Resume of Kyle V. Alvarez
*******.****@*****.***
**** ******* *****, ******** ** 80504
EXPERIENCE
MANUFACTURING, CONSTRUCTION, RETAIL
Trelleborg Sealing Solutions, Louisville CO
March 2015 to Currently Employed
I am employed to Trelleborg Sealing Solutions through a company called
Contract Engineering Services. I am responsible for setting up toolpaths
for a Fanuc 21i-TB lathe to cut parts down to a precise size no larger or
smaller than one thousandth of an inch specified on the blueprints. They
also had me work in quality control and packaging.
Leed Fabrication Inc. Loveland, CO
April 2014 to December 2014
I began in hydro department where oil rig vessels were pressure tested.
After a couple months I was promoted to processing where material was cut
and shaped to proper size as preparation for welding. Experience using
articulating boom lift, personnel scissor lift, overhead crane, CNC band
saw, hydraulic metal plate cutting shears, 3-roll double-pinch hydraulic
plate bending roll machine, and hydraulic sheet metal bending machine.
Magpul of Erie, CO
October 2013 to April 2014
Started in assembling firearms magazines and was transferred to packaging
after several weeks due to my above average productivity and speed.
Experience with a plastic bag sealing machine.
Kroger/King Soopers, Longmont, CO
November 2008 to September 2013
General Merchandising. Began as courtesy clerk, quickly promoted to general
merchandise four years ago. Accomplishments: Considered a valuable
contributor. Part of that perception was promoted by taking on tasks of
assembling displays and merchandise when needed. Enjoyed appointed
positions on the store safety committee and cultural council.
WP Manufacturing, Longmont, CO
December 2007 to July 2008
Responsible for creating Mastercam tool paths and programming a CNC lathe
for parts production as well as assisting in molding process and
shipping/receiving.
Daystar Enterprises LLC, Longmont, CO
December 2006 to October 2007
Worked residential construction site. Duties included framing, construction
site clearing and safety oversite during and after project completion.
Also performed chores for Engle Homes on an as needed basis. Jobs included
sign placement and monitoring, various assemblies and repairs, general
chores at model homes. As well as pre-move-in home-preparation.
EDUCATION
Graduated from Silver Creek High School in May 2008. I trained in
engineering technology, landscaping, emergency response and other required
courses.
At the school district's Career Development Center (post high school),
completed required curriculum with emphasis on machining and engineering
technology and to a lesser degree police academy, art and basic technology.
Training included creating tool paths using Mastercam CAD/CAM software as
well as working with both manual and CNC Haas mill and lathe. I also
received the Engineering Technology Certificate in Mastercam and training
in SolidWorks. Recently I finished several precision machining classes at
Front Range Community College and received certification in entry level
machining, intermediate machining, and CNC machining. The Front Range
Community College courses also included trigonometry, calculus, entry level
QC, and sub-programming with G and M codes.
Have five months of training from a former certified mechanic who took me
under his wing teaching me basic automotive maintenance. This has allowed
me to perform a valuable service for my family, which owns three vehicles.