A leader and effective team player, with industrial experience as a process and project engineer in the
onshore sectors in design of oil/gas production, transmission, transportation and downstream processing
facilities. Experienced in Project Management Consultancy (PMC) operations for Front End Engineering
and Design (FEED) feasibility study and detailed design of oil and gas pipeline systems, olefins and
refinery processing units. Extensive design experience in pipeline hydraulics, ethylene and propylene
production processes and associated technology, including Feed Cracking, Quenching, Compression,
Contaminant Removal, Dehydrating, Deethanizing, Demethanizing, and Gas treatment. Experience in
Equipment, Relief Valve, Valve and Line Sizing, Process Simulations, PFD and PID developments and
Process Safety Analysis. Have extensive experience in Project Controls and Management for multimillion
dollar projects in Engineering, Procurement, Construction and Construction Management (EPCM).
Proficiency in Window Based Software, Pipeline Studio, Pipesim, Pipephase, Hysys, Simsci Pro II, Aspen
Plus, and Project Planner Primavera Software. Knowledge in ASME/ANSI, API and CFR codes and
standards.
PR O F ESSION AL EXPER IE N C E
JACOBS-EAGLETON ENGINEERING, Houston, TX 2013-2015
Process/Flow Assurance engineer
Provide process hydraulics and project engineering for upstream and midstream sectors in design of
separating and treating facilities, pipelines, meter stations and pumps stations.
Crude Transport Pipeline, CO2/Water Injection for EOR, NGL Meter Skids/Truck Loading Terminals
Perform liquid pipeline hydraulics for flow assurance and surge analysis
Responsible for providing line and valve sizing calculations
Prepare datasheets for various equipment for RFQ purposes
Prepare basis of design, scope of work and construction specification documents
Evaluate vendor’s bid by tabulating and selecting best pricing and delivery based on technicality
Responsible for Interfacing with vendors and clients to ensure major equipment met clients’
needs/specs
Review and prepare PFD and P&IDs, piping plans and isometrics
GULF INTERSTATE ENGINEERING, Houston, TX 2011-2013
Senior Process/hydraulic engineer
Provided computational hydraulic analysis for gas, liquid and multiphase pipelines and performed
optimization studies of oil and gas gathering pipelines and associated processing faciliti es. Prepared
simulations and recommendation for natural gas dehydration, LPG recovery, and compression.
Developed process and hydraulic simulations for oil and gas production, separation and treatment
facilities; analyzed methods to increase production volumes in existing facilities; apply Best Available
Technologies for facility and pipeline operations. Provided process control requirements for input to
P&IDs and performed operations cost estimates and optimization studies for processing and pipeline
facilities. Prepared technical specifications for process equipment and prime movers.
Compressor Station and Pressure Limiting Stations, CA, Pacific Gas and Electric Co.
Compressor station site work to perform as built work in developing P&IDs
Responsible for walking down gas transmission equipment checking process flow and
abnormalities
Verified equipment, lines, controls and instrumentations on site from elementary mechanical
drawings
Reviewed mechanical drawings and made necessary changes in developing P&IDs
Compressor Station and Gas Pipeline Project (1.5 bscf d), Transcontinental Gas Pipeline Co. LLC
Performed hydraulic calculations to determine pressure requirements for gas pipeline
Responsible for performing line and equipment sizing for equipment such as gas scrubbers,
valves, flame arrestors, flanges, fittings, unit blowdown silencer and gas strainers
Performed gas volume and station/unit blowdown calculations
Review mechanical drawings, PFD and P&IDs
Performed relief valve sizing
Validate main gas line size and pressure drop
Prepared material requisition to obtain quotes from vendors f or compressor skid, metering skid,
scrubbers, ball, swing check and gate valves and actuators
Ryckman Creek Gas Storage Project (20 bscf), Peregrine Midstream Partners
Responsible for developing process simulations for withdrawal and transportation of gas to
processing and treating facilities
Performed hydraulic calculations to determine hydrate and dew point formation at different
pressures
Reviewed compressor performance data to ensure existing compressor could handle new f lows
Prepared technical bid evaluation for process equipment such as valves, scrubbers and
filter/separators
Prepared and reviewed material requisition documents
Delta Basin Joint Venture Project (30,000 bpd), Anadarko LLC
Performed hydraulic calculations to determine pressure requirements for crude oil pipeline
Responsible for performing pipeline surge control analysis
Prepared technical specifications for process equipment
Prepared and reviewed material requisition documents
DECOM INC, Houston, TX 2009-2011
Project controls
Provided knowledge and procurement of major equipment according to the needs of clients, ensuring that
optimum production is achieved and enabling them save costs
Responsible for equipment procurement for production and manufacturing companies
Planned and executed cost estimating for acquiring specific equipment
Performed budgeting, scheduling and cost control analysis
Provided technical support to clients on equipment acquisition and safety
SHAW ENERGY AND CHEM ICALS, Houston TX 2006-2009
Olefins process engineer
Developed and maintained process simulations for conceptual design and FEED packages
Developed and maintained Process Flow Diagrams (PFD) and Utility Flow Diagrams (UFD)
Performed calculations for specifying process equipment and preparation of pr ocess data sheets
for major equipment such as; Compressors, Towers, Drums, Filters and Coalescers, Pumps,
Driers, Reactors and Heat exchangers
Developed and maintained Heat and Material Balance, Line Sizing Summary, Normally No Flow
Line Summary for clients to increase production and efficiency.
Prepared Utility Balances (Steam, Cooling water, Electrical and Fuel Gas) for small to large
projects ensuring energy savings for clients
Performed detailed equipment hydraulic calculations and control valve and line sizing.
Reviewed Piping and Instrumental Diagrams (P&ID) for various clients to ensure increase
efficiency and cutting down on cost
Evaluated equipment and internals design to advice client on suitability of materials to use in
order to cut down on cost and increase production.
Participated in client and vendor meetings to suggest best procedure and materials to use by
cutting cost while increasing production and efficiency.
Prepared and maintained process design package (PDP)., process description an d operating
supervisor manual
SCOPE OF WORK
800 KTA Ethylene Liquid Cracker Plant- Exxon Mobil Singapore,
Developed and maintained process simulations for feed area, quench water circulation and
depropanizer
Developed and maintained Process Flow Diagrams (PFD) and Utility Flow Diagrams (UFD)
Prepared Heat and Material balances
Performed detailed equipment hydraulic calculations and control valve and line sizing
450 KTA Ethylene Liquid Cracker Plant- Fushun, China,
Prepared Heat and Material balances
Produced Process Flow Diagram for Cracked Gas Compression, Deethanizer, C2 splitter and
refrigeration area
Simulated the C2 Splitter, Ethylene and Propylene refrigeration utilizing Pro II software
Performed sizing of drums, coalescers, heat exchangers and C2 Splitter
Reliance Refinery, India- PRU Unit
Responsible for simulating the Propylene Recovery Unit (PRU) from products of the FCC unit
Simulated C3 Splitter and associated equipment
Designed and specified equipment in PRU and generated datasheets
WILSAM OIL & GAS CONSULTANTS, Houston, TX 2004-2006
Project engineer trainee
Provided FEED and Detailed Engineering work for Oil and Gas offshore Platform for major mechanical
equipment. Was responsible for design of Offshore Platform Mechanical Equipment, specification,
datasheets and Technical Bid Evaluation (TBE). Reviewed PFD’s, UFD’s and P&ID’s. Procured
mechanical packaged equipment for the platform in detail design through EPC Tender. Also provided project
engineering work included in Refinery expansion project per API and ANSI/ASME requirements.
ED U C AT IO N
MS Engineering (Chemical Eng.), Prairie View A&M University, Prairie View, TX, Dec 2005
BS Chemical Engineering, University of South Alabama, Mobile, Al, May 2003
T EC H NIC AL SK IL L S
Stoner Pipeline Simulator, Pipeline Studio, Winsim Design II, Pipesim, SPT Olga, Sim Sci Pro II, Aspen
Plus, Hysys by Aspen, Chemcad, Primavera Project Planner 6.0, MathCAD, MS Project, Word, Excel
PR O F ESSION AL R EG IST R AT IO N S AN D AF F IL I AT IO N S
American Institute of Chemical Engineers
National Society of Black Engineers
Gulf Coast Regional Blood Center