NELSON C.FABON
Residential Address:
DUCALANG ST.POBLACION
KANANGA LEYTE,PHILIPPINES
Mobile No.+639********* Email:******.*****@*****.***
************@*****.***
POSITION DESIRED
PIPING SUPERVISOR
HIGHLIGHTS OF QUALIFICATION:
Tweenty (20) years experience in piping job. Cross country piping in
GEOTHERMAL POWER PLANT,PETROCHEMICAL PLANT,SMELTING
and REFINING PLANT,STEEL PLANT and ALSO IN OIL REFINERIES
OF SAUDI ARAMCO.
I work in PEARL GTL Gas To Liquid Project in Ras Laffan Industrial
City,Qatar by Kelog Brown and Root (KBR) Joint Venture of Japan Gas
Company (JGC).I assigned in Kuwait for shutdown job at Shuaiba Refinery
at Kuwait National Petroleum Company (KNPC) from February 23,2011 to
May 4,2011. I work in 4th NGL TRAIN PROJECT owned by GASCO Joint
venture of PETROFAC and GS ENGINEERING & CONSTRUCTION up to
May 6,2013.
I work in PETRON BATAAN REFINERY RMP-2 PROJECT at Lamao,
Limay Bataan from Sept.14 2013 up to August 25 2014.
For my previous experience I work in HAMRIYAH FREE ZONE as a SITE
SUPERVISOR at DANA GAS,ZORA GAS PLANT up to August 9, 2015.
JOB SUMMARY
Erection of pipe rack structure, equipments, vessels, columns and erection of
piping on the pipe rack and to the nozzle of equipment and vessels.
UP CLOSE
Date of Birth : November 15, 1971
Place of Birth : Calubian Leyte,Philippines
Age : 43 years old
Nationality : Filipino
Civil Status : Married
Dependent :4
Height : 5' 9"
Weight : 102 kg.
EDUCATIONAL ATTAINMENT
Degree/ Diploma School/ Country Period (from-to)
Bachelor of Secondary Education LSC Tacloban, City 1989-1993
Secondary School CNVS Calubian, Leyte 1984-1988
Elementary School CSCS Calubian, Leyte 1978-
1984
WORKING EXPERIENCE
SITE SUPERVISOR FROM SEPTEMBER 1,2014 UP TO AUGUST 9, 2015
EXTERRAN BELLELI ENERGY.
ZORA GAS PLANT PROJECT
HAMRIYAH FREE ZONE,SHARJAH UAE
JOB SUMMARY
WORKS UNDER THE DIRECT SUPERVISION OF IMMEDIATE
SUPERIOR.RESPONSIBLE FOR PLANNING,ORGANIZING AND
CONTROLLING THE OPERATIONS OF MY UNIT TO MEET THE
PRODUCTIVITY,QUALITY AND SAFETY TARGETS
JOB DUTIES
1.)Plan,organize and direct the activities of my unit.
2.)Prepare a detailed 2-weeks look ahead schedule.
3.)Determine the manpower,equipment and tools,materials,and drawings needed
to meet the 2-weeks schedule.
4.)Prioritize, allocate, monitor and expedite equipment, tools and manpower
needed by his unit and ensure availabilty of same at the point of use on
time.
5.)Evaluate productivity and work progress and take preventive and or corrective
action.
6.)Coordinate with other groups on matters needed to ensure smooth interfacing
of activities.
7.)Review and approve Daily Accomplishment Report submitted by GFM.
8.)Prepare project completion rating of his General Foreman.
9.)Strictly enforce company rules and regulations,quality and safety policies.
10.)Train subordinates.
PIPING SUPERVISOR FROM SEPTEMBER 14,2013 UP TO AUGUST 25,2014
YUHAN TECH PHILIPPINES INC.
PETRON BATAAN REFINERY RMP2 PROJECT
LAMAO,LIMAY BATAAN
JOB SUMMARY
WORKS UNDER THE DIRECT SUPERVISION OF IMMEDIATE
SUPERIOR.RESPONSIBLE FOR PLANNING,ORGANIZING AND
CONTROLLING THE OPERATIONS OF MY UNIT TO MEET THE
PRODUCTIVITY,QUALITY AND SAFETY TARGETS.
JOB DUTIES
1.)Plan,organize and direct the activities of my unit.
2.)Prepare a detailed 2-weeks look ahead schedule.
3.)Determine the manpower,equipment and tools,materials,and drawings needed
to meet the 2-weeks schedule.
4.)Prioritize, allocate, monitor and expedite equipment, tools and manpower
needed by his unit and ensure availabilty of same at the point of use on
time.
5.)Evaluate productivity and work progress and take preventive and or corrective
action.
6.)Coordinate with other groups on matters needed to ensure smooth interfacing
of activities.
7.)Review and approve Daily Accomplishment Report submitted by GFM.
8.)Prepare project completion rating of his General Foreman.
9.)Strictly enforce company rules and regulations,quality and safety policies.
10.)Train subordinates.
PIPING SUPERVISOR FROM SEPTEMBER 29,2011 UP TO MAY 6,2013
SUNGCHANG ENGINEERING and CONSTRUCTION CO.LTD
GASCO RUWAIS 4TH NGL TRAIN PROJECT
RUWAIS,ABU DHABI
JOB SUMMARY
WORKS UNDER THE DIRECT SUPERVISION OF IMMEDIATE
SUPERIOR.RESPONSIBLE FOR PLANNING,ORGANIZING AND
CONTROLLING THE OPERATIONS OF MY UNIT TO MEET THE
PRODUCTIVITY,QUALITY AND SAFETY TARGETS.
JOB DUTIES
1.)Plan,organize and direct the activities of my unit.
2.)Prepare a detailed 2-weeks look ahead schedule.
3.)Determine the manpower,equipment and tools,materials,and drawings needed
to meet the 2-weeks schedule.
4.)Prioritize, allocate, monitor and expedite equipment, tools and manpower
needed by his unit and ensure availabilty of same at the point of use on
time.
5.)Evaluate productivity and work progress and take preventive and or corrective
action.
6.)Coordinate with other groups on matters needed to ensure smooth interfacing
of activities.
7.)Review and approve Daily Accomplishment Report submitted by GFM.
8.)Prepare project completion rating of his General Foreman.
9.)Strictly enforce company rules and regulations,quality and safety policies.
10.)Train subordinates.
Assigned in QA/QC Department as PIPING and WELDING INSPECTOR
Fitup visual inspection of pipe joints
Weld visual inspection of pipe joints
Witnessing of Liquid Penetrant Testing and Magnetic Particle Testing
Witnessing for Hardness Testing
Prepare documents of TEST PACKAGE in preparation for HYDRO TEST.
Witnessing of Hydrostatic Testing.
Witnessing of final bolt torquing.
Witnessing of Reinstatement
PIPING SUPERVISOR JUNE 8, 2008 UP TO FEB.23,2011
CONSOLIDATED CONTRACTORS INTL. COMPANY
PEARL GAS TO LIQUID PROJECT
RAS LAFFAN INDUSTRIAL CITY, QATAR
PIPING SUPERVISOR FEB.23,2011 UP TO MAY 04,2011
CONSOLIDATED CONTRACTORS COMPANY(KUWAIT)
SHUAIBA REFINERY
KUWAIT NATIONAL PETROLIUM COMPANY (KNPC)
JOB SUMMARY
WORKS UNDER THE DIRECT SUPERVISION OF IMMEDIATE
SUPERIOR.RESPONSIBLE FOR PLANNING,ORGANIZING AND
CONTROLLING THE OPERATIONS OF MY UNIT TO MEET THE
PRODUCTIVITY,QUALITY AND SAFETY TARGETS.
JOB DUTIES
1.)Plan,organize and direct the activities of my unit.
2.)Prepare a detailed 2-weeks look ahead schedule.
3.)Determine the manpower,equipment and tools,materials,and drawings needed
to meet the 2-weeks schedule.
4.)Prioritize, allocate, monitor and expedite equipment, tools and manpower
needed by his unit and ensure availabilty of same at the point of use on
time.
5.)Evaluate productivity and work progress and take preventive and or corrective
action.
6.)Coordinate with other groups on matters needed to ensure smooth interfacing
of activities.
7.)Review and approve Daily Accomplishment Report submitted by GFM.
8.)Prepare project completion rating of his General Foreman.
9.)Strictly enforce company rules and regulations,quality and safety policies.
10.)Train subordinates
PIPING FOREMAN SEPTEMBER 2003 UP TO FEBRUARY 2008
M.S.AL-SUWAIDI INDUSTRIAL SERVICES CO.LTD
JUBAIL INDUSTRIAL CITY K.S.A
FROM SEPT.2003 TO FEB.2008, I WORKED AS A PIPING FOREMAN IN ANY
VARIOUS PROJECT OF AL-SUWAIDI COMPANY SUCH AS:
SUMITOMO CHEMICAL ENGG CO. LTD(SCEC) NOV.2007 UP TO FEB.2008
RABIGH REFINING AND PETROCHEMICAL COMPANY
RABIGH K.S.A.
SAUDI ARABIAN OIL COMPANY OCT.2006 UP TO NOV.2007
SAUDI ARAMCO,JEDDAH REFINERY
JEDDAH KINGDOM OF SAUDI ARABIA
DIESEL HYDRO THREATER PROJECT JAN.2005 UP TO JULY 2006
SAUDI ARAMCO,YANBU REFINERY
YANBU AL-SINAIYAH K.S.A
SAMSUNG,PETROKEMYA No.3 BUTENE-1 PROJECT MARCH 2004 TO NOV 2004
JUBAIL INDUSTRIAL CITY K.S.A
SAUDI IRON STEEL COMPANY (HADDED) SEPT.2003 UP TO FEB.2004
SABIC SAUDI IRON &STEEL COMPANY
JUBAIL INDUSTRIAL CITY K.S.A
JOB SUMMARY:
WORKS UNDER THE DIRECT SUPERVISION OF THE GENERAL
FOREMAN OR SUPERVISOR.RESPONSIBLE FOR EXECUTION,&
CONTROL OF THE WORK ACTIVITIES IN HIS ASSIGNED WORK
AREA TO ATTAIN TARGET PRODUCTIVITY, QUALITY & SAFETY.
JOB DUTIES:
1.Implement plans & schedules as directed by immediate superior.
2.Provide his men with productivity & quality targets.
3.Provide specific work instruction & guidelines needed to carry out work
assignment & meet targets.
4.Push & motivate his men to attain schedules & productivity targets.
5.Monitor & report daily work accomplishment & corresponding man-hour &
equipment-hour utilized.
6.Evaluate work progress & take action to correct unfavorable deviation.
7.Explain &enforce company rules & regulations, quality & safety requirements.
8.Prepare project completion rating of men under him.
9.Train subordinates on the correct methods of doing their works.
TRIPLE J. CONTRACTOR
PHILIPPINE NATIONAL OIL COMPANY PROJECT
TONGONAN, KANANGA LEYTE PHILS.
OCT.7, 2002 TO JUNE 8,2003 PIPING LEADMAN
DUTIES AND RESPONSIBILITIES
* Spool pre-fabrication at the area near in the working site at WELL PAD
312 SSA.Fabrication of Swiftbend, flange to elbow that connect from wellhead
to main pipeline.
* Fabrication of pipe support on shearkeys, cross girder, pipe shoes, PSSP &
PSGP type.Fabrication of Counter Weight Support stiffeners, base plate,
flange plate & eye lug.Fabrication of CHRISTMAS TREE support including
collar.
* Spool pre-fabrication of pipe to flange, pipe to elbow & pipe double ending
and also lateral type.
ERECTION WORKS:
* Erection of fabricated spools & swiftbends from laydown area to WELLPAD 312
SSA to their final position & elevation.
*Erection of fabricated spools of 20 & 10 stainless steel pipeline at upper
MAHIAO DISPOSAL SYSTEM to their final position & elevation.
* Erection of fitted spools of 24 Re-Injection line cross country piping to
the final position & elevation.
FINAL FIT-UP AND INSTALLATION:
* Final fit-up & installation of steam pipeline from WELL PAD 312 SSA to
TP-30 G1-300-21 main pipeline.
* Installation of pipe supports such as shearkeys, cross girder, pipe shoes PSSP,
PSGP types.Installation of Counter Weight Support base to the
designated location.And also installation of Christmas Tree support to the
wellhead.
* Final fit-up & installation of 20 and 10 stainless pipeline at upper
Mahiao Condensate Disposal System.Joints fitted are trimmed elbow to pipe,
pipe to flange, and pipe double ending.Drain pot is also included in the
pipeline.
* Replacement and final fit-up of 24 Re-injection line Cross Country piping
from joint 1 to joint 58 of South Sambaloran R.I. line.Joints fitted are pipe
double ending, elbow to pipe, pipe to flange and reducer to pipe.(LPD) is also
installed in the pipeline.
PUNCHLISTING WORKS:
Final inspection at WELLPAD 312 SSA and replacement of all temporary bolts,
nuts & gasket and the correct orientation of the handwheels and also the
correct pipe support installed such as:pipe shoes, counter weight support
christmas tree support as per drawing specification.Hydro testing or
flushing is also needed before final acceptance.
MERALCO INDUSTRIAL ENGINEERING SERVICES CORP.
PASAR TURN AROUND PROJECT
LEYTE INDUSTRIAL DEVELOPMENT ESTATE
ISABEL, LEYTE PHILIPPINES
MAY 5, 2002 TO SEPT.30, 2002 PIPING LEADMAN
DUTIES AND RESPONSIBILITIES:
FABRICATION WORKS:
Fabrication of blind flanges 60, 42 and 30 diameter to be used in air leak
testing.Fabrication of sulfuric acid pipeline, pipe to pipe double ending
and pipe to elbow 42 and 30.
DIMOLITION WORKS:
Cutting and removed top cover of HEAT EXCHANGER VESSEL at HE-J #61, 63,
and 81.Cutting and removed welded man hole of the vessels.Cutting all
damage pipe supports at Acid Plant package 3 and replace.Cutting out of
window opening of the vessels, for man hole or passage purposes.
Backlash and worn-out all damage tubing inside HEAT EXCHANGER VESSELS
58, 61, and 81.
ERECTION WORKS:
Erection of 1" pipes to be replace of all damage pipes inside the heat
exchanger vessel and retubing.Erection of top cover of the vessel and return to
the normal position.And also erection of fabricated plate for replacement of
the cutted window opening.
FINAL FIT-UP AND INSTALLATION:
Install and retubing of 1" pipes inside heat exchanger vessel.Declogging of
all clogged-up tubing of the vessel.Final fit-up of the cover and fabricated
plate of the window opening of the vessel and full welding.Install temporary
blinds for air leak testing purpose.Removed all temporary blind after air leak
testing and fit-up install the final blind flange.
DAELIM SAUDI ARABIA CO.LTD
ARABIAN PETROCHEMICAL COMPANY
OLEFINS III PLANT
JUBAIL INDUSTRIAL CITY K.S.A
SEPT.25, 1999 TO SEPT.24, 2000 PIPE FITTER A
DUTIES AND RESPONSIBILITIES
FABRICATION WORKS:
* Spool pre-fabrication at fabshop area and checking of materials base on bill of
materials as per drawing specification .All materials and fittings needed in
the drawing such as pipes, elbows, flanges, sockolets, weldolets will be
withdraw.We assemble and fit-up that base on the isometric drawing.
* Spool pre-fabrication of hot blow down, low pressure steam,process
condensate, quench water, dilution steam pipelines, joints fitted are:elbow
to pipe, flange to pipe, pipe to pipe double ending including sockolets and
weldolets.Pipe diameters are:24, 20, 14, 8, 6, and4
standard in schedule.
HANDLING WORKS:
Hauling of fabricated spools from fabrication shop to field area at OLEFINS III
piperack and segregation base to the nearest column and orientation.
ERECTION WORKS:
Erection of fabricated spools at piperack that base on their elevation and
orientation.Spools erected are:Quench Water pipeline, Low Pressure
Steam Condensate, Hot Blow Down, Dilution Steam, Cooling Water
Supply, Medium Pressure Steam Condensate, Process Condensate, &
Low Pressure Steam.Diameter of pipelines are:20, 18, 14, 8,
6, 4, 2,and 1 .
FINAL FIT-UP AND INSTALLATION:
Final fit-up and installation to their designated pipeline position from ground
level to above level elevation and orientation,including pipes support, pipe to
pipe joints, pipe to fittings, fittings to fittings.Fabricated spool to nozzle of the
vessel, bolting is also included in flange to flange joints, and also installation of
gasket.Cutting,grinding, beveling, treaming of excess measurement of
fabricated spools and random pipes.Total alignment, leveling, straightness set-
up on center to center distance, arrangement in long run piping at pipe rack,
prior for welding works.
PUNCHLISTING WORK:
Replacement of all temporary bolts, knots, and gasket after hydro testing.Final
installation of valves to the correct description and orientation of hand
wheels.Also included the correct pipe support installed, such as:pipe
guide, U-bolt, miscillanous pipe support, pipe shoes and gusset support
for small branches of pipeline.Removed all tack welds of the pipelines.
PNOC ENERGY DEVELOPMENT CORP.
TONGONAN, KANANGA LEYTE, PHILIPPINES
AUGUST 24, 1994 TO JULY 15, 1999 PIPE FITTER A
DUTIES AND RESPONSIBILITIES:
FABRICATION WORKS:
* Spool pre-fabrication and checking of materials base on bill of materials as per
drawing specification.
If all materials and fittings are available such as pipes, elbows, flanges,
sockolets, weldolets,and others, we assemble that base on isometric drawing.
Some particular diameters are:big bore and small bore with their designated
thickness from 80, 60, 40 and also standard schedule.All pipelines are mostly
carbon steel.Also fabrication of pipe shoes, PSSP and PSGP type, cross girder
and shear keys.
HANDLING WORKS:
Hauling of fabricated spools, pipe shoes and girder from fabrication shop to field
area and segrigation to their pipeline position, to well pad, to separator
vessel and to yard area.
FINAL FIT-UP AND INSTALLATION:
*Final fit-up and installation of steam pipeline from well pad 503 (well 514D)
14 schedule 80 joint # 1 to joint 21 including one (1) set of PTA (Pressure
Tapping) two (2) sets of SPB (Sample Points) and one (1) set of LPD (Low
Point Drain) 45in position.Bolting is also needed in flange to flange joints
*Final fit-up and installation of steam pipeline from WELL PAD 503 (WELL PAD
515D) 12 schedule 80 from joint 1 to joint 21 including one (1) set HPV
(High Point Vent) two (2) sets SPB (Sample Points) one (1) set LPD (Low
Point Drain).
*Final fit-up and installation of steam pipeline from separator of 501 to Re-
Injection line to 502.Pipelines installed are:24, 20, 18, 16 14
*Final fit-up and installation of steam pipeline from steam header of 509 separator
to main plant steam turbine and also installation of drain pots including
steam trap.Pipe installed are:36, 30, 24, steam traps are 1 and
.
*Installation of pipe support such as:cross girder, pipe shoes, support head,
christmas tree support and counter weight support that base to their
position and location.Bolting is also included in flange to flange joints.
PUNCHLISTING WORKS:
Replacement of all temporary bolts, knots and gasket.Final installation of valves
to the correct orientation of hand wheels.Also including the correct pipe
support installed such as:pipe shoes,vertical support, angle bar support
and other supports as per drawing specification.Hydro testing or flushing
is also needed before final acceptance.