Greg Baker
**** ***** ******- *.*. Box ****
Deming, Washington, 98244-5021
Message Phone 360-***-****
Objective
A Project Management position where I can utilize my planning, design, construction management, estimating, field engineering, inspection, quality control, contract administration, scheduling, purchasing, organizational and management experience.
Marketable Transferable Skills
Building trades, carpentry, masonry, plumbing, electrical, business and financial management, accounting, purchasing, contracts, insurance, construction management, estimating, scheduling, contract management, computer, field engineering, survey, civil, structural, mechanical, piping, electrical and control systems installation skills.
Commercial Achievements
Managed construction and inspection activities on development properties, churches, schools, airports, residences, health care and commercial facilities, including Lakeview and Divine Redeemer hospitals, Wilder residence and nursing home, high and low rise residences. Results: Hands-on, Quality Work, on Time.
Coordinated design and construction activities with the owner, architect, design sub-consultants, contractors and vendors for Queens Park apartment complex complete with administration building. Results: This extended health care facility was the overall winner of the New Westminster Builders Award.
Planned and prepared contract documents for various residential, commercial, industrial, institutional and recreational projects. Results: Engineering documents, drawings and specifications were issued and field work proceeded on schedule.
Initiated Action and helped solve design and construction problems on a number of municipal, residential, recreational, industrial and commercial construction projects. Results: Construction proceeded on time and within budget.
Directed design and construction of a 200 Acre Nursery for propagation and growth of outdoor landscaping plants, Hines Wholesale Nurseries, subsidiary of Weyerhaeuser Corporation, Houston, Texas. The Project Included a pump station building, blending building, greenhouses, shade houses, propagation building, shipping office, covered dock structure. Results: Worked with horticulturists on the Project which was turned around and completed on schedule.
Directed field engineering and construction activities on the Arbutus Ridge housing development including, golf course, marina, post office, sanitary lift station, roads, curbs and utilities. Results: The development was completed within a sales driven schedule.
Coordinated architectural design and construction activities; with municipal governments, stakeholders, sub-consultants and contractors to complete twenty residential and commercial buildings in Vancouver, Burnaby, Richmond, New Westminster and North Vancouver, British Columbia. Results: Mitigated the back-log, Schedule delays and completed the units on time.
Employment History
1974 to 2015, Construction Tradesman, remodeled residential units in Burnaby, British Columbia, Canada and Glacier, Washington plus served the Snowline Community Club as a member of special projects, architectural, community facilities, land-use, long-range planning, rentals, rules and regulations committees. Facilitated repairs to the Community BBQ, new washrooms and change rooms during the recession- downturn in the economy.
2012, Construction Manager, Performed interim summer relief work on the Peace Canyon Hydro Electric powerhouse and visitors centre roof replacement, Gordon M. Shrum turbine replacement and rotor pole projects including coordination of Owner's construction services, Contractors and Subcontractors work activities, daily and weekly reports requested by B.C. Hydro Northern Team Lead, Hudson's Hope, B.C.
2003 to 2008, Project Manager, Construction Manager, Q.C. Manager, Project Controls Manger, Contracts Writer and Estimator on industrial projects, Ferndale-Anacortes, Washington, Salt Lake City, Utah, Rawlings, Wyoming and Williams Lake, B.C.
1991, 1997 to 2002, Construction Engineer & Senior Estimator, Anvil Corporation;
Worked on industrial, marine, municipal, wastewater treatment and commercial facilities located in California, Alaska, Montana, Wyoming, Washington, Oregon and B.C.
1999 to 2000, Project Engineer and Field engineer, checked shop drawings, resolved questions with owner, architect, structural, electrical, mechanical sub-consultants, piling, re-bar, masonry, electrical, plumbing, HVAC, sprinklers, elevators, steel studs, sub-contractors and suppliers; Also prepared sub-contract documents and minutes of meetings, Olympic Building, Barkley Office commercial area, Bellingham, Washington.
1996, Construction Manager, Resort Municipality of Whistler, British Columbia
Water reservoir, booster pump station, sanitary sewer lines, pump station, traffic signal lights, water lines, highway and roadway modifications, including the following projects;.
Lost Lake Reservoir and Booster Pumps,
White Gold Pump Station,
Emerald Force Main and Valley Trail,
Whistler Cay Well,
Lorimer Roadway Modifications, including widening to four lanes,
High School & Highway 99 Traffic Signals,
B.C. Rail Water Line,
1993 to 1995, Senior Contracts Administrator, Hamilton Doyle Architects,
Architectural designer, sub-consultant coordinator, shop drawing checker and construction coordinator, high-rise, commercial, residential projects in Vancouver, British Columbia, Canada, Note; there was a 24 month back log when we started. Our Team managed to get back on schedule and prepare the Units on Time, Including;
1188 Richards, High Rise Residential Units, Vancouver, British Columbia
Paramount Twins, High Rise Residential-Commercial Units, Burnaby, B.C.
Kingsford Court, Residential-Commercial Units, 40th & Cambie, Vancouver, B.C.
Richmond Holiday Inn, Richmond, B.C.
Robson Street (Suite) Hotel, Vancouver, B.C.
The Chatham, High Rise Residential Units near UBC, Vancouver, B.C.
The Portofino, High Rise Residential Units, Vancouver, B.C.
888 Pacific, High Rise Residential Units, Vancouver, B.C.
Centre Pointe, Phase II, Richmond, B.C.
North Shore Winter Club, Contract B, West Vancouver, B.C.
Balmoral, High Rise Residential Units, Burnaby, B.C.
Wall Centre, Burrard Street, Vancouver, B.C.
140 East 14th Street, North Vancouver, B.C.
Lexington, High Rise Residential Units, Burnaby, B.C.
Madison, High Rise Residential Units, Burnaby, B.C.
4211 Kingsway, Burnaby Centre, Tower Renovations, Burnaby, B.C.
Queens Park Residence, New Westminster, B.C.
Queens Park Administration Building, New Westminster, B.C.
Up-Dated Lease Plans, Metro-Town, Commercial Retail Units, additions, Burnaby, B.C.
1989 to 1990, Construction Manager and Field Engineer, Canadian Retirement Corp.
Arbutus Ridge, Seaside Village on Vancouver Island, British Columbia, including golf course, post office, sanitary lift station, marina, sewage disposal field, highway modifications, major housing development, roads, curbs and utilities. Note; The site preparation utility installations, lot servicing, roads, curbs and other associated civil infrastructure was behind schedule when assigned to this project. Our Team managed to get back on schedule to support a Fast Track Lot Sales Schedule.
Prior to 1990, Bricklayer & Stonemason, Municipal, Commercial & Residential Projects;
Divine Redeemer Hospital; Brick, Block, Clay Tile & Glaze Tile, So. St. Paul, Minnesota
Farm Credit Bank Building, Marble, Granite Facing & Coping Stone, St. Paul, Minnesota
Fort Snelling Historical Renovations & Restorations, Stonework, St. Paul, Minnesota
St. John Vianney, Church & School, Brickwork, So. St. Paul, Minnesota
Orange County Courthouse, Terra Cotta Tile Facing, Los Angeles, California
Wilder Residence & Nursing Home, Special Mankato Cut Stone, St. Paul, Minnesota
Meridian Shopping Center, Split-Face Concrete Block, Bellingham, Washington
Apartment Complex, Ornamental Brickwork & Fireplaces, Denver, Colorado
Bank Building, Glazed Brick & Split-Face Concrete Block, Webster, Wisconsin
Hastings Grade School, Brick, Stone Sills & Coping Stone, Hastings, Minnesota
Bowling Alley, Brickwork, Reseda, California
Lakeview Hospital, Brickwork w/ Special Cloverleaf Design, Stillwater, Minnesota
Sportsman Inn, Glass Block Windows, Brick & Concrete Block, So. St. Paul, Minn.
Lincoln School, Brickwork, Minneapolis, Minnesota.
Served Bricklayers, Masons and Plasterers International Union of America, Apprenticeship with Local Union No. 1, St. Paul, Minnesota.
Education
BA, Business Administration, University of Saint Thomas, St. Paul, Minnesota
Project Management Certificate, Bellingham Technical College,
Computer Studies, Microsoft Office, Word, Excel, Access, Power Point, Project,
Microsoft-Windows X-P 2002-Windows 7-2010, September to December, 2011,
Construction Contracts, University of British Columbia,
Purchasing and Construction Contracts, University of Oregon,
Fire and Safety Engineering, Insurance Company of North America,
Building Design, Construction, Cost Estimating, Chicago Technical College,
Electronics, Steam and Water Transfer Engineering, U.S. Naval Officer,
Journeyman Bricklayer and Stone Mason, South St. Paul, Minnesota,
Architectural – Mechanical, Design & Drafting, So. St. Paul, High School,
Estimating Systems; IBM, Cobalt, Programs, Est-Pro, Winn-Est, Access and Excel,
Scheduling Systems; Precedence Networks, Bar- charts, Project, Primavera.
Citizenship
Dual Citizen with Canadian and American Citizenship;
U.S. Navy Military Veteran, served as Electronics Officer, Marine Engineering Officer, Command Duty Officer, CIC Officer, ASW Officer and Officer of the Deck Underway aboard the U.S.S. O’Brien, DD-725.
Attended; U.S. Naval Officer Candidate School in Newport, Rhode Island; Electronics Material Officer, ASW and Marine Engineering Schools in San Diego, California.