Post Job Free

Resume

Sign in

Welder

Location:
Australia
Posted:
October 29, 2015

Contact this candidate

Resume:

Resume&for&Roderick&R.&Cañete&& & & *&

Roderick)R.)Cañete)

&

&

ADDRESS& & & & & MOBILE& & EMAIL&

2&Prism&Court&Woodroffe,&NT&0830&& 041*******& acr80e@r.postjobfree.com&

&

&

Tertiary)

Degree& :& Bachelor&of&Science&in&Industrial&Technology&

&&&School& :& Don&Mariano&Marcos&Memorial&Polytechnic&State&Colleges& Period& :& 1987&–&1989&

Secondary&

Degree 4&Years&Graduated&(High&School)&

School& :& Andres&Soriano&College&

Period& :& 1982&–&1987&

&

Company:& PECOFacet)–)MODULAR)ENGINEERING)COMPANY) PTY)LTD)

Position:& First&Class&Welder&

-& Tungsten)Inert)Gas)(TIG))

-& Manual)Metal)Are)Welding)(MMAW))

-& Metal)Inert)Gas)(MIG))

-& Flux)Cored)Are)Welder)(FCAW)&

Industry:& Fabrication&

Duration:& 21&May&2014&–&21&May&2015&

Location:& 37&Sparks&Roaf&Henderson&Perth&WA&6166& Contact&Person:& Jason&Ripp&

Operations&Manager&Australia&

Contact&Number:& 040*******&

Job&Description:& -& Welding&pressurized&vessels,&nozzle,&piping&butt&joint.&

-& Weld&Structural&Steelwork&like&Column,&Trusses&and& Plates,&using&Flux&Core&Arc&Welder

-& Perform&Fillet&Weld,&Butt&Weld&and&Groove&Weld&in&all& position&like&flat,&horizontal,&vertical&and&overhead.& Using&FCAW,&GMAW,&GTAW&and&MMAW&Welder.&

-& Weld&structural&steel.&

Employment Record

Educational Attainment

Resume&for&Roderick&R.&Cañete&& & & 2&

Company:& ALLTYPE)ENGINEERING)

Position:& First&Class&WELDER&

-& Tungsten)Inert)Gas)(TIG))

-& Manual)Metal)Are)Welding)(MMAW))

-& Metal)Inert)Gas)(MIG))

-& Flux)Cored)Are)Welder)(FCAW)&

Industry:& Fabrication&

Duration:& Nov.2013&–&March&2014&

Location:& 52&Hope&Valley&Road&Naval&Base&WA&6165& Contact&Person:& Norman&Milby&

Operations&Manager&Australia&

Contact&Number:& 08&94105333&

Job&Description:& -& Weld&Structural&Steelwork&like&Column,&Trusses&and& Plates,&using&Flux&Core&Arc&Welder.&

-& Perform&Fillet&Weld,&Butt&Weld&and&Groove&Weld&in&all& position&like&flat,&horizontal,&vertical&and&overhead.& Using&FCAW,&GMAW,&GTAW&and&MMAW&Welder.&

-& Weld&structural&steel.&

-& Weld&structural&like&chute,&column&for&mining&project.&

-& Mostly&we&weld&all&structural&jobs&for&this&company.&

&

Company:& PARAMAC)RECRUITMENT)PTY.)LTD)

Position:& First&Class&WELDER&

-& Tungsten)Inert)Gas)(TIG))

-& Manual)Metal)Are)Welding)(MMAW))

-& Metal)Inert)Gas)(MIG))

-& Flux)Cored)Are)Welder)(FCAW)&

Industry:& Fitti&Fabrication&

Duration:& June&2013&

Location:& Unit&1A/51&Erceg&Road&Yangebup&WA&6164& Contact&Person:& Mary&Rose&de&Pledge&

Operations&Manager&Australia&

Contact&Number:& 08&64616786&

Resume&for&Roderick&R.&Cañete&& & & 3&

Job&Description:& -& Weld&Structural&Steelwork&like&Column,&Trusses&and& Plates,&using&Flux&Core&Arc&Welder.&

-& Perform&Fillet&Weld,&Butt&Weld&and&Groove&Weld&in&all& position&like&flat,&horizontal,&vertical&and&overhead.& Using&FCAW,&GMAW,&GTAW&and&MMAW&Welder.&

-& Weld&structural&steel.&

-& Weld&structural&like&chute,&column&for&mining&project.&

-& Mostly&we&weld&all&structural&jobs&for&this&company.&

&

Company:& PHILLIPS)ENGINEERING)

Position:& First&Class&WELDER&

-& Tungsten)Inert)Gas)(TIG))

-& Manual)Metal)Are)Welding)(MMAW))

-& Metal)Inert)Gas)(MIG))

-& Flux)Cored)Are)Welder)(FCAW)&

Industry:& Fabrication&

Duration:& 26&April&2012&up&to&May&2013&

Location:& 5&Egmont&Road,&Henderson&WA&6166&

Contact&Person:& Joel&R.&Estipona&

Project/Estimator&Manager&

Contact&Number:& 94374100&

Job&Description:& -& Weld&Structural&Steelwork&like&Column,&Trusses&and& Plates,&using&Flux&Core&Arc&Welder.&

-& Perform&Fillet&Weld,&Butt&Weld&and&Groove&Weld&in&all& position&like&flat,&horizontal,&vertical&and&overhead.& Using&FCAW,&GMAW,&GTAW&and&MMAW&Welder.&

-& Weld&structural,&conveyor&for&Coliseum&Structure&

-& Weld&structural&like&chute,&for&other&project&

-& Mostly&we&weld&all&structural&jobs&for&this&company& and&just&some&piping&jobs.&

-& Interpret&mechanical&drawings,&welding&symbols,& dimensions,&cutting&list&and&materials&to&be&use.&

-& Safety&first&in&using&electric&drill,&grinder,&radial&drill& and&magnetic&radial&drill.&

-& Operates&safety&the&press&machines,&cutting&

machines&and&all&other&related&machines.&

-& Responsible&for&being&alert&physically&fit,&competent& and&reliable&while&on&the&job.&

-& Responsible&for&the&following&and&commending&safe& operating&practices&and&maintaining&good&

Resume&for&Roderick&R.&Cañete&& & & 4&

housekeeping&practices.&

-& Responsible&of&reporting&any&accidents&and&near& premises&promptly.&

-& Responsible&for&having&through&knowledge&of&their& machine&capabilities.&

Company:& TIDE)WATER)MARINE)INTERNATIONAL)

Position:& First&Class&WELDER&

-& Tungsten)Inert)Gas)(TIG))

-& Manual)Metal)Are)Welding)(MMAW))

-& Metal)Inert)Gas)(MIG))

-& Flux)Cored)Are)Welder)(FCAW)&

Industry:& Company&Ships&Maintenance,&Working&in&Offshore& Oilfields&at&Angola&bby&Chevron&Company&

Duration:& 14&December&2005&up&to&04&May&2010&

Location:& Malongo,&Luanda,&Angola&

Contact&Person:& Marc&Ericson&P.&Grande&

Vice&President&Operation&of&Pacific&Seaman&Services,& Incorporated&Agency&

Contact&Number:& +632&7444546&

Job&Description:& -& Maintaining&company&ships&working&offshore&oilfields.&

-& Repairing,&fabricating&and&welding,&by&offshore&or&by& inshore.&

-& Fabricating&the&pipes&to&be&replaced&from&the&boat&by& jigging&the&original&one&then&fit&the&new&one.&

-& The&metals&the&we&are&using&are&carbon&steel&/& stainless&steel&/&aluminum&steel&/&cast&iron&/&silver&/& brass&/&copper&and&etc.&

-& For&the&aluminum&job&we&are&using&the&weld&by&

tungsten&inert&gas&or&by&metal&inert&gas.&

-& When&cutting&the&pipes&I&used&the&circular&saw& machine&or&by&oxyeacetylene&gas&and&plasma&cutter&in& safely&cutter.&

-& We&doing&process&of&welding&by&(MIG)&Metal&Inert& Gas&/&Gas&Tungsten&Arc&welding&/&Shielded&Metal&Arc& Welding&and&Gas&Weld.&

-& Interpret&mechanical&drawings,&welding&symbols,& dimensions,&cutting&lift&and&materials&to&be&use.&

-& Safety&first&in&using&electric&drill,&grinder,&radial&drill,& magnetic&radial&drill.&

-& Operate&safety&the&press&machine,&cutting&machines& Resume&for&Roderick&R.&Cañete&& & & 5&

and&all&other&related&machines.&

-& Responsible&for&being&alert&physically&fit,&competent& and&reliable&while&on&the&job.&

-& Responsible&of&the&following&and&recommending&safe& operating&practices&and&maintaining&good&

housekeeping&practices.&

-& Responsible&of&reporting&any&accident&and&near& premises&promptly.&

-& Responsible&for&having&though&knowledge&of&their& machine&capabilities.&

&

&

Company:& FPSO)I)Floating)Production)Storage)Offloading))

(MODEC)VENTURE)1)(Elang)EPS)Pte.)Ltd.)

Position:& First&Class&WELDER&

-& Tungsten)Inert)Gas)(TIG))

-& Manual)Metal)Are)Welding)(MMAW))

-& Metal)Inert)Gas)(MIG))

-& Flux)Cored)Are)Welder)(FCAW)&

Industry:& Conoco&Phillips&(03e12)&Pty.&Ltd Elang&EPS&Pte&Ltd&

(Modec)&

&

Duration:& 11&March&2005&to&9&April&2005&

08&July&2003&up&to&03&October&2003&

&

Location:& Australia&/&East&Timor&Offshore&Elang&KAKATUA&and& KAKATUA&North&Fields&&

&

Contact&Person:& Filomena&T.&Ramos&

Assistant&General&Manager&of&Monsoon&Maritime&

Services&Philippines&Incorporated&

&

Contact&Number:& +632&525****-***&5224980&

Job&Description:& -& Ship&maintenance&as&a&welder&

-& We&are&a&special&survey&repair&team&of&the&ship.&

-& Weld&and&repair&for&peak&tank&and&replaced&the&rotten& and&corroded&portion&like&bulk&head&/stiffener&and& longeG.&&This&job&we&do&process&of&welding&by&

(FCAW)&Flux&Core&Metal&Arc&Welding.&

-& Weld&and&repair&ballast&tank&and&replaced&the&rotten& and&corroded&portion&like&bulk&head&/&stiffener&/&and& LongeG.&We&do&process&also&by&(FCAW).&

-& Weld&and&repair&off&take&line&of&the&ship&and&replaced& a&damage&portion&of&the&old&pipe&line.&&This&job&we&do& process&of&welding&by&TIG&and&ARC&with&a&100%&xe

ray&radiographic&test.&

-& Operates&manual&and&semieautomatic&welding&

equipment&such&as&Shielded&metal&Arc&welding&/&Flux& Resume&for&Roderick&R.&Cañete&& & & 6&

Core&metal&arc&welding&/&Gas&tungsten&arc&welding& machines.&

-& Operates&safely&oxyeacetylene&cutting&and&angle& grinder.&

-& Responsible&of&every&job,&we&much&have&always&a& safety&meeting&before&we&start&the&job&and&must&have& hot&work&permit&for&safety&reason.&

-& Responsible&for&being&alert&physically&fit,&competent& and&reliable&while&on&the&job.&

-& Responsible&of&the&following&and&recommending&safe& operating&practices&and&maintaining&good&

housekeeping&practices.&

-& Responsible&of&reporting&any&accidents&and&near& premises&promptly.&

-& Responsible&for&having&through&knowledge&of&their& machine&capabilities.

&

&

Company:& SKS)WOOD)Sendirian)Berhad)(Brunei))

Position:& First&Class&WELDER&

-& Tungsten)Inert)Gas)(TIG))

-& Manual)Metal)Are)Welding)(MMAW))

-& Metal)Inert)Gas)(MIG))

-& Flux)Cored)Are)Welder)(FCAW)&

-& 6G)and)6)GR)Position)Welder&

Industry:& Brunei&Shell&Petroleum&Offshore&(2004&Campaign& Project)&

Duration:& 21&May&2004&up&to&12&November&2004&

Location:& Kuala&Belait,&Brunei&

Contact&Person:& Attorney&Rogelio&A.&Dio&

Pacific&Ace&Human&Resources&Corporation&Agency&

&

Contact&Number:& +632&8523067&

Job&Description:& -& Working&offshore&at&Brunei&Shell&Petroleum& Company.&

-& On&board&at&Lewek&Conqueror&Barge&as&a&welder&and& working&on&the&platform.&

-& Also&onboard&various&services&campaign&operation& contracted&vessels&of&Brunei&Shell&Petroleum.&

-& We&do&repairing&pipe&lines&for&mechanical&jobs&and& for&the&structural&jobs&by&replacing&the&old&one&to&the& new&one,&by&using&process&of&Tungsten&inert&gas&

(TIG)&Welding&and&Shielded&Metal&Arc&Welding.&

-& Welding&Carbon&Steel&/&Stainless&Steel&Materials.& Resume&for&Roderick&R.&Cañete&& & & 7&

-& For&structural&jobs&I&operate&also&gauging.&

-& Welding&of&pipes&in&all&diameter&and&sizes&from&small& to&big&bore.&

-& All&butt&joint&pipes&welding&is&a&100%&xeray&

radiographic&test.&

-& Full&welding&of&carbon&steel&and&stainless&steel&pipe& in&Brunei&Shell&Offshore&with&100%&radiographic&test& xeray&in&varying&wall&thickness.&

-& Structural&works&are&conducted&with&the&ultrasonic& testing&(UT)&and&magnetic&Testing&(MT).&

-& Operate&and&control&welding&machine&/&grinder&

machine.&

-& Responsible&for&being&alert&physically&fit,&competent& and&reliable&while&on&the&job.&

-& Responsible&of&the&following&and&recommending&safe& operating&practices&and&maintaining&good&

housekeeping&practices.&

-& Responsible&of&reporting&any&accidents&and&near& premises&promptly.&

-& Responsible&for&having&through&knowledge&of&their& machines&capabilities.&&

&

Company:& DAEWOO)NIGERIA)LTD.)

Position:& First&Class&WELDER&

-& Tungsten)Inert)Gas)(TIG))

-& Manual)Metal)Are)Welding)(MMAW))

-& Metal)Inert)Gas)(MIG))

-& Flux)Cored)Are)Welder)(FCAW)&

-& 6G)and)6)GR)Position)Welder&

-& 1104)Welder)(Down)Hill)Hot)Tapping)&

Industry:& LNG&Nigeria&Train&3&(TSKJ&Project)&

Duration:& 9&September&2000&up&to&9&May&2002&

Location:& Bonny&Island,&Republic&of&Nigeria&

Contact&Person:& Bienvenido&Laus&Jr.&

Eureka&Personnel&Management&Incorporated&Agency&

&

Contact&Number:& +632&523****-***&5247886&

Job&Description:& -& Welding&of&sizes&of&pipes&from&small&bore&to&big&bore.&

-& Welding&of&different&classes&of&metal&carbon&steel&/& stainless&steel&/&chrome&alloy.&

-& Welding&of&live&and&pressurized&pipelines&by&1104& procedure&downhill&they&called&this&hot&tapping.&

-& Welding&in&fabrication&shop&for&the&materials&of&the& refinery.&

Resume&for&Roderick&R.&Cañete&& & & 8&

-& After&fabrication&we&go&to&site&for&fixed&in&actual&for& welding&and&build&the&refinery.&

-& Welding&of&all&position&such&as&flat&/&horizontal&/& vertical&and&overhead.&

-& Tack&weld&or&welds&components&and&assembles&

shielded&metal&arc&welding,&gas&metal&arc&welding,& flux&cored&arc&welding&or&gas&tungsten&arc&welding& process.&

-& Protect&myself&when&times&in&welding&for&my&own& safety&to&avoid&accidents.&

-& Determines&required&equipment&and&welding&method,& applying&knowledge&of&metallurgy,&geometry&and&

welding&techniques.&

-& Remove&rough&spots&from&work&piece&using&portable& grinder,&hand&file&or&scraper.&

-& As&a&welder,&it&is&my&duty&to&think&safety&always&while& I&am&performing&my&job.

&

&

Company:& MIDEAST)CONSTRUCTORS)LTD.)

Position:& First&Class&WELDER&

-& Tungsten)Inert)Gas)(TIG))

-& Manual)Metal)Are)Welding)(MMAW))

-& Metal)Inert)Gas)(MIG))

-& Flux)Cored)Are)Welder)(FCAW)&

-& 6G)and)6)GR)Position)Welder&

Industry:& Fabrication&Shop&for&Offshore&&&Onshore:& a.& Jacket&Project&for&Q.G.P.C.&offshore&–&P.S.&

2/P.S.3 963/11)&

b.& O.P.Q.L.&Project&for&offshore&(P2104/10

P2105/10)&

c.& Q.G.P.C.&Dukhan&Consolidated&Facilities&Project& d.& JGCeKELLOGG&Joint&Venture&&(LNG&Tank&Project&

Raslaffan)&

&

Duration:& 07&June&1996&up&to&27&AUGUST&1999&

&

Location:& Doha&State&of&Qatar&

Job&Description:& -& Welding&of&different&classes&of&metals/&steel&pipes& from&Big&bore&and&small&bore,&stainless&steel/&carbon& steel/&chrome&alloy,&pressurized&pipelines&for&offshore& and&onshore&w/&100%&radiographic&test&(xeray)&in&

varying&wall&thickness&and&pipe&diameters&as&

indicated&in&my&qualification&papers.&&

-& Also&welding&jacket,&module&bridges&for&offshore& Resume&for&Roderick&R.&Cañete&& & & 9&

platform&in&fabrication&yard,&w/&6eGR&process&of&

welding&w/&100%&ultrasonic&testing&(UT)&and&magnetic& testing&(MT)&and&some&butt&joints&with&different&kinds& of&groove&are&100%&radiographic&testing&(xeray)

&

Company:& AGAP)ARABIA)LTD.)

Position:& First&Class&WELDER&

-& Alloy)Tungsten)Inert)Gas)(TIG))

-& Manual)Metal)Are)Welding)(MMAW))

-& Metal)Inert)Gas)(MIG))

-& Flux)Cored)Are)Welder)(FCAW)&

-& 6G)and)6)GR)Position)Welder&

Industry:& Fabrication&Shop&for&Offshore&&&Onshore:& a.& Northern&Area&Projects&–&Zuluf/Safaniyah&Berri,& Upgrade&(Tanajib,&offshore)&

b.& B.I.&8192/59243e540&Marjan&Upgrade&(Tanajib,&

Offshore)&

c.& B.I.&8169&Hawiya&(ABQA/Q&onshore)&

d.& Petromin&–&Mobil&Yanbu&Refinery&Co.&Ltd.&

Duration:& 1992&to&1994&

&

Location:& Saudi&Arabia&

Job&Description:& -& Full&welding&of&carbon&steel&and&stainless&steel&pipe&in& Petromin&mobile&and&chemical&plants&with&100%&

radiographic&test&(xeray)&in&varying&wall&thickness.&

-& Also&welding&on&topside&platform&hookeup&installations& upgrade&on&offshore.

&

&

&

WA)OCCUPATIONAL)HEALTH)AND)SAFETY)(OHS))

14#January#2013#

Card&Number:&606824&

#

#

AUSTRALIAN)SKILLS)TRAINING)

Competencies&RIIOHS204A&–&Work&Safety&at&Heights&

#

#

AUSTRALIAN)SKILLS)TRAINING)

Competencies&MSAPMPER200C&–&Work&in&accordance&with&an&issued&permit& Competencies&MSAPMPER205C&–&Enter&Confined&Space&

&

&

)

Training

Resume&for&Roderick&R.&Cañete&& & & 10&

PNTI)(PHILIPPINE)NAUTICAL)TRAINING)INSTITUTE))

April#2003#

BASIC&SAFETY&TRAINING:&

-& Personal&Survival&Techniques&

-& Fire&Prevention&&&Fire&Fighting&

-& Elementary&First&Aid&

-& Personal&Safety&&&Social&Responsibility&

-& &

&

CONSOLIDATED)TRAINING)SYSTEMS,)INC.)

14#August#2003#

HUET&–&Helicopter&Underwater&Escape&Training&

&



Contact this candidate