OSABEL, REGINALD VILLARANDA
#** ***** **, ******* ************* city
Mobile: 094********
E-mail: ***************@*****.***
OBJECTIVE
Hard working,Pro-active, Flexible, Willing to learn and Trained
To be Achiever and contributor in organization those recognized my Knowledge, abilities, and creativity as well provide opportunity for career growth and development.
PERSONAL BACKGROUND
Age: 28
Date of Birth: May 31, 1987
Place of Birth: Malibay, Pasay City
Civil Status: Married
Citizenship: Filipino
Height: 5’5
Weight: 115 Lb.’s
Religion: Roman Catholic
Sex: Male
Father’s Name: Romeo Osabel
Occupation: Computer Technician
Mother’s Name: Ma.lea Osabel
Occupation: Sewer
EDUCATIONAL BACKGROUND
Primary Tenement Elementary School
1994-2000
Secondary Pasay City West High School
2000-2004
Tertiary AMA Learning Center
2005
Vocational TESDA Training Center
Refrigeration Air-conditioning servicing
2008
WORK EXPIRIENCE
Company: Kyanat corp.
Address: Aljouf Sakaka Saudi Arabia
Position: Aircon Technician and Maintenance
From: July 24, 2013 – To: September. 2, 2015
Company: CBRE Real state Philippines
Assign: Zuellig Bldg Makati city
Position: Multi-skilled technician
January 22, 2013 to July 20, 2013
Company: MDEC CORP.
Address: #15 Maningning st.Sikatuna Bldg.Quezon City
Project assigned: ABS-CBN (Broadcasting Center)
Position: A/C Tech Maintenance (Feb. 9, 2010 –Jan 15, 2013)
Company: Steamatic Restoration and Cleaning
Address: Chino Roces Ave. Makati City
Position: A/C Tech (2004-2009)
RESPONSIBILITIES OF ON CALL DUTY OPERATION
Responding water leak and over flow of drain pan.
Maintaining the room temp.of server room and EE room area.
Monitoring of all water tanks cistern and elevated Potable and Non-Potable water.
DUTIES AND RESPONSIBILITIES OF MAINTAINING CHILLED WATER AND DI-EX TYPE__
General cleaning of AHU and fan coil, window, split-type air conditioning.
Fully down of gear reducer pump re-bearing motor and gear reducer.
Check the Belt of units and Y-strainer cleaning and filter cleaning the unit.
Replace pillow block to cooling tower blower.
Re-process all units window and split type air conditioning.
Leak testing, flushing and charging refrigerant to WAC and SPLIT type unit.
CHARATER REFERENCE
chift Engr. Mr. Jaime Vidar
Shift Mechanical
Zuellig Property Management Engineering
Mr. Arthuro Victoria
Head Mechanical Supervisor
ABS-CBN Property Management Engineering
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
OSABEL, REGINALD VILLARANDA