Post Job Free
Sign in

Project Manager Engineer

Location:
Toronto, ON, Canada
Posted:
July 21, 2015

Contact this candidate

Resume:

Imtiaz Siddique

*** ********* **, ***********, ******* M1C 3V8 416-***-**** ********@*****.***

Driven professional with a 20-year record of success overseeing all phases of multimillion-dollar construction, superfund and environmental projects for government and private-sector clients throughout Canada as well as the United Arab Emirates and the Kingdom of Saudi Arabia. Proven technical leadership skills in Senior Management, Supply Chain Management, Contractual, Administration and Financial matters related to the Construction Industry. Backed by strong credentials and a proven record of on-time, on-budget and high-quality project completions.

EXPERTISE AND KNOWLEDGE

Ability to manage large scale, multidisciplinary construction projects, including complex infrastructure and subsurface utility works.

Built and managed successful client relationships, ensuring all project needs were met.

Experience working with all levels of the construction trade including high-level stakeholders.

Ability to quickly grasp and master new and innovative concepts.

Employs a proactive management style ensuring operational proficiency and timely completion of assigned projects within or under timeframe and budget.

Results-driven, competent problem-solver with significant and progressive experience and expertise in such project-management concepts as project plan, project completion, scope, costing, scheduling, risk management, contract negotiations, planning and tracking, quality, and change management throughout the project life cycle.

Strong team leader with the proven managerial experience/skills to lead multidisciplinary teams and ensure productivity and morale in high-pressure situations.

Knowledgeable in MS projects, primavera P6 and document management tools.

EMPLOYMENT HISTORY

PARSONS International, Abu Dhabi, UAE

SENIOR PROJECT MANAGER – April 2011 to July 2014

PROJECT MANAGER (Contract) – April 2003 to August 2007

Transportation and Roads Improvement Program (TRIP) Contract Nos. 987/1, 221, 997

SITE ENGINEER – January 1982 to March 1987

TRIP Contract Nos. 5, 16 and 42

Euroestudios Project Management, UAE – March 2010 to April 2011

PROJECT MANAGER

NAKHEEL (Subsidiary of Dubai World), Dhabi, UAE – August 2007 to March 2010

PROJECT MANAGER (with Nakheel Project Management Team)

Celestica Inc. Toronto, ON – July 2001 to December 2002

PROJECT MANAGER

AMEC (Earth and Environmental Division), Scarborough, ON – August 2000 to July 2001

ENGINEER

Saudi Bin Ladin Group, Dubai, Jeddah, Madinah Al Munawarah – July 1989 to July 2000

ENGINEERING MANAGER / PROJECT MANAGER / CONTRACTS MANAGER

Tunisia and UAE Engineering Company, AbuDhabi, UAE – December 1988 to July 1989

RESIDENT ENGINEER

Khatib&Alami, Dubai, UAE – March 1997 to December 1988

ASSISTANT RESIDENT ENGINEER

PROJECT HIGHLIGHTS

PARSONS International, Abu Dhabi, UAE

Senior Project Manager and Construction supervisor (April 2011 to July 2014) for a number of infrastructure and service development projects including Water Circulation Enhancement in Eastern Abudhabi, construction of temporary bridges and culverts in Al Maryah Island to improve water circulation, and a Multi-span Continuous Bridge on Ghanadha Island.

Responsible for overseeing various developmental projects for the Department of Transport, Abudhabi, UAE with an annual budget of $150 Million.

Project Manager (April 2003 to August 2007) for the Transportation and Roads Improvement Program (TRIP), responsible for the design/construction of road works and utilities at Al Reem Island as well as Musaffah Bridge Widening (Contract No.221), to increase existing 19 span bridge structure linking Abu Dhabi to the Mainland from 3 to 5 lanes.

Direct supervisor responsible for overseeing the improvement project around New Marina Mall extension and the coordination of the construction of 300 independent luxury villas at the Breakwater Development at Abudhabi.

As Site Engineer (January 1982 to March 1987) supervised construction of the first incrementally launched twin girder bridge in the Middle East. Also supervised widening and new road construction, utility relocation, water works and storm water drainage works.

Euroestudios Project Management, UAE

Project Manager (March 2010 to April 2011) responsible for the development of Sir Baniyas Island for TDIC, Abu Dhabi, in coordination with Parsons International, with an annual budget of AED 500 Million.

Responsible for the Enabling Works, Refurbishing of Existing Buildings, Utilities Installation to supply Water, Electricity, Drainage System, Telephone Network, Street Lighting Works, Irrigation / Landscaping for Sir Baniyas Island.

Construction of new Structures and Landscaping/Hardscaping at existing Airport, Arrival Terminal, Equestrian club and an International Conference Center at Sir Baniyas.

NAKHEEL (Subsidiary of Dubai World), Dhabi, UAE

Project Manager (August 2007 to March 2010) responsible for the Design and Construction of Al Furjan and Jebel Ali Development with Turner International (Project Managers), WSA, Cracknell and Burt Hill. Project was a USD $ 5 Billion Mixed use development for Dubai World.

Responsible for the coordination works of High-rise Towers, Luxury Villas, Shopping Malls, Schools and other Public Buildings on the development.

AMEC (Earth and Environmental Division), Scarborough, ON

Project Manager (August 2000 to July 2001) responsible for conducting surveys of existing bridges in Hamilton, ON and submitting a report for refurbishment.

Responsible for scheduling and coordinating material testing. Inspection, monitoring and analyzing schedules.

Saudi Bin Ladin Group, Dubai, Jeddah, Madinah Al Munawarah

Engineering and Procurement Manager(July 1989 to July 2000) responsible for completing design build contracts such as American University of Sharjah Project, Sahara Mall, Sharjah, UAE, theFaisaliya Tower from the Jeddah office of SBG and the Ranya and Hariq Housing Project consisting of Independent Villas.

Supervised construction of Salimiya Tower Project at Dubai Creek including construction of the Diaphragm Walls for the three level basement parking.

Design Management and Engineering for the external works of the Prophet’s Mosque Extension Project at Madinah Al Munwarah, KSA.

Design Management and Engineering of the 8.5 KM long Tunnel connecting the Utilities from the Plant Complex to the Prophet’s Mosque.

Responsible for the Engineering/ Procurement/ Coordination works of the US $1.2 Billion External Works at Prophet’s Mosque in Madinah.

Tunisia and UAE Engineering Company, AbuDhabi, UAE

Responsible for the W-50 infrastructure development and Road Network for Abu Dhabi Municipality (Road Department).

Managed the Utility Network for the Officers City Colony consisting of the construction of independent villas for the Defense Department.

Khatib&Alami, Dubai, UAE

Supervision and overseeing of the Infrastructure Works at Karama and Al Qouz areas, Dubai Municipality.

Protection/relocation of Existing Services at the Clock Tower Area of Diera.

Landscaping and Hardscaping works for above location along with construction of the Pumping Stations and underground storage tanks.

EDUCATION

Bangalore University, India

B.S Civil Engineering and Structural Engineering

Member of the following Associations:

American Society of Civil Engineers

Institution of Engineers, India

Project Management Institute – In the process of obtaining PMP Certification



Contact this candidate