SR. WELL ENGINEER

Address: Lago Alberto No ***. Edf. Ten. PH 1C. Del. Miguel Hidalgo. Colonia Anáhuac. DF. Mexico.

Phone:(+57)1-8024909

Cel: +57-320*******

Cel: (+52)-1-553-***-****

E-mail: ******@*****.***

Valmore Javier Rodríguez Ortiz

Objective

Obtain employment as a Sr. Well Engineer in an operating or services oil company, to further develop my skills in new and challenging drilling projects and to contribute based in my experience in different operations.

Work Experience

Sr. Well Engineer for Gas Wells – Schlumberger Oilfied Services 11/2014 - 04/2015

Integrated Project Management – Well Construction. Rio de Janeiro. Brasil.

Client: Parnaíba Gas Natural.

In charge of a engineering department for drilling and completion of gas wells.

oResponsible for well design, logistics, cost control of drilling and completion in vertical and directional gas wells.

oTechnical advice and application support to client.

oMonitor drilling operation and implementation of new technologies to client.

Sr. Well Engineer. Bidding Engineer – Schlumberger Oilfied Services 08/2013 - 11/2014

Integrated Project Management - Well Construction. México City. Mexico.

In charge of the engineering and cost for technical and economical proposals in tenders and biddings for Integrated Projects as well as services oriented tenders for Mexico, Guatemala and Caribbean.

Engineering Manager – Schlumberger Oilfied Services 02/2013 - 08/2013

Integrated Project Management. Tampico. Mexico.

Client: Diavaz Sinopec.

Integrated Project Management – Well Construction

On charge of the engineering department for three drilling rigs and one completions rig.

oMain responsible for design approval and cost control for drilling and completion in shallow horizontal wells with MPD/UBD.

oTechnical advice and application support to client.

oMonitor drilling operation and implementation of new technologies to client.

Sr. Drilling Advisor. Extended Reach Wells – Schlumberger Oilfied Services 11/2010- 02/2013

Integrated Project Management. Varadero, Cuba.

Client: CUPET

Provided planning, surveillance and performance improvement services on ERD wells.

oWell Site hole condition monitoring expert and technical liaison with technical staff.

oProvide technical advice, on-the-job training, and application support to client.

oMonitor of drilling operation included: drilling parameters, drilling & tripping practices, mud properties, vibration behavior (axial, lateral, stick-slip), study of geohazards (abrasive/ fluid loss zones, wellbore instability), bha optimization, new technologies.

Sr. Well Engineer – Schlumberger Oilfied Services 04/2009-11/2010

Integrated Project Management – Well Construction. Poza Rica, México.

Client: PEMEX

Responsible for 3-rig drilling cells in a brown field rejuvenation program.

oPlanning, feasibility studies, detailed well design and follow-up for pads of multiple wells.

oImplementation of remote drilling operation for drilling rigs.

oDrilling optimization of several fields that led to time reduction and cost optimization.

Sr. Well Engineer- Schlumberger Oilfied Services 08/2008-04/2009

Integrated Project Management – Well Construction. México City, México.

Engineering Support for Latin America.

Engineering studies and optimization analysis for projects in México.

Technical tender support for bids in Colombia and Ecuador.

Supporting staff of operation in projects of gas wells in North of Mexico.

Monitoring compliance of QA/QC of Mexico Projects.

oInvestigation and analysis of root causes of catastrophic events in Mexico South projects.

Analysis of risk for HP-HT wells in Southern Mexico.

Well Engineer – Schlumberger Oilfield Services 04/2006 – 08/2008

Integrated Project Management – Well Construction. Bogotá, Colombia.

Client: ECOPETROL

oEngineer in charge of design well programs for two drilling rigs.

oInfield drilling and well replacement of oil wells and water injector wells.

oEngineering studies, Well design. Logistics, AFE and cost control.

Well Engineer – Schlumberger Oilfield Services 04/2004 – 04/2006.

Integrated Project Management – Well Construction. Reynosa, México.

Client: PEMEX

Burgos Project IV & V – Gas wells development for multiple fields in Northern Mexico.

Provided integrated drilling services from planning through well handover.

oWell design, casing design, drilling program preparation, execution and evaluation. AFE preparation and cost control, daily monitoring.

oTime planning using Drilling-the-Limit (DtL)

oEnd of well report and lessons learned preparation.

Night Drilling Supervisor

Integrated Project Management – Well Construction.

Poza Rica, México. Client: PEMEX 03/2003-04/2004

Ciudad Ojeda, Venezuela. Client: PDVSA 08/2001-03/2003

Assistant well site supervisor on 28x 28 rotation in barge and land rigs.

oNight drilling supervisor, drilling operation, logistics, Rig move coordination.

oQHSE supervising and implementation.

Jr. Reservoir Engineer 2001

Ingeniería Tecnosinergia. Reservoir Consultants. Caracas, Venezuela. Client: PDVSA.

Reservoir simulation and characterization using SLB -Geoquest Simulation software as well as conventional tools. Reserves estimation on black oils and gas condensate reservoirs.

Industry Training

Trouble Free, High Angle, ERD & Complex Wells Course. Aberdeen. Scotland. Oct. 2013.

IWCF Surface BOP Stack Supervisor. Certificate – Valid. 2yr. Nr. S 000*****-**-FWJF Jul. 2013.

Lean Certification Level I and II. Poza Rica. México. Sept. 2010.

Introduction to Project Management. ESI International. Villahermosa México. Sept. 2010.

Diplomate in Probabilistic Risk Analysis for Drilling and Production Projects (with Crystal Ball) 2008

OFS-4. “Finance Principles”. Rio de Janeiro, Brazil. Oct. 2006.

Preventive Well Control – Bogotá, Colombia. Aug. 2006.

OFS-3 – Personnel Management Training – Houston, USA. Mar. 2005.

Drilling & Production Technology – Schlumberger Training Center, Pau, France Dec. 2002.

Introduction to Drilling and Production Technology – SLB Training Center, Pau, France Mar. 2002.

“Integrated Petroleum Reservoir Management”. PDVSA-CIED. Caracas. Aug. 2000.

Educational Experience

Software

Skills

Bachelor of Science in Petroleum Engineering Jun. 2001. Universidad Central de Venezuela. Caracas. Venezuela.

Teaching Assistant. Reservoir Engineering. Oct. 1999 – Jun. 2001.

Drilling Office Suite – Directional Drilling, Casing design, BHA Optimization, T&D, Hydraulics – Schlumberger

Osprey Operations Management – Reporting system and performance analysis – Schlumberger

Osprey Risk- Risk Analysis Software – Schlumberger.

TDAS – Casing and tubing design analysis – Schlumberger.

Microsoft office suite – Word, Excel, PowerPoint.

Crystal Ball.

Nationalities

Languages

Spoken

References

Venezuelan Native.

Mexican natural.

Spanish – Mother tongue

English – Fluent.

Portuguese – Basic.

Pilar Amieva Paige. DW Well Engineer Angola. BP Plc. London. UK. Tel: +441*********. Mob: +447*********. *****.******@**.**.***

Johnny Cabanilla. Sr. Well Engineer. Chevron. Angola. +244-*********. ****@*******.***

Julio Kemenyfy. Senior Drilling Engineer. Geoenergie-Bayer. Germany. +49-941-******-***.

*****.********@**********-******.***

Shara Ciravolo Fesser. VP Schlumberger Information Solutions. Brazil. Tel: +552*********. Mob: +552**********. *******@********.***.***