Ronald Nelson
Manufacturing Engineer
Project Manager
Hamilton, Ohio
acr3jm@r.postjobfree.com
SUMMARY
Innovative leader in the digital manufacturing initiative
Responsibilities as an Operational Excellence Manager:
Lead the design and implementation of initiatives or events that eliminated waste, reduce cycle time and improve business performance while establishing a sustainable model for continuous improvement.
Acted as a coach and change agent to instill the continuous improvement culture throughout the organizations.
Communicated the learning, the thought processes and the impact across organizations and value delivery system.
Trained and coached resources on Lean Principles and Six sigma methods.
Provided general
Supported the Operational Excellence departments at Pilkington Glass, Kyocera (AVX ceramic capacitors), AK Steel continuous rolling mill, GDX Automotive (rubber extrusions), Dover Corp plastics extrusions, Magnode Products (aluminum extrusions) continuous manufacturers and numerous other manufacturers eg. GE, Boeing, International Truck and Engine, BTR Automotive, Ingersoll Rand, Parker Hanafin, TRW Automotive, DOW UTC Sikorsky Helicopter, Hewlett Packard, USAF.
Profile
30 years experience in Project Management, Certified Lean Six Sigma Black Belt, Industrial Engineering with managing Six Sigma / Lean projects associated with New Product and Process Launch activities with Bachelor's Degree in Manufacturing Engineering.
Experience in highly regulated industries such as Aerospace, Medical Device, Automotive, and Electronics)
Experienced influencing others and leading change/improvements
Advanced body of knowledge of PMBOK / Project Management / Lean Six Sigma techniques with track record of implementation
Identified Improvement Projects and Initiatives to accomplished Strategic Goals
Hands-on experience in implementation of Global Best Practices in the integration of Design, Tests, DOE, Experiments / Trials in Development, Manufacturing and Assembly sectors.
DFSS, DFMA, DMADV and DMAIC methodologies training and deployments
Developed DFX, Design for Reliability, Test, Costs and Maintenance
Corrective action plans, and work around plans to meet program goals.
Tecnomatix-Teamcenter: PLM UGNXCAM, Solid Edge and CAD based CMMs PCDMIS-Pro E, Creo ProMechanica, ProManufacturing CAM, 3D Printing
Collaboration: Concurrent with Global Suppliers-Boeing 787, Club Car, International Truck and Engine New Product / Process Design using Digital Manufacturing system Autocad, FactoryFlow, FactoryCAD and virtual VizMockup to create a 3D simulation of the complete production line (TOOLING, MACHINING, ASSEMBLY SEQUENCING AND FACTORY LAYOUT) for analysis of variants for RFQ.
Proficient in Optimization-OEE-Advanced cost estimating skills which comprises; analysis process improvement.
Estimation for time standards in glass, ceramics, carbon fiber composites, plastics, rubber, automotive, truck, aircraft assembly, electro mechanical, microchips fabrication, steel making, aluminum extruding, conventional machining, cnc machining, advanced machining, ecm, edm, casting, brakes, stamping, hot joggling, bending operation steel, aluminum, titanium and other exotic materials.
Initiated Automated Capital Equipment: Robotics, PLC controlled conveyors, manipulators Projects.
Tool Development / Process Development in Mechanical Assembly, Welding, Cleaning, Cleanroom, and Test
Value Stream Mapped the Supply Chain logistics flow and sequence of processes for the Current and Future / Ideal States at numerous Facilities.
Experience in integrating the engineering development, Product Lifecycle Management, Material Distribution. Project Management, and process development team in medical devices, automotive, helicopter, aerospace, aircraft, truck and bus assemblies from concept to production, utilizing various engineering tools like OEE-Kaizens-Kanban-DFMEA/PFMEA, DOE, FEA, DVP&R, Simulations, FactoryCAD / FactoryFlow AutoCAD Plant Layout, ProModel Simulations, Site Planning, Space Planning, Operations, TOC, Demand Planning, Pull Replenishment, Supply Chain Planning, Material Handling Equipment and Inventory Management.
Experience in advanced negotiation skills which includes; Conflict resolution, Union negotiation, Gate reviews for designs, CI, Supplier Capability, Performance Audits and Qualifications. Collaboration in Plant layout proposals.
Proposal writing for marketing department.
Best in Class Manufacturing Practices, Benchmarking, Strategic Planning.
ISO13485-FDA-GMP-Validation-Verification-CAPA-TS16949
Drove deployment of Built in Quality, the reduction in quality escapes, Cost of Poor Quality (COPQ), and Materials Review Board (MRB) utilization for assigned areas of responsiblity.
Participated with the New Product Development (NPD) Engineers and the Integrated Product Delivery and Support (IPDS) process (Phase 1-5) for product transition into manufacturing including supporting the sign-off approval process.
Responsible for Phase 6 programs including identification of Manufacturing Readiness Level (MRL) gaps for assigned products and processes. 4P
Supported the Quality Management System (QMS) policies and procedures.
Factory Readiness: Developed, documented and trained step by step method sheets and work instructions for products to facilitate work cell incorporation. Ensured correct tooling and factory test equipment were available and in use. Supported all internal and regulatory audits.
Identified and implemented 8D with Root Cause Corrective Actions using processes such as Corrective Action, Preventative Action Poka-Yoke Mistake-Proofing. Participated in developing cause chains to determine real issues and cause. Suggest changes to Design Engineering regarding issues impacting product and process integrity.
Provided data for analysis and identification of capital equipment needs to address gaps in capacity, including tool creation, automation, robotics / fanuc, plc / Allen Bradley, process management and installation. Drove adherence to department Burden, Tooling and Momentum budgets.
Executed and managed projects (such as Safety, cost reduction, transitions, Supplier Quality issues, COPQ, etc.) and allocated funding for assigned areas of responsibility. Coordinated and supported efforts to align with project and factory needs. Identified and executed alternate solutions to mitigate quality and schedule risk.
Provide technical guidance to ensure improvements or achievement in: On-Time Delivery, PPM, Cycle-time Reduction, First Pass Yield, Turn Around Time, Inventory Reduction, COPQ and Safety.
Improved internal manufacturing operations including; continuous improvement statusing, budget statusing.
Coordinated improvement project planning and execution. Scorecards
Interface with Suppliers, Customers and Stakeholders
SKILLS / TOOLS
Experience in Lean applications such as: VSM, TPM, SMED, VA vs. NVA, Poka Yoke, 5S, 8D, CAPA, A3, JIT, Kaizen, Kanban, etc. Familiar with Six Sigma methodologies and applications such as: DMAIC, DFSS, BHI-DFMA, SIPOC, VOC, APQP, PPAP, D/PFMEA, MSA, GR&R, CP, SPC, GD&T, Process Mapping, Excel, Pivot tables, Macros, Access, Minitab v17, DOE, ANOVA, Chi-Square, Hypothesis Testing, Regression Analysis, Control Charts, Histograms, etc. Familiar with project management applications such as: Scope, schedule and cost as well as WBS, Gantt Charting, Minitab Quality Companion 1/2/3, SigmaFlow, PMBOK, Primavera, MsProject, MsOffice-Excel-Word-PowerPoint-Visio-Outlook-Access-SharePoint-Gap Analysis, Risk Management, and iGrafx, FactoryFLOW, VizMockup, ProModel Simulations.
Medical Devices / Aerospace:
CAPA-Corrective Action Preventive Action - RCA-Root Cause Analysis-FTA-Fault Tree Analysis-Risk Mitigation, Contingency Planning - Qualification Plans - Installation Plans-Operational Plans - Performance Plans - Validation Plans - Verification Plans - Verification of Effectiveness - Investigation - ENOVIA-Live link-Change Management Systems - SCAR - Supplier Corrective Action Reports-ISO 13485-FDA-GMP-21FR 820 483's
EDUCATION/ CERTIFICATIONS/ TRAINING
BS, Manufacturing Engineering, Lean Manufacturing Miami University, Oxford, OH, May 1986
MBA Prerequisites in Finance-Accounting-Marketing-Lean Production Operations 1985-1986
Management-Business Law-Advanced Statistics courses 1985-1986
Engineering Technology Student in NC Programming-Time Study Training, Miami University Hamilton/Middletown, OH, 1969-1975
Certified DMAIC Lean Six Sigma Black Belt/Moresteam.com/ASQ and Ohio State University November, 2004
Minitab V17, Mintab Quality Companion and Visio/Grafx purchased 2004
MsDynamics-Cloud-Excel-Access-Word-Powerpoint-Visio-Sharepoint-MSproject
Certified DFSS Six Sigma Black Belt training/Moresteam.com, 2010
Certified Primavera P3-Scheduling and Suretrak at CBA Perrysburg, Ohio 1990
Certified in MCACES Cost Estimating at Building Systems Design Atlanta, GA 1990
Certified in MOST Maynard Operations Sequencing Techniques 1994
Experienced and Certified in SAP, AS400/MOST at International Truck and Engine 1995
Extensive Plant Layout, Material Flow, Line Balancing and stopwatch Time Studies experience 1968-2014
Studied Plastic Technology Testing at Edison State Community College, Piqua, OH, 2002
Studied 40 Six Sigma Video Tapes by Dr. Mikel Harry and Greg Brue 2000
Gemba Academy Tools purchased 1998
SigmaFlow purchased 1997
Studied Toyota Production System TPS 1986-2013
Certified AutoCAD/Design 540 hours Training Butler Tech Hamilton, Ohio 1991-1992
Trained and experienced in Autocad 10 thru Autocad 2015
Certified in Pro E software license since 1996-ProJunior-PT Modeler-Pro EWildfire2000i-vs 5.0-Creo vs. 3.0
Certified UG 17-UGNX V8.0 and Mastercam 1994-2015
Familiar with Inventor-REVIT-2013-AISC-ANSI-CAE-FEA- NEINASTRAN-SOLIDWORKS-CATIA V
Certified AIAG : TS16949-QS9000-APQP-FMEA-PPAP-CP-MSA-GD&T-SPC-ePPAP
VSM-CI-KAIZENS-5S-OEE-RCA-8D-Problem Solving, DFMEA-PFMEA and Control Plans
EXPERIENCE:
Faurecia. North America Auburn Hills, MI. Sept 28 2015 to present
Supply Chain Industrial Engineer
APQP - PPAP - ePPAP - Supplier documents for GM seats
Supply Chain compliance for offshore Mexico plants.
Zimmer Orthopedics Warsaw, IN Oct 6-2014 thru Dec 20, 2014
Six Sigma Black Belt Consultant
Sr. Quality Engineer
CAPA 650 Lead for Medical Devices Manufacturer of Orthopedics Products.
Knee, hip, shoulder and trauma implants
QP-IQ-PQ-OQ-IQSRs-IR-VOI-VOE
Project Leader of contractors and direct employees for the validation, installation and qualification imlpementation of 39 PCDMIS 2014 software upgrades to control Brown and Sharpe Coordinate Measuring Machines (CMM's)
RCA-FTA-SCAR-CAPA-IR-Remediation - Risk Mitigation - Contingency Plan - VOI-VOE-DOE-FDA-GMP-GDP-Validation-Verification-Planning-Scheduling-Reporting-Trainer-Video Time Studies-TimerPro-Line Balancing-Productivity Improvement-Communications Planning
Communication Plan-ENOVIA-Management Reports-Tracking-Issues Resolution-Team Meetings-Reliability Tests-Error Proofing
Trained Resources for Installations-QP-IQ-IQSR
Gathered the right data for analysis and operations modeling for DOE
Created timeline for installations and created resources to accomplish objectives
Navistar International Truck and Engine, Springfield OH Sep 13 - Oct 13
Lean Manufacturing Specialist Lean Six Sigma Black Belt Consultant
Contributed to the team effort by Performing Supplier logistics and Sub operations observations /data collection (time studies) for all Truck Assembly.
Process Improvement applying Modapts to Balance the Assembly Line with the objective to reduce the headcount of direct employees by 50.
Introduced to Cab Trim Management a Facilities /Conveyor Equipment Project that will increase the capacity/ yield two Trucks per week for a gross revenue increase of an estimated $8 million per year for the Springfield Assembly Plant
Innficon Inc., Syracuse, NY Feb 13 - Mar 13
Lean Six Sigma Black Belt Consultant
Lean Manufacturing Initiated all the process development in Mechanical Assemble, Welding, Cleaning, Cleanroom, and Test to Process Map the Supply Chain logistics flow and sequence of Current state Value Stream Map.
Used AutoCAD 2013 layering to create the flow of material, product and production processes for Shipping, Receiving, Mechanical Assembly, Cleaning, Clean Room Assembly, Packaging and Tests.
Project management, budgeting scheduling, design and installation and maintenance of industrial automated machinery projects
Assessed the feasibility to automate with AGV, Robotics, vertical ASRS and carousels to enhance the KANBAN, Feasibility Studies
Analyzed the facility and created a future state VSM with two options.
A greenfield vs.a brownfield option.
Vendor Collaboration and Research for Automated solutions to improve SMT production yields and tool up-time through optimized process monitoring, analysis and control.
Implement Lean Manufacturing, Identified improvement opportunities with flow, transportation, and space and cycle time.
Determined cycle times to cost current state VSM
Created cost model for future state VSM
Clean Room Design concepts including multiflorous materials/ utilities, maintenance access and gases between floors
TRW, Lafayette, IN Oct 12 - Nov 12
Lean Manufacturing Engineer/ Lean Six Sigma Black Belt Consultant
Lean Manufacturing Engineer for Steering Gear Manufacturing
Tracked Supplier Collaboration/ Quality for outsourced heat treating (Inventory Management)
Introduced to Manufacturing Engineering TimerPro Video Time Studies to create standards, work instructions, line balancing and Implement Lean Manufacturing.
Worked with APQP PPAP and PFMEA teams Use planning system tools, past manufacturing experience, and academic knowledge, to address/predict all possible manufacturing/quality causes for product/process failure.
Development of process/ methodologies for VSM-current state Bottleneck at machining-grinding-hobbing-classifying heat treat and CMM tests lab workflow-pfmea-control plan-
Identified improvement opportunities in methods-CAM-TPM-OEE
Mentored-coached-trained engineers, supervisors and operators in Setup Reduction
Project Management/Tracking/Facilitation and Kaizen Leadership
Created Video Visual aids for operations, and training Quality Technicians/Coops
Floor Support for operators needs for tools, information and quality
Created GR&R training material which increased yield and reduced scrap Implemented a CNC setup reduction (SMED)= 14 minute to 2 minute grinding wheel change (applying a pre-assembled grind wheel assembly) over that eliminated bottleneck at sectors Magerle grinders and increased revenue capability by 30%. For Steering Gear Assemblies
Ford F-150 Truck Steering gear systems
Pilkington Automotive Glass, Shelbyville, IN Aug 11 - Sep 11
Lean Six Sigma Industrial Engineer
Performed Time Studies that contributed to line balancing, manpower allocation (utilization), and decreased downtime, eliminated bottlenecks and improved throughput, flow, capacity which increased yield to furnace dept. and quality by 20%.
Risk Management-Collected Data of Downtime. Performed Analysis using Paretos for problem solving system and equipment failures, OEE, preventive maintenance and Continuous improvement at pre-process flat glass production (cut, break, grind) and printing stations.
QS9000-TS16949-FMEA-APQP-PPAP-CP-SPC-MSA
AutoCAD cell layout design
Tier One-union plant-Ford Production line
Kaman Aerospace Structures, Jacksonville, FL May 11 - Jul 11
Manufacturing Process Planner-CNC Programmer-UGNX6 flat patterns from legacy adobe pdf's AutoCAD -MasterCAM, FAIR/DISCUS
Created Complete Manufacturing Process Plans in CAPP for sequencing shear-punch-stamping-roll forming-joggling-fabricating/finishing sheet metal and extrusions details used in Bell-Textron-Sikorsky Blackhawk Military helicopter cockpit assemblies.
MRP:Citrix-DISCUS (FAIR}Engineering Graphics GD&T -CAPP-MPP-TRAINED in UGNX6-CNC MasterCAM Programs for sequencing KOMOS extrusion and aluminum and steel sheet metal manufacturing, heat treating, fabrication machines.
Quality Auditing: Supplier Qualification-First Article Inspection FAI-AS9102-ITAR
Advanced DFSS Six Sigma Black Belt Training in (DFSS/DMADV/IDDOV) at Moresteam.com online 2009-2010
Global Aeronautica/ Boeing Company, North Charleston, SC Mar 08 - Nov 08
Industrial Engineer
787 Composites Fuselage Assembly Time Study Supplier (Capability) Audit resulting in Boeing's buyout of Global Aeronautica in 2008
As an Industrial Engineer/ Cost Estimator/Analyst SME team member established comprehensive accurate costs for 787 Mid/Aft fuselage assemblies joining/aligning and identified the cost impact using TimerPro's estimating database for assembl/instaalations of newl engineering changes within the hydraulics and electrical systems (WIRING) installations processes.
Utilize management tools, training and techniques to track projects focusing on critical gates for on time completion, while reducing cost and maintaining or exceeding quality standard; Primavera.
Optimized costs through effective (Concurrent Product and Process Development) CPPD, choosing suppliers, and maximized chances of getting parts correct the first time.
Experienced in managing all commercial, quality and delivery of direct material commodities such as Castings, Forgings, Assemblies and Machined Components.
Created a Time Study cost database with pivot tables and TimerPro software for composites drilling, filling (FASTENERS), joining, painting, alignment and flow handling operations.
Identified NVA/VA and identified problems (waste and defects) with drilling/filling (shop floor support) and provided data collection using TimerPro to the Lean team (AIG) Process Improvement Project.
787 Fuselage Final Assembly Integrator
First nine ship sets
CPQP International, LM Glasfiber Little Rock, AR Oct 07 - Feb 08
Composites Wind Mill Turbine Blades Manufacturing Plants
Program Management, Organization, Change Management Industrial Engineer, and Workflow design for collaboration of lean (pull scheduling) construction and installations.
CPQP Coordinated the CH2M HILL Design-Construction for two NewPlants and one modified plant site/permits-inception of construction.
Defined quality standards, cost tracking budget performance metrics (Scorecards), codes/permitting procedures, supply chain redesign (OTD).
Improved AutoCAD Plant Layout, processes, DFMEA, project tracking of tasks, costs, and on time deliveries (OTD) of HVAC, and mechanical/electrical/hydraulic and dust collection equipment installations for the manufacture of 120 ft. long carbon graphite (VaRTM) composites wind mill turbine blades.
NPI-APQP-PFMEA-PPAP-CP-AUTOCAD
Consultant to Boeing Company Everett, WA Jul 07 - Sep 07
Industrial Engineer/Supplier Capability 787 NPI
Identified and implemented improvements to Plant Layout and processes by analyzing current processes and utilizing established improvement methodologies to maximize the efficiency of equipment and personnel to support company improvement initiatives.
Analyzed changes to approved plans resulting from unplanned events.
Assessed the impact of the changes that occurred to cost, schedule, resources, and delivery.
Developed modifications to existing plans and obtained approval for plan changes.
Member of Boeing team that performed the Summit at Vought in North Charleston to audit Vought's Supplier(s) Quality Capabilities resulting in Boeing buyout of Vought
Participated in negotiations representing Fuselage LCPT to support schedule commitments and/or statement of work impacts.
Maintained Traveler Deck, LOB and Waterfall charts. Tracked all on dock dates for Partner end items and coordinated end items for expeditious delivery. Developed Statement of Work, Manufacturing Build Plans, Convergence charts and coordinated plans for traveled work (Progress tracking) from Partner/Supplier, coordinated with Change Incorporation airplane commitments focal and coordinated the BPR deck preparation, tracked schedule risk associated with respect to Global Aeronautica/Vought & Final Assembly (FAD).
AK Steel Mansfield, OH Mar 07 - Jun 07
Industrial Engineer Robotics Applications-Automation
Concepts for Lean Manufacturing, Cognex Machine Vision-ultrasound inspection automation-manipulators-sampling probe automation-Slide Gate-Chock Changes-Detailed Autocad Equipment and tooling Plant Layout Design
Stopwatch Time Studies
Project Engineering Stainless Steel Melt Shop-Caster-Finishing Mill-LMF Ergonomic Safety Process Improvements
GDX Automotive (Cerebus Holding Co.), Wabash, IN Mar 06 - Oct 06
DFLSS Lean Implementation Industrial Engineer
Value Stream Mapping, Stopwatch Time Studies and work cell designs.
Designed, specified and implemented Lean Plant Layouts for existing and new product development (robotics), new extrusion and injection molding processes for black rubber, plastic and metal bonding seals, doors and windows for vehicles.
Plant Layout for greenfield and brownfield.
Detailed Equipment installation drawings for electrical schematics, mechanical and piping for extrusion presses, ovens, calendaring, power distribution and control panels.
Weather-stripping for Toyota, Volkswagen (robotic paint station), Ford escape (new robotic assembly station), New Launch of Ford GT and improvement to capacity/production for GM, International Truck, Mazda, Chrysler, Ken worth, and Freightliner.
Improved material flow, space, line balancing and capacity 20%. AutoCAD 2006
Reduced cycle time 10%.
Reduced inventory 20%
Standardized equipment and processes.
Facilities Design: DFX-DFM-DFA-DFT
IS0-QS 9000-TS16949
NPI-APQP-PFMEA-PPAP-CP
Parker Hannifin Marysville, OH Mar 06 - Apr 06
Project Manager for a Lean Value Stream Management Project
MS Project, PowerPoint, Excel, A3 and AutoCAD.
Established Kanban (FIFO) scheduling between machining and assembly and for purchased castings, Stopwatch Time Studies
Utilized two card systems with 24 turn level and increased productivity of work center to 80%.
Created and maintained DFSS metrics (Scorecards) and tracking of Quality First Pass Yield to 96%
Reduced Cost Pieces/Labor Hour; Delivery: Customer Shortage Cell or
Supermarket Shortages; Safety, 5s+1; Downtime Charts Pareto Analyses Task List.
Total Productive Maintenance-TPM and Kaizen tools training.
Implemented these Lean Methods to reduce downtime and machine
reliability: Job Layouts-Standardized Work-Mistake Proofing-Quick
Changeover/Setup Reduction-TPM check sheets/audits.
Results were cycle time reductions of 50%.
Reduction of WIP. FIFO heat treating
Two operators running three test stands.
Improved units per person per day from 14 to 20 (43%improvement).
One piece flow, andon lights and reduced response of errors to assemblers.
GDX Automotive Wabash, IN Dec 05 - Mar 06
Lean Industrial EngineerPlant Layout
Consolidated 3 Manufacturing Plants/Installation/Moved Rubber Extrusion and Injection Molding Machines from North Carolina and Arkansas to Wabash In.
Detailed Utilities-Electrical Drops / Distribution-Mechanical-Pneumatics, Plumbing Connections and foot prints Plant Layout
Integrated Material Flow, Detailed in AutoCad
Kimball/Flexcel, Salem, IN Sep 05 - Oct 05
Black Belt Process Engineer
Lean Deployment and Implementation.
Value Stream Mapping, PFMEA, Time Studies, Line Balancing and Visual Controls
Trained operators
Applied kaizen blitzes and Kaizen events, Gemba Kaizens
Reduced to 24 (FTE) full time employees from original 30 FTE cabinet
Built and reallocated resources to create a new labor pool.
Project scope was 53 FTEs for 4 month goal for complete line at $33k/FTE.
GE Transportation Systems, Erie, PA Mar 05 - May 05
DFSS Industrial Engineer
Responsible for applying all time standards for complete Locomotive Final Assembly.
Created and revised process plans using CAPP software tool Computer Aided Process Planning
New Product Launch-Green Engine
Dover Corp. (OPW), Smithfield, NC Jan 05 - Feb 05
Cost Estimator
Multilayered plastic pipe extrusions for gas stations
Analyzed Process performance to identify wastes and recommended changes to settings to increased yield and meet OTD.
Club Car Inc. (Ingersoll-Rand) Augusta, GA Jun 04 - Nov 04
Consultant Black Belt Manufacturing Engineer/Assembly
DMAIC-Project Selection, Project Charter, Deployment, Trainer.
Six Sigma Certified Black Belt Deployment
Trained Greenbelts in DMAIC/DFSS and lead a cross-functional team.
Achieved Lean Six Sigma Black Belt Certification
Analyzed the Manufacturing and Assembly Process
Supplier Quality Management-Audit-Controls-Containment-Defect Tracking/Elimination
Global China Sourcing and Manufacturing Integration (Manufacturing Build Plan) of New Products/Processes
CHANGE MANAGEMENT: ECN-ECR-BOM accuracy-Lotus Notes-Pro E Wildfire 2.0-ProIntralink
DFSS-Product Development-DFMEA-PFMEA-Developed Next Generation Gen-2 Accelerator Pedal.Group Assembly
Trained Product Engineer team in DFM-DFA-DFTest methodologies
Demand Flow Technology-Lean welding cell design (golf carts).
Reduced COPQ $500,000 per year and increased Net Revenue $2,000,000 per year.
Improved performance of gas golf carts speed to (> 12 mph).
Improved Customer (Golf Courses) Satisfaction
Kerotest Manufacturing Co., Marksville LA Jun 03 - Sep 03
Lean Manufacturing Consultant/ Change Agent
Consulted to General Manager the current state, future state and implementation plan.
Developed Lean Transformation training material for presentations in TPM .
Manufacturing Audit
Continuous Improvement.
Created VSM Maps for materials flow internal logistics.
Tolerance Analysis Variance reduction plastic injection molding-GD&T
Reduced defects and material waste and cycle time/for Polyball Mazak Lathes
Stopwatch Time Studies
Wrote CNC G-code work instructions and wrote test procedures for plastics fusion (assembly) process standardization
Visual Work Instructions for Injection Molding and Mazatrol CNC Lathes turning plastic ball valves
Steel valves GD&T variance reduction resulting in yield improvement
Consultant to Six Sigma Pipe (Startup), Columbus, OH Dec 02 - Jun 03
Volunteer Industrial Engineer
Estimating-Personnel-Training-plastics Mold Design-Tool and Mold Qualification/Startup-Auxiliary Equipment, Plastic Pipe Extruders Specifications-Plant Site and coordinating training resources Government grants with Edison State Community College in Piqua Ohio and Society of Plastics Engineers (SPE) Subject Matter Experts (trainers).
International Truck & Engine Corp. Sidney, OH Jan 02 - Nov 02
Corporate Team Consultant Six Sigma Quality Development Engineer-Process-Pre-Delivery Inspection Auditor
VSM-Process Mapping-Process capability to achieve 1.33 cpk for 30 Key Process Indicators (KPI's) DFSS-DMADV-Sustaining Gains-DMAIC improvement.
Collaborated with Design and Manufacturing / Quality teams for to reduce costs-CAPA-RCA preventative/corrective action-variation control-defect tracking-auditing-systems/database development-process flow -value stream mapping-pareto analysisstructured problem solving using 8d warranty reduction RDAP -reliability engineering lean manufacturing-work instructions-visual aids-5's-QS 9000
Applied PFMEA Controls to sustain Six Sigma gains
Multi-plant-technology transfer-standardize
Lead Kaizens, and Six Sigma Projects 25% costs savings
$900 Million Project =15% SAVINGS during 5 year 1998-2002
Exel Logistics Westerville, Columbus, OH Jan 02 - Feb 02
Lean Supply Chain Industrial Engineer
Assessed and Designed Autocad Plant Layouts/Lean Transformation for US Xerox distribution centers and warehouses east of Mississippi River
Designed conveyors and pallet rack systems
Integrated Red Prairie Systems
Labor standards for picking and packing
Material flow design
Consultant at GKN Aerospace Alabama Tallassee, AL Mar 01 - Jul 01
Lean Industrial Engineer Autocad Plant Layout
Quality: VSM-Visio Process Mapping-Applied Flow-Pull system
Visual Factory Reports (Scorecards) for Cost-Schedule-Quality
Applied TOC for constraint reduction-flow improvement-NDT-Ultrasonic Flow Stopwatch Time Studies
Six Sigma Line Balancing-Video training layup-preparing processes.
Wrote work instructions for thermoset and thermoplastic resins, and Standard reinforcement fibers such as carbon, fiberglass, Kevlar, Spectra, and others.
Developed and lead multidiscipline teams to create NDT inspection methods and plans for oven curing/autoclaves production flow, throughput and on time delivery/quality improvement, i.e.; ultrasound-system with squirter and bubbler techniques, ultrasound-immersion system. MRB team.
Eliminated bottleneck at NDT to assure OTD of Boeing Blocker Doors (Aircraft Composites) Structures)-GE-Airbus-Sikorsky-Pratt Whitney.
International Truck and Engine Jan 98 - Oct 00
Springfield / Sidney, OH Garland, TX Chatham, Ontario, CA
Corporate Manufacturing Excellence Team Member Plant Layout SME
Lean Manufacturing Engineer, Materials and Assembly Departments
Six Sigma Trainer
New Product/Process Development/Introduction-Next Generation Vehicle Integrated Product/Process Development Corporate Strategy-WCM-
Methods and Tooling Improvement for Chassis-Interior Trim-Powertrain-Transmission-Paint-Door Assembly-Wire Harness
Lean Logistics Flow Materials Management Inventory
Responsible for Conceptual and detailed Plant Layouts (AutoCad) and in-plant logistics simulations with Quest/Factory Flow-Line Balancing/MOST-3d VisMockup for Assembly Simulation Modeling
Lean Six Sigma Facilitator
Introduced and Implemented Solid Edge for Tool Designers
Trainer-coach