Hesam Bahrami
Unit **_**** Woodbrook Pl Cell 778-***-****
Burnaby BC
V5A4G4 Email:
acppbc@r.postjobfree.com
SUMMARY
Construction/Industrial Electrician with extensive experience in systems installation,
troubleshooting, maintenance, test, code compliance and customer service. Areas of
expertise include security alarm systems, electrical panels, motor control systems,PLC
and panels, HVAC systems and emergency power generators. Responsible, detail
oriented with strong technical, analytical, problem solving, communication and relationship
management skills.
EXPERIENCE
Nightingale Electric Ltd 2013_2014 seasonal
Electrical Installer
Supported commercial (Canada Post)
Wirechief Electric Ltd 2012 to 2014
Electrical Installer
Supported commercial and residential projects.
4 Installed boxes, conduit, lighting fixture, cables, panels and stand-by power
generation.
5 Assembled and spliced cables in boxes, lighting fixtures and panels.
6 Tested, repaired and energized electrical systems.
7 Estimated and planned labor and materials for installation.
8 Performed installation of electrical systems in strict accordance with CSA
Golden ERA,Vancouver,BC 2011 to 2012
Low voltage Consulting
Supported commercial and residential projects
1 Installed cables, window and door sensors, motion sensors, keypads and panels .
2 Installed cables for CCTV, TV, telephone, data, sound and satellite systems.
3 Prepared documents for termination and programming of alarm system.
4 Estimated and planned labor and materials for installation.
5 Installed extra low voltage systems according to CSA
6 Established reputation for outstanding customer service
7 Exceptional safety record.
8 Used state of the art test equipment.
A&P Company, BC 2008 - 2011
Electrical Installer
Supported commercial and residential projects.
1. Installed boxes, conduit, lighting fixture, cables, panels and stand-by power
generation.
2. Assembled and spliced cables in boxes, lighting fixtures and panels.
3. Tested, repaired and energized electrical systems.
4. Estimated and planned labor and materials for installation.
5. Performed installation of electrical systems in strict accordance with CSA
IRAN BARGH, Iran 2002 - 2006
Industrial Electrician
Supported some projects in centre of Iran.
9 Lead teams and trained junior personnel.
10 Installed and tested electrical and control cables, transformers, generator, grounding &
lighting systems, electrical panels..
11 Installed and tested communication systems (Telephone system and Paging system)
and electrical and control cable of HVAC for substation and control room.
12 Installed and tested fire alarm system for substation and control room
13 Checked termination diagram and all wiring in substation and field.
14 Tested all cables between substation, control room and field.
15 Installed and tested instrument cables, Marshalling and panels in control rooms.
16 Prepared asbuilt drawings and documents according to final installation for HVAC, fire
alarm and lighting systems in substation and control room.
17 Estimated consumer materials according to detail standard of installation.
18 Performed of electrical installation in substation and control room according to time
schedule of project.
19 Checked installation activities in substation and control room and prepared punch lists
before energizing electrical system.
20 Checked and removed all electrical punch lists before energizing of HVAC, lighting and
fire alarm systems in substation and control room.
21 Energized and maintained of all electrical equipment in substation, control room and
field.
22 Performed preventative maintenance for all electrical equipment before handing over
the Project to owner.
POLYACRYL CORPORATION COMPANY, Iran 1995- 2002
Electrical & Instrument Technician
Supported a Petrochemical and Textile Company.
23 Performed field pre-commissioning, commissioning and troubleshooting.
24 Maintained LV/HV switchgears(3.4 Kv,11.6 Kv), transformers, motors(AC,DC motors),
drive panels, instrument devices (transmitters, control valves, control unit
25 Supported the annual overhaul for checking of electrical and instrument equipments
and Gas turbine frame 5
26 Managed a team of electrical and instrument technicians for preventive program
maintenance.
EDUCATION AND TRAINING
Electrical Code course / BCIT, Burnaby, Canada 2009
PLC and Automation Training, Germany,
Bachelor of Science, Electrical Engineering, Iran
CERTIFICATIONS
InterProvintial Read Seal Certificate of Electrician
Certificate of Qualification in the Trade of Electrician,ITA,Canada 2012
Certificate of Qualification in the Trade of Electrician (lndustrial Electrician), Montreal
2007