A kshar Desai
*******@**.***, *******@*****.***
O BJECT IVE
To seek a Full t ime opportunity which could leverage my academic background, prior work experience,
superior aptitude, motivation & attitude in a relevant area to prepare me to join the workforce/your
team as a valuable contributing team member.
E DUCAT ION
Masters of Science in I ndustrial Engineering, U niversity of Houston, Texas, USA
M ay 2015
Bachelors in Mechanical Engineering, R GPV University, Bhopal, I ndia M ay
2012
SOFTWARE PROFICIENCY:
• Design : Pro-E Wildfire, CatiaV5, AutoCAD, CREO 2.0, Solid Works.
• Analysis : F luent, ANSYS, StarCCM+, Abacus.
• MasterCam Softwares : CNC programming using G& M coding and Tool path simulation.
• Piping Software : PDMS, Orcaflex and Hysys.
• Control Software : M atlab, PLC Programming.
• Microprocessor Coding : PLC, Assembly level programming.
• GU I Software : Excel Solver, Adobe Photoshop, M icrosoft Visual Studio.
• Office use : M icrosoft Vista, Mac, Microsoft Office, Excel, PowerPoint &
W indows7.
• I ndustrial Engineering : Lean Manufacturing, Simio, Arena, E rgonomics, Six Sigma
Certification(Green Belt), Time and motion studies, Kanban, Optimizing, Regression Analysis,
L ine Balancing, Cellular Manufacturing, Plant Layout, FEMA, Setup reduction strategies, Root
Cause Analysis.
PROFESSIONAL EXPER IENCE:
I nst ructional Tutor, U niversity of Houston.
A ugust ’14 – May’15
• Conducted Laboratory experiments for Fluid Mechanics Course, and taught Orcaflex to
offshore engg, class.
• Assisted professor in grading and correction.
• Tutored undergraduate students in Mathematics at Athletics and Alumni department.
Jan’ 14 – July’14
ACADEM IC PROJECTS:
Assembly Line Balancing using Simulation Techniques - T rafficware, Ltd. Houston.
Jan’14 – M ay ‘14
Ut ilized SIM IO to develop dynamic simulation model of manual assembly line to determine plant
capacity, worker utilization, cost estimation, cycle t ime, WIP, and throughput. Conducted PR-analysis,
s tudied plant layout, and performed t ime study.
- Analyzed system performance under CONWIP and Push control
- P resented staffing strategy, layout changes and queuing methodology to reduce WIP, and to increase
t hroughput by 10%.
O ptimum T ransshipment of Elect ric Power to Maintain Stability in Gr id System.
A ugust ‘13 – D ec’13
Different aspects of Ergonomics for School Children K-12. August ’14 – Dec’14
SUM MER I N TERNSH IP, Mercedes Benz, New Delhi, India.
May’10 – Aug ‘10
• Practical exposure to star vehicle diagnosis system for Mercedes Benz passenger vehicles.
• Became acquainted with software tools like AutoCAD, ANSYS, CATIA, Pro-E, Excel Solver and
Solid Edge.
• Learned Mechanical Fuel Injection System, EDC Fuel Injection System, CRS (Common Rail
F uel Injection System), MPFI Fuel Injection System, Auto Electricals, Basic Knowledge of Engine
M anagement.
Teaching Assistant in Fluids & Thermal Laboratory:
A ug 09 – May 10
I handled lab curriculum for Fluid mechanics & Heat t ransfer laboratory for diploma students. I was
responsible to bring about interactive curr iculum in imparting practical based knowledge to students.
RELEVENT COURSES
Finite Element Analysis, Entrepreneurship and Leadership Skills, Project Management, Operations
Research and Management, G roup Technology, Operations and Supply Chain Management.