RESUME
ASIF HUSSAIN
****-*** ******** **. ****** NE,
Calgary, Alberta, Canada
Contact # +1-403-***-****
E-mail : ***************@*****.***
Applied for the post of: Civil/Arch/Structural Designer
CAREER OBJECTIVE
Intend to build a career with a leading corporate in a technically superior environment with committed & dedicated people, which will help me to explore myself fully and to realize my potential. Willing to work as key player in a challenging & creative environment.
QUALIFICATION
Professional Qualification:
B.E. civil (Evening) From Jamia Millia Islamia, New Delhi in 2007 to 2011
Diploma in Civil Engineering From Jamia Millia Islamia, New Delhi in 2003 to 2006.
Academic Qualification:
12th C.B.S.E. (Kautilya Sarvodya Bal vidyalya) in 2003 New Delhi
10th C.B.S.E. (Government Boys Sr. Sec. School) in 2001 New Delhi
DESIGN/ENGINEERING SOFTWARE SKILL
Microstation (Expert)
Frameworks Plus (Expert)
Revit (Expert)
TEKLA Structures (Expert)
SMART PLANT REVIEW (Expert)
MS Office (Expert)
Auto cad (Expert)
In-roads (Expert)
Civil 3D (Expert)
Project wise (Expert)
Staad Pro (Expert)
Nevis works (Expert)
SP3D (Had training)
Pdf writer (Expert)
Info-works and Wrench (Expert)
SUMMARY OF EXPERIENCE
More than 8 years of professional experience structural engineering projects in the field of Oil Gas & chemicals, mining, Water, infrastructure and pipeline projects. The experience includes Concrete detailing, modelling & prepare the final drawings for execution including Foundations and piling drawings, civil grading drawings, location plans, shelters, commercial buildings, high rise residential and commercial buildings etc.
Having a good experience working on construction site.
Capable of doing multiple projects at the same time.
ORGANIZATIONAL EXPERIENCE
1.Amec Foster wheeler, Calgary, Canada
Intermediate structural Designer
07-Aug 2012 to Nov 27 2014
PROJECT HANDLED
a) Kearl fine tailings treatment plant (Kearl Project), Imperial oil, canada
(7 Aug. 2012 to Dec 2014)
Job Responsibilities:
3D-modelling in PDS (frame works) of concrete & steel of various buildings, piperacks, MPS etc of many facilities including group naming and member naming.
Done concrete detailed drawings for Pipe racks & G.A. Drawings, thickener foundation drawings, MPS, monorails, e-houses, vfd buildings, rupture discs, transformer foundation drawings, pile drawings, steel, concrete Anchors, pump foundations, sump pumps and many other structures.
Site engineering to support technical issue, provide detail sketches for steel, concrete, piling, culverts and ditches to resolve technical query from contractor, response to contractors (Kiewit, PCL, HCBI, Pacers) RFI’s . Review and checked shop drawings.
Inter discipline clash resolving and make reports.
Preparation of Architectural drawing for many commercial buildings in the facilities.
Member naming, group naming in frameworks and managing material take off spread sheets.
Dealing with RFIs and coordinating with site and providing soultions.
Very strong knowledge of shipping envelops and lifting lugs.
Checking of steel GAs, connection drawings and concrete design drawings.
Inter discipline coordination, attending inter discipline meeting and provided feasibility support.
Reviewing models and preparing reports.
Preparing steel drawings from PDS model extraction.
Prepared MTOs.
Squad checks.
Provided engineering sketch for various structures to put feasibility points.
Prepared structural detailed drawings for stair tower, stairs, cross-overs and many other structures.
Worked as a lead designer in the absence of lead and conversant with the procedure of issuing deliverables, distribution of work in team members and coordination with document control group.
2.Bechtel India Pvt. Ltd,
Designer (Civil/Structural)/ Trainee
July 2006 to sep-2008
PROJECT HANDLED
a) Sohar Aluminium Smelter Project, Oman.
31 July 2006 to 6 Oct. 2006
This project intended to develop facilities to extract Aluminium from its ores in Oman near the Sohar Port. Long span industrial sheds, long passageways for vehicular movement etc are the features of this project.
b) Scotford Upgrader Expansion Project, Shell Canada Limited.
9 Oct. 2006 to 7 Jan 2008
The Project involves the expansion Facilities at Scotford. The scope of work is divided into three areas namely Utilities and offsite, Sulphur Recovery Complex and Residue Hydro Conversion complex.
c) Worsely efficiency and growth (Worsely Alumina Pty Ltd).
8 Jan to 22 Sept. 2008
This project involves the expansion facilities at Perth from 4.5 Mtpd to 5.1 Mtpd.
Done detailed drawings for ow-sumps, grade slab, pumps, pile caps, vertical vessel, Exchanger, pile caps schedules, pile schedules, MPS, Stack foundations, rod and ball mill foundation drawings etc.
Done 3D-modelling in PDS (frame works) concrete & steel including tags closing.
Done transformer foundation drawings, bar bending schedule.
Done pile cap location plan, pile cap schedules & detailed pile caps drawings for pipe rack Area.
Extraction of drawings from PDS models in cooling tower, pipe rack, flare area & tank areas.
MTO tracking, Pds Model checking and coordination with other discipline.
Done steel location plan from PDS model extraction.
Prepared small MTOs, concrete estimation.
3D-modelling on Tekla structure (concrete & steel).
Preparation of steel GAs and fabrication drawings using Tekla structures.
Done many commercial buildings, high rise vessel plat forms, stairs and other structures.
Preparing 2D drawings using microstation.
Concrete modelling using frameworks for concrete and steel and preparing steel GA.
Preparing steel GAs and shop drawings
Importing sdnf file to frameworks plus for generating clash reports.
3.CH2MHILL India Pvt. Ltd,
Designer/ Engineer (Civil/Structural)
23-Sep 2008 to July 2012
PROJECT HANDLED
a)Dolphin Upstream and Compression Facilities
29 Sep. 2008 to 15 mar 2009
b)PIPE LINE, ADMA (ABU DHABI, UAE) & CABOT (FEED THAILAND)
1 Jan 2009 to 6 Dec. 2009
c)UMOE SOLAR – NEW BRUNSWICK, CANADA – POLYSILICON–FEED PROJECT
(10 Dec 2009 to 25 Mar. 2010)
d)Staff Engineer; Haryana Project (Yamuna Action Plan Phase III); PHED Haryana; State of Haryana, India; 2010-2011.
e)AHDEB OILFIELD SURFACE FACILITIES DEVELOPMENT PROJECT
(12 Dec 2010 to 3 March 2011)
f)Albustan (Potable & waste water treatment plant) Feed project
(3 Mar 2011. To 16 Jun 2011)
g)Aeroasia ( Unilver Industries Pvt. Ltd. )
(16 Jun 2011. To July 27 2012)
Various steel utility structures -PIPE RACK, Huge pumps and transformer shelters with crane installations, including connection, water retaining structures, Coffer dam, PITS, steel Pipe supports, big cooling towers & platforms using Auto cad and microstation v8.
Preparation of grading drawings using Auto-cad and microstation.
Preparation of detailed drawing various water retaining structures like, sumps, trenches and various buildings in treatment plant.
Coordination with the engineers for the extraction of erection drawing.
Preparing shop drawings
Training people on Microstation, PDS frameworks plus and SPR.
Designed, analyses and Prepared drawings hundreds underground valve operating pump with platforms, cage ladders, stairs etc in it.
Steel and concrete Modelling on frame works plus.
Preparation of architectural and general arrangement drawings of many commercial buildings.
Calculation of man hours and work sharing with Abudhabi office.
Worked a lead designer and have been leading a team of 4 designers.
Preparing shop drawings
Steel structure for Product handling and ware house building with concrete deck floors etc.
30m High Process structure with multiple floors supporting huge vertical & horizontal vessels.
Concrete foundations for the above structures and foundations for ground supported vertical vessels and pump foundations.
Grade slabs for various buildings.
Preparing MTOs and prepared the BOQs and calculate the cost of structural work.
Rewards
Award Received in diploma in civil Engineering for excellence for 2003-2006 batch
Rewarded in Bechtel for the best performing among Trainees.
Rewarded many times at CH2MHill for outstanding performances.
Rewarded at Amec Foster wheeler, Calgary for the outstanding performance in the thickener Team
Declaration
I hereby declare that the above mentioned information is correct up to best of my knowledge.
References
Tom Danks
Lead CSA designer
Nova Chemicals
Cell : 403-***-****
Email: ********@*****.***
Nader Cheragi, Phd. P.Eng.
Lead Structural Engineer
CNRL
Mobile : 403-***-****
Email : *********@*****.***
Mohammed Kawish Shaikh M.Eng, P.Eng
Lead Structural Engineer
Amec foster wheeler
Office: 403-***-****
Cell: 587-***-****
ASIF HUSSAIN