Post Job Free
Sign in

Microsoft Office Electrical

Location:
Elgin, IL
Posted:
September 17, 2015

Contact this candidate

Resume:

Jerry Phoulavong

*** ****** *****, *****, ******** 60120

847-***-**** (Cell) ********@*****.***

Professional Summary

CNC Machine Center setup with approximately 10 hours with hands on experience. Experience with loading programs from USB and load stock into vise. Set up work to offset G5r X&Y Axis using touch offset device. Also has experience in alignment indicators for tool, touch off using 1.2.3 block to set length. Also can offset in the controller using MDI Program for manually entering tool changes and sending the machine home. Has experience with the use of G91, G28, X0, Y0 and Z0, measuring with dial caliper outside micrometer machine shop and experience with math blue prints orientation.

Skills

Expert in mechanical assembly, small parts assembly and skilled in final assembly processes.

Experience in Stacks Pneumatic tools using wiring pressure gauge installation, fusing, cutting and measuring tool

Qualified in blueprint interpretation and knowledge of metal parts and assemblies

Team player in respect to teaching and training

Able to learn proficiently in Microsoft office software

Education

Associate of Arts CNC Machine Operators

Choice Career College – Des Plaines, IL

Machining Certificate

Coursework in Mathematics, Computers, Manufacturing and Planning and Control

Education Career Training: Electrical and Wiring Field

Elgin Community College, IL 60120

Work History

Electrical Wiring

Felsomat – Schaumburg, IL

07/2014-04/2015

Responsible for Wiring Machine

Responsible for Mechanical operations of the machine

Water Chiller Builder

Haskris – Elk Grove Village, IL

02/1986- 11/2013

Received and correctly processed both written and verbal instructions, prints and work orders.

Disassembled, reassembled and corrected changeover.

Repainted and precisely touched-up components and assemblies.

Built containers and pack parts in accordance with detailed packing specifications.

Inspected and tested components, assemblies and power tools.

Made and revised set ups on test strands previously calibrated by other staff.

Recognized and reported defective material and equipment to shift supervisor.

Assembled compressors using Work Center Instructions (WCI), piping, and Instrumentation instructions (P and I).

Wiring Diagram (WD), Bill of Material (BOM), and assembly drawings.

Completely installed foam insulation on tubing and controls.

Assembled frames, separator tanks, components to engines in assigned area per BOM or WCI.

Aligned motor, air end and coupling using calipers, dial indicators and straight edges.

Ran stainless, aluminum, steel and PVC piping



Contact this candidate