prepare isometric drawing with materials take off prior for installation
Perform fit-up of spools and fittings
Assignment have Included:
Construction of Train 4 (WHRU) expansion,piping works,civil works,E&I works and mechanical works inside the Ras Laffan,Doha,Qatar
CHARACTER REFERENCE Contact Number
Full Name: Mr.Derick Arago (043-***-**** Job Description: Brgy.Captain Address: Sta Clara Batangas City
Full Name: Mr.Victor Tabora +639**-***-**** Job Description: CB&I Superintendent Address: Masbate,Philippines
Full Name: Mr.Alex Osmena +639**-***-**** Job Description: CB&I Piping Supervisor Address: Bacoor City,Cavite
Contact Personal in case of Emergency Mrs.MaryRose F. Roque Sta.Clara,Batangas City mobile no.+639*********
I hereby certify that the above information is true,complete and correct to the best of my knowledge that any misrepresentation in this application shall result in the rejection of my application and/or will be sufficient ground for dismissal.
OLIVER D. ROQUE
Applicant