Post Job Free
Sign in

Engineer Technician

Location:
Tiverton, RI
Posted:
May 09, 2015

Contact this candidate

Resume:

Kevin J. Croft

** ***** *********** ***.

Tiverton - Rhode Island - 02878-3884

401-***-**** H 401-***-**** C

Email: ****@***.***

OBJECTIVE: An opportunity to be part of the development of

products in the electronic field that utilizes my

skills in diagnostics, organized testing, collaboration,

integration, quality control and

understanding of Time to Market.

EDUCATION: NEW ENGLAND INSTITUTE of TECHNOLOGY

Warwick, RI

Bachelors in Science Degree (BSC)

In Electronics Engineering Technology,

2001

Associate in Science Degree(s) (ASC)

In Electronics Engineering Technology,

1994

In Electro-Mechanical Design Drafting,

1991

NORTHEASTERN UNIVERSITY

Boston, MA

Certificate: Spring/Fall 2002

Introduction to C++ Programming, Intermediate C++ Programming

EMPLOYMENT: EMC2 CORPORATION (1995-2015)

Hopkinton, MA.

Senior Lab Systems Engineer (2007-

2015) for the VMAX/VG3R (VMax-3) Development.

Responsible for installing, configuring,

trouble shooting and recovery of storage

systems under development and associative VMs, Host,

SAN and NAS Switches including

Mainframe Connectivity. Upgrading various component firmware

such as Emulations, Bios, Post, MBR,

Boot, Maintenance Interface GUI, etc.

Senior/Software Test Engineer (2000-

2006, 2006-2007) for the DMX/VMax Development.

Responsible for testing the development

Microcode repository integrity through various system

power tests and running Fibre, ISCSI, Network and

Fibre RDF and Mainframe configuration I/O

programs as well as supporting the storage systems used for

development and all connectivity to

VMs, Servers, SAN and NAS Switches. Compile code for testing

individual issues under review and

overall operation.

Symmetrix QA Software test Technician

II (1996-2000)

Responsible for testing various aspects

of the Symmetrix family of storage array's

release codes in the area of maintenance, infrastructure

and configuration changes while

under load from sources such as ISCSI (Windows 2000), HP,

Solaris, IBM Mainframe, Fibre Channel

I/O, RDF Replication etc.. Test upgrading firmware such as Bios,

Post, MBR, etc. while system was active.

Symmetrix Manufacturing Test

Technician I (1995-1996)

Responsible for testing Symmetrix storage

array hardware in various environments

such as Heat Rooms and Cool Rooms to insure system

qualifications and integrity under stress.

Run IO from Servers and Mainframe through

Fibre channel and SCSI connections while systems

are running diagnostic code. Debug issues as they

presented themselves and work with

Diagnostic Engineers on proper course of action.

YUSHIN AMERICA (1993-1995)

Cranston, RI

Production Technician

Responsible for mechanical, electrical

and pneumatic assembly of Down Stream production

equipment for the PLASTICS INDUSTRY. Work was performed

from engineer's drawings in constant

consultation with design engineers on additions and changes.

INTERESTS: Sports, outdoor activities, mechanical

projects, building things.



Contact this candidate