OBJECTIVE

Seeking a position in the industrial electrical field using my extensive knowledge and successful experience.

Functional summary

* Experienced with PLC's: AB5, SLC500, GE, TI, Contrologix, Siemens

* Extensively used the National Electrical Code Book (NEC) since 1988 to 2015 for Residential, Commercial, Industrial, along with supervising as many as 33 journeymen electricians on one job site.

* Extensively used the National Fire Protection association (NFPA) Book.

* Developed "Level 3" drawings of industrial control panels, layout, relay logic, electrical schematics, ladder logic drawings and 480 Volts and 208 three phase. Power Distribution, Various types of conveyor systems.

* Substations 138Kv & 345Kv.

* Contracted and selected sub-contractors for assembling and manufacturing of project.

* Created demolition and installation drawings showing conduit riser diagrams.

* Designed electrical systems including part specifications and selection.

* Autocad computer drafting.

WORK EXPERIENCE

Electrical Engineer

March 2015 - July 2015

Apex Corporation (project contract position) Sears Holdings Hoffman estates Il

Engineering Services

Electrical engineering designs including but not limited to load calculations, single-line diagrams and panel schedules. Must have very good understanding of electrical building systems, for new and existing structures and substantial field survey experience. Must be able to interpret International / National Electric Codes, and correspond with Authorities Having Jurisdiction to determine design criteria.

Industrial Electrician

June 2014 - March 2015

Jernberg Industries, Inc. Chicago, Illinois

Manufacturing - Other

Responsible for 16 production lines troubleshooting maintenance, in large facility. 450 employees, 3 shifts, 24/7 production, on call. New equipment removal, and installation.

Electrician,

Electrical Designer 2

December 2011 - June 2014

Sargent & Lundy, L.L.C. Chicago, Illinois

Energy and Utilities

Design experience in laying out control rooms including cable tray layout and parts selection

138kv and 345kv switchgear design experience

Responsible for supporting Project and Electrical Engineers.

A smart grid is an electricity delivery system that uses smart switches and smart meters to communicate with ComEd. Installation of these new technologies ultimately creates a stronger, more reliable electric system and provides customers with better service and greater control over use.

Using AutoCad11 and Raster engineering software to up-Dating ComEd drawings.

Electrical Designer 2 prepares various design deliverables under minimal supervision, begins to plan project related tasks and provide technical guidance to others, exercises discretion and uses independent judgment. Using AutoCad11 and Raster engineering software to up-Dating ComEd drawings, Updating revisions using company and customer drawing procedures. Power Delivery Division, Power plants, Substations, 138Kv & 345Kv, Coal, Combustible Gas, Green renewable energy. Using SCADA application. Ability to develop schematics from one and three line diagrams. Knowledgeable of fuse and circuit breaker coordination. Familiarity with SEL and GE protective relays. Understanding of design drafting practices and engineering systems utilized in the power done to applicable CAD and engineering standards.

AutoCAD, excel,

Certified Industrial Electrician

November 2010 - December 2011

Caterpillar Aurora Illinois Plant Aurora, Illinois

Manufacturing - Other

Industrial machine maintenance of production machinery. Production personnel input maintenance concerns on local computers. Then equipment down ticket is issued into system. Duties consist of accessing plant maintenance program located on computers throughout very large facility. Then repairing mechanical and electrical problems, ordering replacement parts from storage, frequently delivered to site. Certified to work with live power under 600 volts.

Was responsible being the only 3rd shift electrical Tech from 10pm to 6am.

Caterpillar Certifications and licenses.

1) The Principles of Operator Safety for Aerial lift, Platform Lift, and Sit down counterbalanced forklifts.

2) The Principles of Operator safety for Mobile Cranes and Hand Signals, Applied Rigging Practices, Load Chart Comprehension.

3) NFPA 70E Arc Flash and Lockout - Tag out.

4) Responsible for writing Confided space permits. Planning, performing Confided Space work..

Electrician, Welding/Cutting Torch,

Electrical and Mechanical Technician

September 2007 - November 2010

Rexam Cap Can Elk Grove Village, Illinois

Food and Beverage Production

Electrical and Mechanical Technician, for a very large beverage can company. Rexam built a state of the art experimental prototype automated production factory. For new aluminum, resalable beverage cans. Main duty is 12-hour night shift from 7pm to 7am. Nonstop production schedule 24/7.

Electrical Troubleshooting,

Electrical Designer (on Contract)

October 2006 - September 2007

ISPEN INTERNATIONAL INC Rockford, Illinois

Manufacturing - Other

Electrical design of industrial control panels for large Heat treating furnaces for hardening rocket and space shuttle parts for N.A.S.A. project. Using auto cad electrical design software, ISO 9001 procedures, SyteLine software database.

AUTO CAD on contract

September 2005 - October 2006

Diamond Machine Works Arlington Heights

Manufacturing - Other

Design Electrical Wiring schematics for new automated pharmaceuticals Machines. Programmable logic controllers Allen Bradley, Rockwell Automation International, Control logix. Medium 480 volts and 240 volts 3 Phase 220 and 120 single phase voltage. Servo Motors. Knowlege of Hydraulic and Pneumatic systems.

Final Inspection

February 2003 - December 2005

Precision Quincy (on Contract) Woodstock, Illinois

Manufacturing - Other

Department Head of Final Inspection Oven Testing.

Large walk-in Industrial and laboratory state of the art, ovens, natural gas, propane, and electrical. Enviromental exhaust treatment furnaces.

CERTIFICATION

Power Plant Fundamentals

January 2012

Sargent and Lundy

Mitsubishi A-Series Programmable Controller

May 1996

Mitsubishi training Course

Mitsubishi A-Series Programmable Controller (PLC Programmer)

NFPA 70E/Arc Flash and Lockout/Tagout

December 2010

James Kelsey Lickiss

Requirement for Certified Electrician

Mobile Cranes and Hand Signals

December 2010

James Kelsey Lickiss

The Principles of Operator Safety

Aerial Lift/Platform Lifts and Counterbalanced forklifts

December 2010

James Kelsey Lickiss

Cherry Pickers 2 people lift baskets

Vendor Documents and Drawing Management Process

December 2011

Sargent And Lundy

Power Plant Fundamentals: Overview

January 2012

Sargent and Lundy

Power Plant Fundamentals: Environmental Controls

February 2012

Sargent and Lundy

PDHs:1

Power Plant Fundamentals: Power Block Boiler/Power Block Turbine

January 2012

Sargent and Lundy

Power Plant Fundamentals: Renewables

March 2012

Sargent and Lundy

Solar Power, and Wind Power Turbines

SKILLS

AutoCad 2011 Electrical

Expert

PLC Programmer

Intermediate

Micro soft Word

Expert

Industrial Electrician

Expert

Microsoft Excel

Expert

Allen Bradley Panel View Programmer

Intermediate

PLC-5 RSLogix5

Intermediate

PLC-500 RSLogix 500

Intermediate

PLC-5000 RSLogix 5000

Intermediate

RSnetWorx for DiviceNet

Beginner

RSnetWorx for Control Net

Beginner

RSNetWorx for Ether Net/IP

Beginner

Panel Builder 32

Beginner

Panel Builder 1400 E

Beginner

RS View Studio

Beginner

LANGUAGES

English

Fluent

PROFESSIONAL MEMBERSHIPS / AFFILIATIONS

YMCA

HONORS & AWARDS

Swimming Instructor

CAREER HIGHLIGHTS

Has worked as an Electrical, Instrumentation and Controls Technician in support of engineering assignments, primary in the field with manufacturing plants. Responsibilities included physical electrical design (i.e. conduit routing, raceway design, electrical installation needs, construction packages reviews, etc.), control panel design, control panel bill of materials, internal power wiring, I/O schematics and point to point wiring, instrumentation troubleshooting, checkout, startups, field maintenance, on call coverage and control systems work. Experienced with field electrical work and has supervised up to 33 journeymen (electricians) in completing electrical construction work. Can interpret and interface between engineering and contractors.

INTERESTS

Ballroom Dancing - Level Bronze dancer, Riding Bicycle around trails, and along lake michigan., Zumba Exercise dancing, Volunteer for a Men homeless support group.

REFERENCES

Lauren Leifer

President, LRL Consulting

239-***-****

Lauren@newmarketvis

Professional

Mike Gonia

Engeneer, Diamond

630-***-****

Professional

Paul Ainley

Caterpillar Aurora Illinois Plant

815-***-****

Personal



Contact this candidate