RESUME
MRS. SHOBHA KAKARADDI
Yarmook
SHARJAH
Mobile no: +971*********
E-MAIL: **********@*****.**.**
OBJECTIVE:
To pursue a challenging career as an architect, within the fields of Design (Architectural as well as interior), Architecture and Construction that will utilize my technical knowledge and design skills, giving way to my creativity and ideas through my designs and be a resourceful person.
Qualification: Bachelors Degree in Architecture
Key Skills:
Architectural & Interior Design.
SUMMARY:
An astute professional with qualitative work experience in Architectural, Interior Design & Engineering. Qualitative experience in preparing project plans / layouts and resource management. Demonstrative excellence in the successful execution of various projects. Preparing and reviewing Architectural designs, Method Statements, Work Specific Quality Control Plans and BOQ.
Developing concepts & analyzing the requirements to assist client understand the project. Planning and evolving designs for corporate offices, and commercial/institutional establishments.
• Expertise in architectural planning, drafting & building technologies.
• Work well with vendors across private, commercial & public sectors.
• Technical skills include & expertise in various architecture models.
• Take concepts to creation while effectively managing all resources.
• Proficient in computer aided drawing & hand sketching of drafts.
• Created unique architectural designs reflecting client vision.
• Incorporated modern building techniques into historic renovation plans.
• Developed a building expansion for the construction of industrial space using mostly concrete & glass.
• Co-ordinate with Marketing, Tender, All MEP services & Sub-contractors. ADDITIONAL SKILLS:
Proficiency in AUTOCAD 2014, Revit 2015, 3D Studio Max, Photoshop & Windows Office EXPERIENCE : 20 Years in India and UAE
I) COMPANY (Sept’ 2014-Current): ARCHCORP Consultants Dubai (UAE) Position Held & Nature of Job : Sr Architect
Position Held & Nature of Job : Sr Architect
Preparing schematic & Detail design drawings as per authority rules & green building requirements. Co-ordinate with structural & M.E.P services & site engineers. Conduct meetings with client’s when necessary. Check & co-ordination with different finishing items from suppliers & sub-contractors.
Projects Handled
:
A) Emirates Hill Villa Dubai.
Located in the Emirates Hill Third area Dubai. It has a total plot area of 3714 sq.m 1) Parking provision of 4 cars with landscaping.
2) Building structure with basement (parking cooking area with pump room spa & Gym facilities) ground & first floors. (Total Built-up areas up to 4487 Sq.Mt) B) Noora & Hana Beach Villa at Ras Al Khaimah
Located in the AL Haditha area Ras Al Khaimah. It has a total plot area of 6970 sq.m 1) Parking provision of 8 cars with landscaping.
2) Building structure with ground first floors of 2 buildings. 3) 2 No.r Driver Quarters, 2 No.r Pool deck Buildings with swimming pool facing to sea side.
(Total Built-up areas up to 1555 Sq.Mt)
C) Maryam Moosa Villas at Dubai
Located in the UMM Squaim 2nd area Dubai. It has a total plot area of 2767 sq.m of 2 plots 1) Parking provision of 12 cars with landscaping.
2) Building structure with ground first floors of 6 buildings.
(Built-up areas up to 2075 Sq.Mt).
D) ADCI Headquarters Office Building at Dubai
Located in the Al Barsha area Dubai. It has a total plot area of 4494 sq.m 1) Parking provision of 99 cars with designed landscaping. 2) Building structure with basement, ground, 4 typical floors with pool deck & Gym facilities.
(Built-up areas up to 8000 Sq.Mt).
I) COMPANY (June’ 2006-August ‘2014): SYSTEM CONSTRUCT Dubai (UAE) Position Held & Nature of Job : Sr Architect
Co-ordinate with architectural department, structural, M.E.P., marketing, services (project coordinators), site engineers & project managers & conduct meetings with client’s when necessary .Check scope of work & prepare finishes accordingly, Prepare color scheme interior & exterior, Check finishes schedule & shop drawings. Check co-ordination drawings for MEP,shop drawings of different finishing items from suppliers & sub contractors. Projects Handled
:
A) SAMA DUBAI-Labour Village at Jabel ali Industrial area Dubai, Located in the Jabel Ali Industrial area Dubai. It has a total plot area of 105868 sq.m this project is good demonstration building in the world for lab ours. Cost of project is 600 Million Dhs. The project includes:
1) Parking provision of 65 buses +28 cars with designed landscaping. 2)13 Buildings (Each bldg structure with ground + 3 floors Built-up areas up to 6712 Sq.Mt). 3) Ground + First floor building of Supermarket, Clinic, Community Hall & 2 Services Buildings upto 4300 Sq.Mt.
4) Mosque-ground floor structure with built-up area up to 500 Sq.Mt. 5) Service buildings (substation, RMU area upto-600 Sq.Mt) & guard room (area up to 150 sq.mt) B) ADNOC PROJECTS
ADNOC-Ruwais housing complex expansion phase-III.
1) Project –Ruwais housing expansion Design &build Married staff accommodation facilities & related infrastructure package-11.
Ground + 11 floors residential apartments of total 14 buildings +central plaza building +Mosque. Total built-up area 26,598 sq.mt. Cost of project 400million Dhs. 2) Project - Design & construction of industrial male & female health club Total built-up area 9750 Sq.mt with parking amenities. Cost of project 60million Dhs. 3) Project – Design &build of New Auditorium, Mosque, sports hall, swimming Pool & ablution building with parking +landscaping. Total built-up area 20,000 sq.mt. Cost of project 100million Dhs. 4) ADNOC 7 filling stations at Abu Dhabi,
Total 60 million budget project.
5) Project – Design &build of married staff accommodation & bachelore staff accommodation building with parking +landscaping.
Project consists of single rooms and one bedroom & two bedroom apartments’ buildings total each 8 buildings up to 3 floors. Cost of project 200million Dhs. 6) Project – Design &build of New Auditorium,Mosque, sports hall,swimming pool & ablution building with parking +landscaping.
Total built-up area 20,000 sq.mt. Cost of project 100million Dhs. 7) Project – Design &build of Slaughter house building with parking +landscaping At Abu Dhabi.
Total built-up area 4000 sq.mt. Cost of project 10million Dhs. 8) Project – Construction of new Ruwais Hospital-phase-3-ground +2floors Building with parking +landscaping.
Total built-up area 54,000 sq.mt. Cost of project 60million Dhs. 9) Project – Construction of Kindergarten & Primary school building with parking
+landscaping at Sas AL Nakhl .
Total built-up area 15000 sq.mt. Cost of project 46million Dhs. 10) Project – Construction of Kindergarten +Primary school building with parking
+landscaping at Madinat Zayed city Abudhabi.
Total built-up area 15,500 sq.mt. Cost of project 48million Dhs. C) Arabian Automobiles Showroom, Offices & work Sharjah. Located in the Alharma, Sharjah. It has a total plot area of 10340 sq.m. Cost of project is 80 Million Dhs.
The project includes:
1) Parking provision of 60 cars with designed landscaping. 2) Showroom, offices & all services buildings.
D) Dr,Al Aziz Makhawi villa at Khawneej - Dubai.
E) Warehouse with offices at Kizad.
F) Dubai ports & customs at Hamriya freezone Dubai. G) MR.FADI CHEHABEDDINE’s villa.
H) NABOODAH SHOWROOM
J) FAYFA CHEMICALS FACTORY AL GERGAWI LABOUR CAMP. K) DUBAI EXPRESS-WAREHOUSE & OFFICE BLDG .
L) MATES LIGHTING FITTINGS EST SERVICE BOX FACTORY M) AL FAREDHOONI LABOUR ACCOMODATION
N) SHEIKHA ITALIAN INDUSTRY-SHOWROOM
O) SAYEGH MIDDLE EAST LABOUR ACCO.
P) KROMBERG & SCHOBERT GMBH
Q) AL RAMS TRADING LLC.
R) Mr.Farhan Faredhooni Labour accomodation.
S) Mr.Mohammad Abulla Ali AL Gergavi Labour accomodation. T) Mr.Hassan Ahmed Khadam-B+G+1+GYM building at Dubai. U) Biotech (Tecom)-Warehouse & offices at Dubai.
V) Empower – Factory & office building at Dubai.
X) Ali & sons – showroom & office building at Mussafah at Abu Dhabi. Y) Rafton Foundation School Al Reem Island at Abu Dhabi Z) Ajman Co-Operative supermarket & Offices.
II) COMPANY (May 2003-Apr 2006): SLM AND ARCHITECTS. Mumbai Position Held & Nature of Job: Sr. Architect / Project leader The job involved preparing initial measured drawings, presentations for competitions, conceptual drawings, meeting with the clients & developing the design to suit their needs, procuring the materials & presentation with material concepts. After finalizing the design with the clients working drawings had to be made and given to the clients. Client’s approved designs any modifications in structure we have to take approval from municipality & preparing municipal drawings. Preparing all structure & interior working drawings, Co-ordinate with structural, MEP.After finalizing the design with the clients, working drawings to be prepared and given to the clients & all services. Co-ordinate with our design teamwork, subcontractors, supervision & execution on site, checking the bills of the contractors & preparing bill of quantities. I) ESSAR CONSTUCTIONS LTD PROJECTS:
AT HAZIRA: GUJARAT
A) BPO -Call Centre
B) Officer’s Hostel
C) Briquette house (Renovation works).
D) GET Colony-Gym & Canteen building.
E) Coffee shop at Lake View & HBI Canteen.
F) Coil club expansion, control building & Essar power –Admin area. AT VISHAKPATNAM & CHATTISGARH: ANDHRAPRADESH
G) Executive Guest house - - Vishakpatnam
H) Officer’s Hostel - Vishakpatnam
I) Officer’s Hostel – Bailadilla-Chattisgarh
J) Control building,CCR office,MRSS Substation bldg, Security building - Vishakpatnam K) Admin Building – Vizag
AT MUMBAI: MAHARASTRA
L) Agrotech Building (Interior)
M) Essar house (renovation)
II) SAHARA INDIA PARIVAR: AMBY VALLEY-MUMBAI
A) VILLAS
lll) RESIDENTIAL-INTERIOR
a) Mr. Prakash Shah-1800 sq.ft flat of 3bed room flat at Ghatkopar-Mumbai. b) Mr. Amar Shinhji -1500 sq.ft of 2 bed room flat at Sewri-Mumbai. c) Mr. Ambrish Modi-2000 sq.ft of 2 bed room flat at Powai-Mumbai. d) Mr. Roopkumar Rathod-3000 sq.ft of 4 bed room flat at Worli-Mumbai. III) COMPANY (Nov’ 2001-March ‘2003): JAGDISH MISTRY ASSOCIATES. Mumbai Position Held & Nature of Job: Architect
The job involved preparing initial measured drawings, conceptual drawings, meeting with the clients & developing the design to suit their needs, procuring the materials & presentation with material concepts. After finalizing the design with the clients working drawings had to be made and given to the clients. Client’s approved designs any modifications in structure we have to take approval from municipality & preparing municipal drawings. Preparing all structure & interior working drawings, Co-ordinate with structural, MEP.After finalizing the design with the clients, working drawings to be prepared and given to the clients & all services. Co-ordinate with our design teamwork, subcontractors, supervision & execution on site, checking the bills of the contractors & preparing bill of quantities.
A) COMMERCIAL & RSIDENTIAL INTERIOR
1) GEM ART Office at Nariman point
2) Endo-Vascular - Office at Mumbai.
3) Mr. Rupesh Gupta-1450 sq.ft flat of 3bed room flat at Vile Parle-Mumbai. 4) Mr. Sampat –Director of Rubber Industries -4000 sq.ft of 5 bed room duplex flat at Santacruz- Mumbai.
IV) COMPANY (Oct’ 97-Oct ‘2001): BORKAR KAPDI ARCHITECTS. Mumbai Position Held & Nature of Job: Assistant Architect The job responsibilities involve developing the initial conceptual drawings given by Sr.Architects,
& preparing initial measured drawings, presentations for competitions, conceptual drawings, meeting with the clients & developing the design to suit their needs, procuring the materials & presentation with material concepts. After finalizing the design with the clients working drawings had to be made and given to the clients. Client’s approved designs any modifications in structure we have to take approval from municipality & preparing municipal drawings. Preparing all structure & interior working drawings, Co-ordinate with our design teamwork, subcontractors. A) Taj Flight kitchen at Mumbai
B) Asia Pacific Hotel Benalium Goa. .
C) Pizza-Hut Projects:
D) Dev’s Nirman Mall at convent street Pune.
E) Proposed Bungalows S.R 570/1, 570/2 Dist: Nashik, Makhalabad. F) Anand combines Nashik Pvt Ltd.
G) Sanghi Motors Ltd-Mumbai.
V) COMPANY (July’ 95-Sept ‘97): BHAGWATI DESIGNS & ASSOCIATES. Mumbai Position Held & Nature of Job: Junior Architect
The job responsibilities involve developing the initial conceptual drawings given by Sr.Architects,
& designed some of admin building & residential buildings. Preparing initial measured drawings, presentations for competitions, perspectives, conceptual drawings. After finalizing the design with the clients working drawings had to be made and given to the clients. Designing as per client’s requirement. Municipal drawings for submission as per local laws. Develop conceptual drawings to working drawings, detail drawing etc. Co-ordinate with structural & MEP departments. A) Raymond Calitri Denim Ltd Yavatmal Gujrat.
B) Morarjee Brembana at Butibori, Gujrat.
C) Birla Cellulose at Madya Pradesh.
D) Gujarat Glass at Kosamba Gujrat.
E) Miranda Tools,
VI) COMPANY ( Dec’ 93-Jan ‘95) : B.K.JOSHI ARCHITECT & INTERIOR Position Held: Junior Architect.
AFFILIATIONS: Registered Member of the Council of Architecture (India) VISA STATUS: UAE Residence (Husband)