Jerry Phoulavong
*** ****** *****, *****, ******** 60120
847-***-**** (Cell) ********@*****.***
Professional Summary
CNC Machine Center setup with approximately 10 hours with hands on experience. Experience with loading programs from USB and load stock into vise. Set up work to offset G5r X&Y Axis using touch offset device. Also has experience in alignment indicators for tool, touch off using 1.2.3 block to set length. Also can offset in the controller using MDI Program for manually entering tool changes and sending the machine home. Has experience with the use of G91, G28, X0, Y0 and Z0, measuring with dial caliper outside micrometer machine shop and experience with math blue prints orientation.
Skills
Expert in mechanical assembly, small parts assembly and skilled in final assembly processes.
Experience in Stacks Pneumatic tools using wiring pressure gauge installation, fusing, cutting and measuring tool
Qualified in blueprint interpretation and knowledge of metal parts and assemblies
Team player in respect to teaching and training
Able to learn proficiently in Microsoft office software
Education
Associate of Arts CNC Machine Operators
Choice Career College – Des Plaines, IL
Machining Certificate
Coursework in Mathematics, Computers, Manufacturing and Planning and Control
Education Career Training: Electrical and Wiring Field
Elgin Community College, IL 60120
Work History
Electrical Wiring
Felsomat – Schaumburg, IL
07/2014-04/2015
Responsible for Wiring Machine
Responsible for Mechanical operations of the machine
Water Chiller Builder
Haskris – Elk Grove Village, IL
02/1986- 11/2013
Received and correctly processed both written and verbal instructions, prints and work orders.
Disassembled, reassembled and corrected changeover.
Repainted and precisely touched-up components and assemblies.
Built containers and pack parts in accordance with detailed packing specifications.
Inspected and tested components, assemblies and power tools.
Made and revised set ups on test strands previously calibrated by other staff.
Recognized and reported defective material and equipment to shift supervisor.
Assembled compressors using Work Center Instructions (WCI), piping, and Instrumentation instructions (P and I).
Wiring Diagram (WD), Bill of Material (BOM), and assembly drawings.
Completely installed foam insulation on tubing and controls.
Assembled frames, separator tanks, components to engines in assigned area per BOM or WCI.
Aligned motor, air end and coupling using calipers, dial indicators and straight edges.
Ran stainless, aluminum, steel and PVC piping