Highlights of Qualifications:
Coordinating, planning, scheduling, and monitoring assigned engineering tasks
B.sc. In Industrial Engineering (Sharif university of Tech.)
Developed and maintained overall and detail schedules. Set up of Work Breakdown Structure in accordance with Execution Strategies.
Master of Construction Management and expert in constructing commercial and industrial projects
Constructive experience in tracking activities and deliverables progress, performing earned-value analysis and preparing progress reports
Periodic audits on contractor’s schedule performance and processes.
Maximize resource productivity by identifying and coordinating the supply of parts, materials.
Work with operations and the maintenance team to schedule and resource level all .
Coordination of reporting interfaces with other departments.
Maintained and developed project controls procedures and progress measurement etc…
Responsible for weekly/monthly progress reports
High literacy in Primavera Enterprise P6, MS Project and MS Office, Microsoft Enterprise Project Management.
Professional Experience:
Scheduler Coordinator
Savaria Co. (Mississauga, ON) Feb 2015 up to now
-Feb 2015 up to now- Service and Installation.
Maintaining and developing project controls procedures and progress measurement.
Senior Scheduler/ Planner April 2012– Dec 2015
Thyssen Krupp Co. (Calgary, Fort McMurray)
- Apr. 2012 – Dec. 2014. Kearl -Ore preparation Plant EPC Project
Defining appropriate milestones to measure the progress of each package and follow up of progress in a timely manner
Developing engineering construction schedule in different levels (II, III & IV) using Primavera
Report with corporate teams for project follow-ups
Preparing progress based on the earned value methodology
Interface with Project Manager with variances on schedule and cost, trends and cash flow problems.
Interface with Project Manager for problem solving issues or best solutions in terms of problems relating to cost and schedule.
Develop an effective maintenance plan, modify the plan for variations due to availability of resources due to operations, actual work completed or additional work requirements
Maximize resource productivity by identifying and coordinating the supply of parts, materials, special tools, external services and rental equipment while preparing relevant documentation
Assisting in preparation and issuance of weekly and monthly progress reports
Work with Lead Planner to ensure that control systems are adequate and are meeting reporting requirements.
Proposing solutions to project managers to correct identified variances in schedules
Project Coordinator
IRITEC (Iran International Engineering Company). (Tehran, Iran) 2004 – 2011
Steel Making Plant Expansion From 600000tons /Year to 1350000 tons/Year – EPC
Cold Strip Mill Expansion. Tandem Mill –EPC
Cold Strip Mill Expansion. Skin Pass –EPC
Cold Strip Mill Expansion. Batch Annealing –EPC
Developing schedules in different levels (II, III & IV) using Primavera
Updating detailed schedules and preparing manpower histogram and staffing plan
Leveling workload based on available resource capacity, maximize the utilization of resources
Preparing progress based on the earned value methodology
Interface with the applicable project management, in order to update schedules and contribute to the development of future look ahead plans/schedules and also resolving project execution issues
Develop an effective maintenance plan, modify the plan for variations due to availability of resources due to operations, actual work completed or additional work requirements
Providing work order, shipments order and reporting and providing discrepancies planning.
Prepare routine job plans and investigate work requirements, prepare logical breakdowns of work and sequence associated tasks, taking into account multi-craft alignment
Develop detailed work plans covering information, procedures and standards for maintenance activities in respective area
Maximize resource productivity by identifying and coordinating the supply of parts, materials, special tools, external services and rental equipment while preparing relevant documentation
Evaluate and estimate part costs.
defining appropriate milestones to measure the progress of each package and follow up of progress in a timely manner
Communicating regularly with engineering, procurement, contracts administration, and construction to understand the true status on projects and reflect findings schedules and reports
Interface with Project Manager for problem solving issues or best solutions in terms of problems relating to cost and schedule
PLANNER / SCHEDULER
Pars Keyhan Co (Tehran, Iran) 2003 – 2004
Combined Cycle Power Plant. –EPC
Updating detailed schedules and preparing manpower histogram and staffing plan
Leveling EPC project workload based on available resource capacity, maximize the utilization of resources
Preparing engineering and construction progress based on the earned value methodology
Interface with the applicable project management, engineering and procurement personnel at home office and contractors at site in order to update schedules and contribute to the development of future look ahead plans/schedules and also resolving project execution issues
EDUCATION:
1996-2002 B.Sc. in Industrial Engineering at the Sharif University of Technology (Tehran–Iran)
Computer Applications:
Computer proficiency in MS office, Primavera 6, SAP.Liaise with single shipper and Newalta owned facilities to manage crude oil logistical movements, coordinate financial transactions and information sharing with single shipper
•Develop and sustain strong relationships with internal groups, shippers, producers and other pipeline companies
•Nominate, manage and communicate shipper positions according to industry timelines
•Support optimization activities by providing pricing/netback calculation support to improve profitability of facilities
•Conduct reporting related to crude oil marketing activities and analysis as required
•Provide assistance to increase facility throughput
•Help establish crude oil marketing processes and build software infrastructure