SUMMARY
Hijran is a Sr. Civil/Structural Engineer with twenty-seven years of experience in the design and construction of heavy industrial projects and in the oil & gas industry. He has solid experience in the Dynamic of Soil and Foundation Analysis and Design using Dyna 6 in combination with SAP2000, knowledge of advanced structural analysis, seismic analysis, and finite element modeling (Dyna6, SAP2000, SAFE7, STAAD Pro, Ansys, Tekla, S-Frame and S-Steel, etc.). He possesses diversified experience in Civil/Structural Engineering (Static/Dynamic Analysis & Design –Steel and Concrete). Hijran is experienced in project management and manipulation of management tools (MS. Project & Primavera). He is well versed in 3D AutoCAD and 3D Studio and has worked with many 3D modeling software such as 3D Steel Pro, Smart Plant, NavisWorks and MicroStation.
EXPERIENCE
Feb 2009 – Jun 2015
Lead Structural Engineer, WorleyParsons, Markham, ON
Imperial Oil Alliance, Nanticoke refinery lead engineer responsible for design civil and structural works
SHELL-Keel Distribution Terminal
Senior Structural Engineer, WorleyParsons, M&M Mississauga, ON
Kansashi Mining Project, Zambia Senior Engineer responsible for design flooring system for 17 floors Cooper Isasmelt Building. The design include heavy steel plate girders, flooring layout for heavy equipment, Crane girders, detail steel connections, conveyor supports and trusses
Senior Structural Engineer, WorleyParsons, Markham, ON
Bruce Nuclear Power-Water Demineralization Plant
Design concrete slab on grade for Demineralization building, which performs as flooring system, heavy -truck pavement and equipment’s foundation. The design include main water collection tank and drain trenches with heavy steel cover system. Work also included design module steel pipe rack
Consumers’ Cooperative Refineries Ltd, Expansion Project –Section V & Revamp – Regina, Saskatchewan Perform dynamic analysis and design for gas compressor elevated concrete foundation and design compressor shelter steel building structure inclusive concrete pile foundation for Platformer Unit. Act as sub-lead engineer for U&O pipe package, design and retrofit existing pipe racks, platforms and both shallow and deep foundations. The work also includes substation building and many platforms.
2006 –2009
Sub-Lead Civil/Structural Engineer, Bantrel Co., Mississauga, On
Suncor Voyageur, Fort McMurray, AB Responsible for bio-treatment plant package, I have performed dynamic analysis for main underground concrete fore-bay tank supporting three pumps, two of them run by vertical motor and the third pump run by horizontal steam turbine. We conducted site visit to Oakville treatment plant. The work included surrounding pipe racks and platforms
Shell Scatford Upgrade 1, HMU Unit, Fort Saskatchewan, AB. Civil/Structural engineer responsible for design the reactor main concrete foundation supported on 156 H-Piles of Hydrogen manufacture unit. Work includes all foundation for reformer and combustion ducts and other miscellaneous equipment. Dynamic analysis for both flue and combustion gas fans, they were the biggest in north America. Design underground contaminated sewer system and underground oily water pipes
2005-2006
Civil/Structural Eng., SNC Lavalin Engineering & Constructors, ON
Imperial Oil – Sarnia Refinery Design combined spheres spill containment concrete dikes, pipe racks/platforms, retrofitting ship loading dock, reinforcing existing structures, design connections for anti-blast shell around administration buildings and design truck scale
LANXESS/Bayer Forth Extension Transformer foundations, platform structures, building modifications, supporting steel frames & drainage system
20001-2005
Civil/Structural Engineer/Senior Project Engineer, Panflex Sdn Bhd
Mont Kiara- Condominiums project In Kuala Lumpur Two blocks of high rise buildings modified from moment resistance frame to shear wall system
Damansara Pandan Project in Kuala Lumpur 6 Blocks of High Cost High-rise (28 Floors) Commercial Buildings with Shopping Mall, 60 Mil US$ and 2 Car Park Blocks of 6 Floors Each
2000 - 2001
HAS. Gamilang Sdn Bhd/Johor Corporation, Malaysia
Pasir Gudang Sanitary Landfill – Johor, Malaysia Assigned as consultant engineer to supervise and modify the design process for the landfill. I have act as direct manager for project execution beside performed following duties:
Design future expansion cell including all the utilities and facilities, design paneling system, select and design the lining system for the project, design HDPE lining system for aerator treatment ponds, select material and design leachate collection system, design temporary storage facilities, design earth reinforcing system, design sheet piles and develop master plan for work execution (complex process when dealing with geo-synthetically clay liner in tropical climate
1996 - 2000
SMHB Consultants, Kuala Lumpur Malaysia
Kuala Lumpur international Airport (KLIAB) Mega project Assistant resident civil/structural engineer for utilities package (Water, waste water, telecommunication, low pressure gas and waste water treatment plant.
1992 – 1995
Alrustamia Waste water treatment plant, Baghdad, Iraq
Civil Engineer- study bacterial activity of activated sludge system, modify the screw pumping system, design and retrofit hydraulic structure within the plant and evaluate the efficiency of the plant
1988 – 1992
Techorp-Bechtel, Baghdad, Iraq
Petrochemical complex two Ethylene Unit Field Engineer/Project engineer- construct foundations for heavy vessels, prepare weekly and monthly reports, design field modifications and cost control.
EDUCATION
Master of Engineering in Civil Engineering, Ryerson University, Toronto, Canada
Bachelor of Science, Civil Engineering, University of Technology, Baghdad, Iraq
REGISTRATIONS/AFFILIATIONS
Professional Engineers Ontario
APGGA
Ontario Society of Professional Engineers
ASCE Member
SEI Member
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES
Post Graduate Courses in Structural Engineering (6 Courses)
Diploma in Computer Science
Advance Courses in Water Resource Engineering (9 Courses)
Post Graduate Courses in Project and Construction Management (3 Courses)
Comprehensive training and obtained certificate on “InRoad” software
Dale Carnegie Leadership Certificate (3Months training)
Alberta Construction Safety Association
Imperial Oil Basic Safety Training
Workplace Hazardous Materials Information System (WHMIS)