Post Job Free
Sign in

Engineer Construction

Location:
United States
Posted:
May 26, 2015

Contact this candidate

Resume:

CARLOS D. VÁSQUEZ

***** ********* *****

Houston, Texas 77077

Telephone Home: 281-***-**** / Cell Phone: 832-***-****

Email: **************@*******.***

J OB OBJECTIVES

Interested in a position in cost control (Procurement, management) based on my broad experience in

construction, supervision, field engineering, design, subcontract administration, cost, scheduling, procurement

and labor relations, in sports facilities, manufacturing, residential towers and complexes.

E XPERIENCE

CONSTRUCTORA ROSMAN, C.A., May 2012 – June 2013

Construction Inspection Engineer and Resident Engineer

Soccer Stadium “Jose Encarnacion Pachencho Romero”

Responsibility: Execute and supervise the design and construction activities in accordance to construction

drawings, procedures, standards and specifications.

Project Highlights: accelerated the project completion by 4 weeks in spite of having to guide under qualified

workforce and dealing with labor union delay tactics.

a) The main phase of the project at the Maracaibo 41,000 capacity soccer stadium was the replacement

of 140 prefabricated reinforced concrete benches with a higher quality concrete utilizing a hundred

foot reach telescopy crane. The project also required the design a nd construction of the drainage

system for the stadium complex including a 4 hectares extension, and parking lot; and underground

outflow system routed under the stadium connecting to the City drainage system.

b) Design and construction a sanitary sewage collection system for a 500 student body school located

inside the Pachencho Romero sports complex.

c) Design and construction of the interior structure and superstructure of the 500 student body school

located inside the sports complex Pachencho Romero, using th e computer program STAAD PRO.

PROYESCO, Feb 2012 – April 2012

Construction Inspection Engineer

Responsible for the structural analysis of a 2 story structure required by the City prior to occupancy and

operation of the Maracaibo Regional Brewery.

SUMIPECA, May 2009 – December 2011

Construction Resident Engineer

Responsibility: Execution, supervision, permitting, inspection, procurement, payroll, and labor relations.

Project Highlights: The project was challenging because as built drawings were not avai lable and remodeling

decisions had to be made every step of the way upon discovery during demolition. Beside the obstacles, 30%

cost reduction was achieved for this project.

Three (3) projects executed were:

2

a) The project consisted of a fifteen (15) floor residential tower. Each floor has two (2) 240 mts

condominiums with HVAC ductwork, utility services and elevator access. The gated residential tower

complex included a roof deck pool, concrete paved parking lot for 120 automobiles, guardhouse,

garden areas, and sitting area with BBQ grills. The structure is reinforced concrete floor slabs and

beams, and concrete block walls with stucco exterior finish. The windows are swing type. The

bathrooms were finished with ceramic floor, showers and sanitary units. The utilities provided included

electricity, water tank storage, potable water, sewer and natural gas.

2

b) The second project consisted of a five (5) floor residential tower. Each floor has two (2) 70 mts and

2

one (1) 140mts condominiums with HVAC ductwork, utility services and elevator access. The gated

residential tower complex included a concrete paved parking lot for 16 automobiles, guardhouse,

garden areas, and sitting area with BBQ grills. The structure is reinforced concrete floor slabs and

beams, and concrete block walls with stucco exterior finish. The windows are swing type. The

bathrooms were finished with ceramic floor, showers and sanitary units. The utilities provided included

electricity, water tank storage, potable water, sewer and natural g as.

Venezolana Airline Hangar at “La Chinita Airport”

c)

2

The project consisted of the replacement of 1400 mts of airplane hangar floor slabs.

OCONSA, C.A., April 2008 – April 2009

Construction Inspection Engineer and Resident Engineer

Responsibility: Execution, supervision, and inspection of the construction activities in accordance with the

construction drawings, procedures and specifications.

Project Highlights: Teamwork was vastly improved as a result of new work procedures established and the

project was completed ahead of schedule by 3 weeks. As result of the positive performance I was promoted to

a supervisory position.

2

The project consists of three (3) eighteen (18) floor residential towers. Each floor consists of two (2) 160 mts

condominiums with HVAC ductwork, utility services and elevator access. The gated residential tower complex

included a concrete paved parking lot for 216 automobiles, guardhouse, garden areas, and sitting area with

BBQ grills. The structure is reinforced concrete with reinforced floor slabs and beams, concrete block walls

with stucco exterior finish. The windows are swing type. The bathrooms were finished with ceramic floor,

showers and sanitary units. The utilities provided included electricity, water tank storage, potable water, sewer

and natural gas.

E DUCATION

Registered Professional Civil Engineer, Venezuela

Member of Venezuelan National Association of Engineering. CIV:197.495

2014 -Present Associate Degree in Business Administration (Major in procurement, finance &

management).

Houston Community College.

Houston, Texas

2003 -2008 Bachelor of Science in Civil Engineering .

Universidad del Zulia.

Maracaibo, Venezuela

2007 (Summer) Internship Civil Engineering Student

Constructora Barema.

Field Engineer at Alcazar Residential Complex

Foreign Languages: Spanish – Fluent

K NOWLEDGE AND SKILLS

W indows Office (Microsoft Word, Excel, Power Point);

AutoCAD software;

STAADPRO software;

IP3 software;

Working knowledge in construction compliance of the Collective Bargaining Agreement and Venezuelan

standards;

Advance English training at Houston Community College 2012 -2014 & Centro Venezuelan Americano del

Zulia (CEVAZ). 2006- 2008



Contact this candidate