Ronnie Dela Vega Tabamo

Block **, Santa Cruz,

Tarlac City, Philippines

**************@*****.***

Contact No. +971-*********

Profile:

Licensed Civil Engineer with Philippines Regulatory Commission (PRC)

Registration No.0085665. Hard working and responsible team player with

Over 18 years experienced in different construction industries both

Local and Overseas employment.

Education Attainment:

Bachelor of Science in Civil engineering – With PRC- Licensed No. 0085665.

Member of Philippines Institute of Civil Engineers (PICE) – Tarlac Chapter.

Personal Skilled:

Computer literate (MS Word, Excel, Power point, Basic Auto Cad), QA/QC

Documentation, Erection of High Rise Building.

Safety Training and Seminar Attended:

Basic Permit to Work Training Course/ Enrollment No. 918144 – Conducted by ADCO Trainor (Kevin Maguire) @ NEB Auditorium Hall, Al Dabbiya. (June 10-11, 2015)

Pre-Assessment to PTW - Conducted by ADCO Trainor (Ismael Hamid) @ NEB Conference Room Al Dabbiya. (June 07, 2015)

H2S/BA Awareness Training Course – November 22, 2014. Conducted by Gulf Technical & Safety Training Centre. (SN: GTSC/45668/14).

Lock-out/Tag-out (LOTO) Training Course (ID # 00275) – March 25, 2014 Conducted By Alpine Safety Department. Borouge Polymers Plant site.

Basic Occupational Safety and Health Training Course – July 18-22, 2011 (40 hours)

(BOSH-11-23-1080, Accredited by Department of Labor and Employment.

NCR, Manila Philippines.)

Supervisor Incident Preventive Program (SIPP) – Conducted by Chicago Bridges & Iron Company (CBI) – Ruwais Abu Dhabi, U.A.E.

Part 1- Health Safety & Environment Training for Supervisor

(December 05-07, 2010 (30 hours)

Part 2- Construction Safety Training for Supervisor

(December 08-09, 2010 (20 hours)

Basic Rigging Training Course – October 14, 2010 (10 hours) – Conducted by Chicago Bridges & Iron (CBI) - Ruwais Abu Dhabi, U.A.E.

Scaffolding Safety Training Program - October 13, 2010/ Ruwais Abu Dhabi, U.A.E.

Ladder Safety Training Program - October 13, 2010/ Ruwais Abu Dhabi, U.A.E.

Fall Protection Training Program - October 13, 2010/ Ruwais Abu Dhabi, U.A.E

Lock-out/Tag-out Training Program – October 2009/ Pampa Melchorita, Peru S.A.C.

Job Safety Analysis Training Program – February 2009/ Pampa Melchorita, Peru S.A.C

Basic Fire Safety Training Program – January 14, 2008/ Dammam, K.S.A.

Basic First Aid Training Program – February 25, 2006/ Ras Lappan, Qatar.

Quality Awareness and Inspection Training:

Quality Awareness for Supervisor Training Program - April 02, 2007

Dammam, K.S.A.

Company Quality Policy

Quality System Awareness

Quality Organization

Project Quality Plans

Discipline Inspection Requirements

Reports and Records

Structural Inspector Training Program – April 01, 2007 (4 Hours) - QCD-3-030 procedure. Dammam, K.S.A.

Civil Inspector Training Program – April 01, 2007 (4 Hours) - QCD – 3- 013 procedure. Dammam, K.S.A.

Work Experience:

Overseas Employment:

Date: September 26 – October 30, 2015.

Client: Abu Dhabi Company for Onshore Petroleum Explorations Ltd. (ADCO)

Consultant: Engineering Consulting Group. (ECG).

Name of Project: North East Bab Infrastructure Project/ P-118 (Al Dabbiya Admin. Complex)

Discipline: Construction Supervisor

Area of Responsibilities:

1.B7 – Administration Extension Building.

2.B17 – Fire Station Extension Building.

3.B24 – Chiller Yard Extension Building.

Responsibilities:

Checking of construction site prior to release Job Safety Checklist (JSC).

Assess all hazards/risks on construction site prior to release Permit to Work (Issuing Authority with PTW Self enrollment no. 918144.)

Responsible for monitoring progress of construction site in day to day activities, at the same time responsible for all raised request for inspection (RFI) by contractor prior to proceed activities.

Committed for implementation of Environment Safety and Health (EHS) of the construction site and to all contractor workers.

Date: August 29 to September 25, 2015.

Client: Abu Dhabi Company for Onshore Petroleum Explorations. (ADCO)

Consultant: Worley Parsons

Name of Project: New Power Upgrade Project (NPUP) on all ADCO site.

(Habshan, BAB – Site)

Discipline: QC – Civil and Structural Inspector

Area of Responsibilities:

1.Erection of New Overhead Tower & Lines (OHTL) for 132KV and 33KV.

2.Dismantling of existing Over Head Tower Lines for 132kv and 33KV.

2. Construction of Synchronous Static Compensator (STATCOM) Building.

3. Construction of Load Dispatch Center (LDC) Building.

4. Construction of Sub-Station Building – 132/33KV Gas Insulated Switchgear (GIS)

Responsibilities:

Review Method Statement of Erection of Overhead Tower Lines and

Dismantling of existing Overhead Tower Lines.

Supervising Erection & Dismantling of tower lines.

Checking of Boring depth of pile foundation.

Checking of Re-bars delivery on site and installation

As per project specifications.

Checking of concrete delivery prior for concrete pouring of

Pile foundations.

Checking of body extension ground assembly prior for erection.

Monitoring of application of concrete hardener for pile foundation.

Attending Request for inspection (RFI) in All NEW CONSTRUCTION BUILDINGS. From Backfilling & Compaction/ Application of water proofing primer, Membrane & Bitu Board/ Inspection of Re-bars and Installation/ Formworks levelness, Verticality, Cleanliness/ Checking of concrete delivery, Checking of concrete design mix, Slump, Ambient and Concrete temperature, Taking cube samples for compressive strength and durability test./ Setting-out of CHB line and dimensions/ Plastering, Painting and finishing work.

Committed for implementation of Environment Safety and Health (EHS) of the construction site and to all workers.

Date: April 11, 2015 - August 27, 2015.

Client: Abu Dhabi Company for Onshore Petroleum Explorations Ltd. (ADCO)

Consultant: Engineering Consulting Group (ECG).

Name of Project: North East Bab Infrastructure Project, (Al Rumaitha Complex.)

Discipline: Construction Supervisor

Area of Responsibilities:

1.B10 - Administration Building.

2.B12 – Industrial Building.

3.B13 – Guard House.

4.B18 – Mechanical Workshop Building.

5.B19 – Shared Facilities Building.

6.B20 – Electrical Workshop Building.

7.B22 – Sub-Station Building.

8.B23 – Water Tank, Pump Room & Chiller Yard Building.

9.B26 – Sewerage Treatment Plant (STP) Building.

Responsibilities:

Checking of Risk/Precautions on site prior to release Job Safety Checklist (JSC) and Permit to Work (Issuing Authority with Self enrollment no. 918144.).

Review the quality manual/ Project Quality Plan/Client Specification based on International Standards. (ISO 9001).

Checking of All Request for Inspection (RFI) related to civil work as per Method Statement and Inspection & Test Plan. From Excavation limit/ Backfilling/ Compaction Test (Using Sand Cone Method)/ Reinforcement bars Inspection and Installation/ Concrete design mix delivery on site,(Slump, Ambient and concrete temperature, Time travel, Taking cube samples on site for durability test and compressive strength test./ Formworks installations, Verticality, Dimensions, Levelness/ Setting out lines for concrete walls/ Fixing Accessories/ Installation of Water Proofing Primer, Membrane, Board/ Application of rust coat for plastering work/ Painting work/ Tiling work.

Committed for implementation of Environment Safety and Health (EHS) of the construction site and to all workers.

Date: December 10, 2015 – April 09, 2015.

Client: Abu Dhabi Company for Onshore Oil Explorations Ltd. (ADCO)

Consultant: Engineering Consulting Group (ECG).

Name of Project: North East Bab Infrastructure Project, (Al Dabbiya Accomm. Complex)

Discipline: Construction Supervisor

Area of Responsibilities:

1.B1 – Staff Accommodation extension Building.

2.B2 – Staff Restaurant and Kitchen Extension Building.

3.B3 – Laundry Building.

4.B4 - Table Tennis and Storage Building.

5.B6 – Contractor Accommodation Building.

6.B8 – Industrial Building.

7.B9 – Mosque Extension Building.

8.B11 – Sub-Station 2A Building.

9.B14 - Contractor Restaurant Extension Building.

10.B21 – Water Tank and Pump Room Building.

11.B25 – Sewerage Treatment Plant (STP) Building.

12.B27 – Sub-Station 1A and Chiller Yard.

Responsibilities:

Review the quality manual and Project Quality Plan based on International Standards. (ISO 9001).

Checking of All Request for Inspection (RFI) related to civil work as per Method Statement and Inspection & Test Plan. From Excavation limit level, Backfilling and Compaction Test/ Reinforcement bars Inspection and Installation/ Concrete design mix delivery on site, Slump, Temperature, Time travel, Taking cube samples on site for durability test and compressive strength test/ Formwork installation, Verticality, Dimensions, Levelness/ Setting out lines for concrete walls, Fixing Accessories/ Installation of Water Proofing Primer, Membrane, Board/ Application of rust coat for fire rated wall, Plastering work/ Painting work/ Tiling work.

Committed for implementation of Environment Safety and Health (EHS) of the construction site and to all workers.

Date: April 14, 2012 to October 30, 2014.

Client: Bo rouge Polymers Plant.

Consultant: Bechtel Company. (PMT)

Company: Chicago Bridges and Iron (CBI)

Discipline: Civil & Structural Inspector

Name of project: Construction of N3 project. – Non Process Building Train – 3.

Area Responsibilities:

1. B25 - Maintenance Workshop & Spare Parts Warehouse Building.

2.B26 - Product Warehouse Building.

3.B29 - Building Sub-Station Building.

4.B30 - Dry Chemical Storage Building.

5.B32 - Mosque Building.

6.B33 - Amenities Building.

7.B35 - Diesel Station Area.

8.B37 - Product Dispatching Office Building.

9.B42 - New Contractors Building, Paint & Sand Blasting Workshops Building.

10.B41 - Garage Building & Driver Facilities Building.

11.B42 - Chemical Storage Building.

12.B43 - Fabrication & Welding Shop Building.

13.B83 - PH Workshops Building.

14.B160 - Centralized HVAC Building.

15.B48 - Pipe Yard Area.

16.Construction of Asphalt Road, Parking, Drainages, Side Walk.

Responsibilities:

Review the quality manual and project quality plan based on the company affiliated and international standards. (ISO 9001)

Checking daily raised Request for Inspection (RFI) by the contractor related to Civil and Structural work. Start on Excavation limit level, Backfilling, Compaction and Testing (FDT – using Nuclear Gauge))/ Inspection of Re-bars and Installation/ Installation of Water proofing primer, Membrane, Board/ Formwork stability, Cleanliness, Levelness, Verticality/ Delivery of concrete on site – Mix Design, Ambient and Concrete Temperature, Slump, Taking cube samples for durability and compressive strength test/ Checking of setting out lines for every wall, Plastering & Accessories/ Painting work/ Tiling work.

Committed for implementation of Environment Safety and Health (EHS) of the construction site and to all workers

Date: April 30, 2010 to April 29, 2011.

Client: Abu Dhabi Gas Company (GASCO)/ 4th NGL Expansion project. (EPC)

Consultant: Worley Parsons.

Company: Chicago Bridges and Iron. (CBI)

Discipline: QA/QC – Civil and Structural Inspector.

Name of Project: 4th NGL Expansion project.

Area of Responsibilities:

1.Naphtha tank (2) “90,000 cubic meters capacity”

2.Butane tank (3) “110,000 cubic meters capacity”

3.Propane tank (3) “110,000 cubic meters capacity”. (Double Wall)

4.With associated piping/ Pipe rack/ Bund wall/ pipelines/ Manholes and Drainages/ Access road and Parking.

Responsibilities:

Checking of excavation limit level of the tank foundation, backfilling of approved materials, Compaction test for backfilled materials (Using Nuclear Gauge)/ Checking of Material delivery related to civil and structural work/ Attending Trial Mix in batching plant/ Attending reinforcement bars testing of material/ Checking of concrete delivery on site. (Concrete batch ticket for Design mix, Slump, Concrete and Ambient temperature, Taking Concrete cube samples for Compressive Strength and Durability)/ Inspection of surface preparation prior for concrete placement/ Monitoring all concrete curing on site/ checking of re-bars continuity for all tank/Installation of post tensioning duct, tendon, pre-tensioning and post tensioning/ checking of embedded material prior for concrete placement/ checking of installation of hot deep polyethylene liner underside of the tank/ Checking of extrusion welding around HDPE liner/ checking of monitoring pipe prior to backfilling/ checking of poly prime SB-bituminous primer, membrane XLR (Self Adhesive) & Board around the tank/ checking of final elevation around the tank.

Inspection of All work related to Civil and Structural (not mentioned) as per Method Statement and Inspection & Test Plan.

Committed in implementation of EHS on All site Office and work place.

Date: December 10, 2008 to December 09, 2019.

Client: Peru Gas Company Ltd.

Company: Chicago Bridges and Iron. (CBI)

Name of Project: Construction of Two (2) Liquefied Natural Gas Tank

With associated Utilities. Pipe rack, Piping, Pipelines, Jetty, Sub-station

Building, Warehouse Building, Asphalt Road Network.

Discipline: QA/QC-Civil and Structural Inspector.

Responsibilities:

Ensured that all execution of work are properly implemented in compliance with the Project specification requirements. EHS requirement, Approved work procedures, Inspection Test Plan, and approved Construction drawings.

Checking of backfilling materials and degree of compaction using nuclear method gauge.

Checking pre-pouring and post-pouring inspection for Tank foundation, Pipe rack, Equipment, Vessels, Buildings foundation.

Checking of Installation of gratings and accessories, Hand rail, Cage Ladder and Bolt Tightening.

Checking of Reinforcement bars Delivery and Installation on site.

Inspection of construction joint and installation of water stop.

Inspection of Concrete delivery on site, Slump, Temperature, Taking concrete cubes sample for Compressive and Durability test.

Checking of Erection of structural member, Verticality, Alignment and Levelness.

Checking of boreholes for pile foundation and installation of reinforcement bars prior for concrete placement.

Checking of installed bolt as per approved drawing and bolt tightening using

Torque wrench.

Date: March 28, 2007 to March 29, 2008.

Client: Sharq Petro-Chemical Plant

Consultant: Foster Wheeler.

Company: Mohammad Al Mojil Group (MMG)

Name of Project: Sharq. 3RD Expansion project/ Ethylene & Propane Petrochemical plant.

Discipline: QA/QC - Civil and Structural Inspector

Responsibilities:

Review the quality manual and project quality plan based on the company affiliated With International Standard ISO 9001.

Ensuring all civil and structural QA/QC requirements are properly implemented in

Compliance with quality system procedures, Project Quality.

Undertakes routine, monitoring daily construction activities in site.

Raising Request for Inspection (RFI) to the client of all daily inspection and testing activities.

Checking pre-pouring and post-pouring inspection of all foundation pipe rack,

Equipment, Vessel, Drainages, Box Culvert, Manhole concreting.

Checking compaction test (FDT) of all approved backfilled materials on site.

Checking incoming material deliveries at site to ensure that All materials to be use are conforming to Material Approved Request (MAR) and Project Specification requirements.

Attending Inspection with client representative prior to release hold point.

Checking all structural materials erected is aligned, leveled and plumbed.

Checking all erected structural material bolt sizes and length is comply to Project

Specifications.

Checking of bolt tightening by using torque wrench to specified bolt tightness.

Carry-out final inspection for all structural steel materials for final turn over to the client.

Date: February 22, 2005 to February 25, 2007

Client: Qatar Gas Company Ltd.

Company: Kettaneh Construction ltd. (Sub-Contractor), Under Mitsubishi Heavy

Industries

Name of Project: Construction of (5 units Propane Concrete containment tank with

140,000 Cubic Meter capacity. Located @ Ras Laffan Industrial city.

Discipline: Site Engineer

Name of Client: Ras Laffan Gas Company. (Ras Gas)

Name of Project: Construction of LNG- Concrete Containment Tank # 6 (No.71-T053) –

With 140,000 cubic meter capacity located at Industrial City. Ras

Laffan Onshore expansion project train no.05

Discipline: QA/QC - Civil and Structural Inspector

Duties and Responsibilities:

Review the Quality Manual and Project Quality Plan based on the company affiliated international standard ISO 9001.

Ensuring that all Civil and structural QA/QC requirements are properly implemented in compliance with quality system procedures.

Attending daily request for inspection with the client related to construction of tank and associated structures.

Carried-out inspection in all incoming material deliveries on site.

Carried out inspection for tank wall painting work.

Conduct inspection for civil construction of waste spillages.

Checking reinforcement bars installation and cleaning and chipped prior for concrete casting.

Checking concrete mixed as per site delivery before concrete casting. Concrete and Ambient temperature, Slump, taking cube sample for compressive strength.

Conduct inspection of wet film thickness and dry film thickness of the wall surface.

Monitoring of daily painting activities and submit traceability report to the client.

Carried out adhesion test for tank wall paint using dolly tester.

Installation of tendon duct, wire strand prior for pre-stressing.

Checking of stressing value during tensioning and grouting of wire strand.

Local Employment:

Date: August 01, 2011 to April 10, 2012.

Name of client: Mrs. Susan Ong / Owner.

Discipline: Project Engineer/ Sub-Contractor

Name of project: Construction of 85 unit of stalls with associated Water Lines &

Electrical Lines. - located at Tarlac City common terminal

Philippines.

Responsibilities:

Responsible for all permit and materials needed on construction site. According to

Plan and Standard.

Responsible for day to day work activities on site.

Responsible for safety of the workers on site.

Responsible for hand-over of the project.

Date: January 20, 2000 to December 20, 2004.

Discipline: Project Engineer.

Company: MCT Construction and Development.

Name of Project:

1.Construction of 4th Storey Commercial Building. – Located at Along Mc Arthur Highway San Roque, Tarlac City, Phils.

2.Construction of 2nd Story Office Building, Warehouse, Perimeter fence, Road network and Drainages. – Located at Bagong Bayan Ugong, Valenzuela Metro Manila, Philippines.

3.Construction of 6th Story Shopping Mall Building. ( Magic Star Mall) – Located at Makabulos Drive, San Vicente Tarlac Philippines.

4.Construction of 2nd Story Commercial Building. – Located at Mc. Arthur Highway, San Sebastian Tarlac City, Philippines.

5.Road widening & Concreting – Located @ San Nicolas Capas, Tarlac, Philippines.

Responsibilities:

Responsible for all permit needed, Materials Take-off, Manpower and Equipment on site.

Responsible for Excavation limit, Safety Barrier/signage and safety of the workers on site.

Responsible for bar bending schedules of the project.

Responsible for installation of formwork, alignment and verticality of the structures.

Responsible for Quantity take-off for concrete placement.

Responsible for preparing daily work activity.

Attending routine inspection with the client representative.

Responsible for all sub-contractor billing assessment on site.

Responsible for As-Built drawing and Hand-Over of the project.

Date: September 15, 1998 to November 30, 1999.

Name of Project: Construction of Pacific Plaza Twin Tower

Located at FBDC. Taguig, Metro Manila, Philippines.

Company: EEI Corporation.

Discipline: Construction Lead Man for Structural work assigned @ South Tower.

Responsibilities:

Responsible for day to day installation of reinforcement bar.

Reporting to Construction Foreman on day to day assignment, daily progress report.

Checking of material delivery on site activities.

Date: May 05, 1997 to August 01, 1998.

Name of Project: Construction of Multi-Purpose Convention Center.

Located at Apulid Panique, Tarlac, Philippines.

Company: Eser Enterprises.

Discipline: Civil Supervisor

Responsibilities:

Reporting to Project Engineer for daily progress report.

Responsible for Material and Equipment requisition as per site requirement.

Responsible for sub - contractor weekly accomplishment billing.

Assisting the project manager/project engineer and client representative for site inspection.

Checking reinforcement and form works prior for concrete placement.

Construction of Roadway and Parking area.

Note: Work Certification to be follow upon request.