Post Job Free
Sign in

Project Engineer

Location:
India
Posted:
October 30, 2015

Contact this candidate

Resume:

Goutam Hota

E-Mail: **********@*****.*** Phone: +91-880******* (Mob)

Seeking assignments in project management, controlling and coordination.

Career Overview

Diversified 09 years’ experience in technical as well as commercial departments for Project Management, “Project Planning, Engg. Co-ordination with Consultants & Customer for Erection and manufacturing management with various vendors for project material, in Utility Power Plants” with L&T Power.

Skill Set

Project Management Process Improvement

Resource Management Team Management

Liaison & Coordination Vendor Management

Site Management/Execution Quality Assurance

ORGANIZATIONAL EXPERIENCE

Larsen and Toubro. Asst.Manager(Mechanical) Jan ’12 – Till Date

Present Project :- 3 x 660 MW Koradi TPS (extension) by Maharashtra State Generation Power Company(MAHAGENCO),Nagpur.

Spearheading various functions like project management, scoping, scheduling, planning and end to end implementation of 3X 660MW boiler.

Executing variety of tasks including setting deadlines, assigning responsibilities, monitoring and summarising progress of the project.

Reducing the exposure, risk on project and enforcing company’s methodology and project standards.

Preparing of method statements for erection of heavy lifts in boilers.

Preparing weekly, monthly and 3 month look-ahead schedules for steam generator construction activities.

Preparing and analysis of S-curves and MPR.

Review of vendor specifications and supplier bid qualifications.

Coordinating with client for technical clearances and material follow-ups.

Client invoicing & sub-contractor billing.

Drive knowledge sharing sessions and lessons learnt to prevent the defects in future.

Highlights

Completed hydro-test of 01 no. boiler in 18 months time from commencement of boiler erection.

Extra claims certified to the tune of 1.0 crore.

Achieved RosPa award.

Larsen and Toubro. Senior Engineer(Mechanical) Dec ’08 – Dec’11

Project:- 5 x 660 MW Thermal Power Project by M/s Adani Power Limited-Mundra(Kutch)

Erection in-charge for pressure parts, ducts, structure, pulverised fuel line and critical piping of super-critical boiler.

Made and performed the erection schedule and sequence of erection.

Pre-assembly & pre-erection checks as per field quality plan.

Witnessing of NDE and pre and post weld heat treatment as per specification and welding schedule.

Coordinating with client & customer for technical clearances and project-material follow-ups.

Assisting in trial runs and pre-commissioning and commissioning of individual systems in boiler.

Completion of facilities/systems and attending punch points.

Assisting during trial operation and performance guarantee test.

Attending client meeting and conducting sub-contractor meeting.

Submission of claims and certification of works from client.

Highlights

Successfully completed the construction activities and achieved boiler light-up in 22 months time.

Team was instrumental in bagging an incentive amount of 2% of the project value for early completion of hydrotest activity of boiler.

Project achieved profit margin of 30 percent.

Bagged appreciation letter for achieving high quality standards in construction of steam generator.

UltraTech Cement Engineer, Projects & Maintenance Jan ’06 – May ’07

Planning and periodically monitoring condition of cement mill, wagon tippler and auxiliary equipments

Maintenance of PD pumps, root blowers and conveying lines.

Ensure predictive and preventive maintenance to achieve desired run factor and production.

Maintaining inventory details of spare parts of ash handling system.

Monitor and control departmental budget for reducing inventory of spares.

Raising of purchase requisitions and involving procuring of materials.

Verification of civil bills.

Optimisation of manpower - Better utilization of human resources.

Managing warehouse operations and material handling of cargo ensuring optimum inventory levels.

Hiring of equipments and necessary manpower as per operational requirements.

Participate in Quality Audits to ensure Quality Standards.

Highlights

Implemented up-gradation projects for increasing output of cement mill by 3TPH.

Part of maintenance team in achieving the highest monthly and yearly cement production at JCW plant for the year 2006-07.

Zero demurrage achieved in Railway dispatch division of JHARSUGUDA CEMENT WORKS plant in FY 2006-07 and implementing Engine On Load (EOL) system introduced by railways.

UltraTech Cement Engineer, Projects & Maintenance Aug ’05 – Dec ’06

Project completed :- Installing of crusher house and auxillaries

Erection alignment and commissioning of hammerhead crusher, belt bucket elevator, vibrating screen, gearboxes, motors and belt conveyor structures.

Fabrication and erection of civil and mechanical structures.

Verification of drawings from designer.

Close monitoring of all the aspects of the projects comprising manufacturing of equipment by vendors / sub-vendors, inspection, transportation, receipt and proper storage at site.

Short listing of highly reliable vendors for indigenous and also erection contractor.

Execution of jobs civil and mechanical jobs at site as per schedule.

Verification of jobs and clearing of bills.

Preparing CAPEX review reports.

Co-ordination of CAPEX related materials.

Raising of purchase requisitions of capital and work-order type.

Completion of project in stipulated time and amount.

Inspection of materials and signing of Goods Receipt Note.

COMPUTER SKILLS

Hands on experience on SAP as an end user.

Primavera P6

Ms-Office

EDUCATIONAL PROFILE

PGDBA (Operations) from SCDL, Pune.

BE (Mechanical Engineering) from KIIT Deemed University, Orissa in 2005



Contact this candidate